POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 48items · current page 1–48 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-1ff667eb6c880d2287b73342
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_fa7faf3c90a86d97
stable_project_keyprjtDef:232545:ESB
project_definition232545
first_region_codeESB
manual_source_formatfalse
project_name154kV 서산-성연(2∏화) 건설사업
project_name_list154kV 서산-성연(2∏화) 건설사업
purpose신규부하(대산석유화학단지)공급 및 주요 ?
project_region_detailSeosan City, South Chungcheong Province
project_period_raw2018.06~2026.10
project_scale_rawSTACIR 330㎟×S×2C, 약 0.3㎞
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_756fc85614cb2efa
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_fa7faf3c90a86d97

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_fa7faf3c90a86d97

Sources EV-1ff667eb6c880d2287b73342
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d3b4e4718b5f2ecad5ff191d0b2e9d796e0e8e849a80fb087165b626bf59fbeb
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2021-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2005-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2019-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2022-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2004-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2022-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2023-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2018-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2018-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source snapshots by date · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_756fc85614cb2efa
stable_project_idkproj_fa7faf3c90a86d97
source_key202609|232545|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 서산-성연(2∏화) 건설사업
project_name_detail154kV 서산-성연(2∏화) 건설사업
region_summary_raw충청남도 서산시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 신규부하(대산석유화학단지)공급 및 주요 ?
Project region
  • Seosan City, South Chungcheong Province
Project period
  • 2018.06~2026.10
사업 규모
  • STACIR 330㎟×S×2C, 약 0.3㎞
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2019.05~2019.05 경과지(부지) 확정: 2018.10
환경/재해 영향평가
  • 환경영향평가: 2021.06 ~ 2022.06 재해영향평가: 2021.06 ~ 2022.06
주민의견 수렴
  • 지자체 공고 열람: 2021.04 ~ 2021.04 설명회·공청회: 2021.04 자체설명회: 2020.09 ~ 2022.04
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.07 ~ 2022.10 실시설계: 2022.11 ~ 2023.11 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2024.04 공사 기간: 2024.04 ~ 2026.03 감독자: [redacted], 실적): 99, 54
[추진실적] □‘18.06 : 제8차 장기 송변전설비계획 신규반영(단일계통 보강사업) □‘18.09 : 345kV 신성연S/S 및 연관T/L 건설사업 후보지 현장답사 □‘18.10 : C/H 철탑 부지 확정 □‘19.04 : 서산-성연 송전선로 경과지 측량 완료 □‘19.05 : 지자체 사업안내 및 지장유무조회 완료(서산시) □‘20.06 : 철탑 인접도로 지장유무조회 완료(서산시, 예산국토관리사무소) □‘20.09 : 마을주민 대상 사업설명회 시행(고남3리) □‘21.02 : 송전선로 예정 경과지 지장유무조회 회신 완료(서산시) □‘21.04 : 사업시행계획 제출(서산시, 산업부) 및 열람?공고 □‘21.04 : 실시계획승인신청을 위한 주민설명회 시행(고남3리, 오사3리) □‘22.02 : 중토위 협의요청 공문발송(산업통상자원부) 및 LTIS 입력 □‘22.06 : 실시계획 승인고시(산업통상자원부) □‘22.10 : 기본설계 완료 □‘23.05 : 기본안전보건대장 작성 □‘23.11 : 실시설계 완료 □‘24.01 : 공사계약 □‘24.04 : 공사착공 □‘25.04 : 154kV 서산-대산#3·4T/L 가선로 구성(04.23 ~ 05.02) □‘25.11 : 154kV 서산-대산#3·4T/L 본선로 구성 □‘25.07 : C/T 기초 시공 완료 [향후계획] □ ‘26.01 : C/T 전력구(입상부) 시공 완료 대기 □ ’26.03 : 154kV 서산-대산#3·4T/L 본선로 구성(휴전작업)
future_plan_redacted□ 향후계획 [추진실적] □‘18.06 : 제8차 장기 송변전설비계획 신규반영(단일계통 보강사업) □‘18.09 : 345kV 신성연S/S 및 연관T/L 건설사업 후보지 현장답사 □‘18.10 : C/H 철탑 부지 확정 □‘19.04 : 서산-성연 송전선로 경과지 측량 완료 □‘19.05 : 지자체 사업안내 및 지장유무조회 완료(서산시) □‘20.06 : 철탑 인접도로 지장유무조회 완료(서산시, 예산국토관리사무소) □‘20.09 : 마을주민 대상 사업설명회 시행(고남3리) □‘21.02 : 송전선로 예정 경과지 지장유무조회 회신 완료(서산시) □‘21.04 : 사업시행계획 제출(서산시, 산업부) 및 열람?공고 □‘21.04 : 실시계획승인신청을 위한 주민설명회 시행(고남3리, 오사3리) □‘22.02 : 중토위 협의요청 공문발송(산업통상자원부) 및 LTIS 입력 □‘22.06 : 실시계획 승인고시(산업통상자원부) □‘22.10 : 기본설계 완료 □‘23.05 : 기본안전보건대장 작성 □‘23.11 : 실시설계 완료 □‘24.01 : 공사계약 □‘24.04 : 공사착공 □‘25.04 : 154kV 서산-대산#3·4T/L 가선로 구성(04.23 ~ 05.02) □‘25.11 : 154kV 서산-대산#3·4T/L 본선로 구성 □‘25.07 : C/T 기초 시공 완료 [향후계획] □ ‘26.01 : C/T 전력구(입상부) 시공 완료 대기 □ ’26.03 : 154kV 서산-대산#3·4T/L 본선로 구성(휴전작업)
attachment_count0
source_detail_sha256b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232545|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source snapshots by date · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_fa7faf3c90a86d97
stable_project_keyprjtDef:232545:ESB
project_definition232545
first_region_codeESB
manual_source_formatfalse
project_name154kV 서산-성연(2∏화) 건설사업
project_name_list154kV 서산-성연(2∏화) 건설사업
purpose신규부하(대산석유화학단지)공급 및 주요 ?
project_region_detailSeosan City, South Chungcheong Province
project_period_raw2018.06~2026.10
project_scale_rawSTACIR 330㎟×S×2C, 약 0.3㎞
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_756fc85614cb2efa
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_fa7faf3c90a86d97

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_fa7faf3c90a86d97

Sources EV-1ff667eb6c880d2287b73342
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d3b4e4718b5f2ecad5ff191d0b2e9d796e0e8e849a80fb087165b626bf59fbeb

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel