POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 56items · current page 1–56 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 서예산S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-2dd0635f6a37ba9b540cfc2d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5468a835f5d11a9f
stable_project_keyprjtDef:231380:ESB
project_definition231380
first_region_codeESB
manual_source_formatfalse
project_name154kV 서예산S/S 건설사업
project_name_list154kV 서예산변전소 건설사업
purpose내포신도시, 예산, 홍성지역 등 신규부하 공급 및 기설변전소(홍성, 응봉
project_region_detail충청남도 예산군
project_period_raw2024.02~2028.10
project_scale_raw45/60MVA X 2BANK
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0a356efd873993c2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_5468a835f5d11a9f

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5468a835f5d11a9f

Sources EV-2dd0635f6a37ba9b540cfc2d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e9c1d3e2c8a8f38dc6557ebee6b6455c72fc52b080ecad005e06d73731f06057
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2015-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2025-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2025-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2024-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2025-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2015-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2020-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source snapshots by date · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_0a356efd873993c2
stable_project_idkproj_5468a835f5d11a9f
source_key202609|231380|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 서예산변전소 건설사업
project_name_detail154kV 서예산S/S 건설사업
region_summary_raw충청남도 예산군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 내포신도시, 예산, 홍성지역 등 신규부하 공급 및 기설변전소(홍성, 응봉
Project region
  • 충청남도 예산군
Project period
  • 2024.02~2028.10
사업 규모
  • 45/60MVA X 2BANK
담당 사업소
  • 중부건설본부/직할
계획확정
  • 제07차 장기송변전설비계획 반영(2015.10)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2020.01
환경/재해 영향평가
  • 환경영향평가: 2024.07 ~ 2025.01 재해영향평가: 2024.07 ~ 2025.04
주민의견 수렴
  • 지자체 공고 열람: 2024.02 ~ 2024.03 설명회·공청회: 2024.02 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ '15.10 : 제7차 장기송변전설비계획 반영 □ '20.01 : 변전소 입지확정위원회 시행 □ '20.02~'24.02 : 변전소 및 송전선로 건설 관련 지자체 및 주민협의 □ '22.08 : 특별지원협의서 체결(신리마을) □ '22.11 : 특별지원협의서 체결(송산리마을) □ '23.10 : 특별지원협의서 체결(신평2리 4반마을) □ '23.12 : 특별지원협의서 체결(신평2리 본마을) □ '24.02 : 특별지원협의서 추가 체결(신리마을) □ '24.02~03 : 사업시행계획에 대한 지자체 공고 및 열람 □ '24.02 : 전력설비 건설사업 주민설명회 시행 □ '24.07 : 전원개발사업 실시계획 승인 신청 □ '25.08 : 전원개발사업 실시계획 승인 고시 □ '26.07 : 특별지원 합의서 체결(신리마을)
전원개발사업 실시계획 승인
  • 2025.08
사업설계
  • 설계용역: 기본설계: 2024.11 ~ 2025.03 실시설계: 설계담당자: [redacted]
line 1. 추진경과 □ '22.08, '22.11 : 신리, 송산리마을 특별지원사업비 협의서 체결 □ '22.12, ‘23.01, ’23.03 신평2리마을 반대집회 개최(중부건설본부사옥) □ '23.10~ : 신평리 2리(4반마을) 특별지원사업비 협의서 체결 완료 □ '23.12~ : 신평리 2리(본마을) 특별지원사업비 협의서 체결 완료 □ '24.02 : 신리마을 특별지원사업비 추가지원 협의서 체결 □ '24.07 : 전원개발사업 실시계획 승인 신청 □ '24.12 : 기본설계 통합(변전, 토건) 심의위원회 시행 □ '25.02 : 소규모 환경영향평가 조치계획 제출 □ '25.03~04 : 군관리계획 시설 결정 협의(예산군청 도시계획팀) □ '25.05 : 농지전용협의 완료(예산군청 농정유통과) □ '25.06 : 실시계획 조치계획서 최종 제출 □ '25.08 : 실시계획 승인 고시(산업부) □ '25.09 : 용지매수 의뢰 □ '25.10 : 변전소 부지 인근 거주자 및 숙박시설 소유주 대민협의 □ '25.11 : 건설사업 민원대응 관련 관계자회의 시행 □ '25.12 : 변전소 부지 인근 거주자 민원 협의 □ '26.01 : 용지매수 관련 감정평가시행 □ '26.02~ : 용지 협의매수 □ '26.02 : 진입로 및 전력구 권원확보 관련 예산군 대관협의(1차) □ '26.03 : 진입로 및 전력구 권원확보 관련 예산군 대관협의(2차) □ '26.07 : 진입로 및 전력구 도로점용 허가 신청(→ 예산군청) 2. 향후계획 □ '26.09 : 전력구 및 진입로 권원확보 대관협의 시
future_plan_redactedline □ 향후계획 1. 추진경과 □ '22.08, '22.11 : 신리, 송산리마을 특별지원사업비 협의서 체결 □ '22.12, ‘23.01, ’23.03 신평2리마을 반대집회 개최(중부건설본부사옥) □ '23.10~ : 신평리 2리(4반마을) 특별지원사업비 협의서 체결 완료 □ '23.12~ : 신평리 2리(본마을) 특별지원사업비 협의서 체결 완료 □ '24.02 : 신리마을 특별지원사업비 추가지원 협의서 체결 □ '24.07 : 전원개발사업 실시계획 승인 신청 □ '24.12 : 기본설계 통합(변전, 토건) 심의위원회 시행 □ '25.02 : 소규모 환경영향평가 조치계획 제출 □ '25.03~04 : 군관리계획 시설 결정 협의(예산군청 도시계획팀) □ '25.05 : 농지전용협의 완료(예산군청 농정유통과) □ '25.06 : 실시계획 조치계획서 최종 제출 □ '25.08 : 실시계획 승인 고시(산업부) □ '25.09 : 용지매수 의뢰 □ '25.10 : 변전소 부지 인근 거주자 및 숙박시설 소유주 대민협의 □ '25.11 : 건설사업 민원대응 관련 관계자회의 시행 □ '25.12 : 변전소 부지 인근 거주자 민원 협의 □ '26.01 : 용지매수 관련 감정평가시행 □ '26.02~ : 용지 협의매수 □ '26.02 : 진입로 및 전력구 권원확보 관련 예산군 대관협의(1차) □ '26.03 : 진입로 및 전력구 권원확보 관련 예산군 대관협의(2차) □ '26.07 : 진입로 및 전력구 도로점용 허가 신청(→ 예산군청) 2. 향후계획 □ '26.09 : 전력구 및 진입로 권원확보 대관협의 시
attachment_count0
source_detail_sha2564dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231380|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source snapshots by date · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5468a835f5d11a9f
stable_project_keyprjtDef:231380:ESB
project_definition231380
first_region_codeESB
manual_source_formatfalse
project_name154kV 서예산S/S 건설사업
project_name_list154kV 서예산변전소 건설사업
purpose내포신도시, 예산, 홍성지역 등 신규부하 공급 및 기설변전소(홍성, 응봉
project_region_detail충청남도 예산군
project_period_raw2024.02~2028.10
project_scale_raw45/60MVA X 2BANK
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0a356efd873993c2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_5468a835f5d11a9f

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5468a835f5d11a9f

Sources EV-2dd0635f6a37ba9b540cfc2d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e9c1d3e2c8a8f38dc6557ebee6b6455c72fc52b080ecad005e06d73731f06057

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel