POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 56items · current page 1–56 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-2dd0635f6a37ba9b540cfc2d
Detailed source fields Original source field Published value or condition stable_project_id kproj_5468a835f5d11a9f stable_project_key prjtDef:231380:ESB project_definition 231380 first_region_code ESB manual_source_format false project_name 154kV 서예산S/S 건설사업 project_name_list 154kV 서예산변전소 건설사업 purpose 내포신도시, 예산, 홍성지역 등 신규부하 공급 및 기설변전소(홍성, 응봉 project_region_detail 충청남도 예산군 project_period_raw 2024.02~2028.10 project_scale_raw 45/60MVA X 2BANK responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_5468a835f5d11a9f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5468a835f5d11a9f
Sources EV-2dd0635f6a37ba9b540cfc2d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e9c1d3e2c8a8f38dc6557ebee6b6455c72fc52b080ecad005e06d73731f06057 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2020-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231380|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0a356efd873993c2 stable_project_id kproj_5468a835f5d11a9f source_key 202609|231380|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 서예산변전소 건설사업 project_name_detail 154kV 서예산S/S 건설사업 region_summary_raw 충청남도 예산군등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project purpose 내포신도시, 예산, 홍성지역 등 신규부하 공급 및 기설변전소(홍성, 응봉 계획확정 제07차 장기송변전설비계획 반영(2015.10) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2020.01 환경/재해 영향평가 환경영향평가: 2024.07 ~ 2025.01 재해영향평가: 2024.07 ~ 2025.04 주민의견 수렴 지자체 공고 열람: 2024.02 ~ 2024.03 설명회·공청회: 2024.02 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ '15.10 : 제7차 장기송변전설비계획 반영 □ '20.01 : 변전소 입지확정위원회 시행 □ '20.02~'24.02 : 변전소 및 송전선로 건설 관련 지자체 및 주민협의 □ '22.08 : 특별지원협의서 체결(신리마을) □ '22.11 : 특별지원협의서 체결(송산리마을) □ '23.10 : 특별지원협의서 체결(신평2리 4반마을) □ '23.12 : 특별지원협의서 체결(신평2리 본마을) □ '24.02 : 특별지원협의서 추가 체결(신리마을) □ '24.02~03 : 사업시행계획에 대한 지자체 공고 및 열람 □ '24.02 : 전력설비 건설사업 주민설명회 시행 □ '24.07 : 전원개발사업 실시계획 승인 신청 □ '25.08 : 전원개발사업 실시계획 승인 고시 □ '26.07 : 특별지원 합의서 체결(신리마을) 사업설계 설계용역: 기본설계: 2024.11 ~ 2025.03 실시설계: 설계담당자: [redacted] line 1. 추진경과 □ '22.08, '22.11 : 신리, 송산리마을 특별지원사업비 협의서 체결 □ '22.12, ‘23.01, ’23.03 신평2리마을 반대집회 개최(중부건설본부사옥) □ '23.10~ : 신평리 2리(4반마을) 특별지원사업비 협의서 체결 완료 □ '23.12~ : 신평리 2리(본마을) 특별지원사업비 협의서 체결 완료 □ '24.02 : 신리마을 특별지원사업비 추가지원 협의서 체결 □ '24.07 : 전원개발사업 실시계획 승인 신청 □ '24.12 : 기본설계 통합(변전, 토건) 심의위원회 시행 □ '25.02 : 소규모 환경영향평가 조치계획 제출 □ '25.03~04 : 군관리계획 시설 결정 협의(예산군청 도시계획팀) □ '25.05 : 농지전용협의 완료(예산군청 농정유통과) □ '25.06 : 실시계획 조치계획서 최종 제출 □ '25.08 : 실시계획 승인 고시(산업부) □ '25.09 : 용지매수 의뢰 □ '25.10 : 변전소 부지 인근 거주자 및 숙박시설 소유주 대민협의 □ '25.11 : 건설사업 민원대응 관련 관계자회의 시행 □ '25.12 : 변전소 부지 인근 거주자 민원 협의 □ '26.01 : 용지매수 관련 감정평가시행 □ '26.02~ : 용지 협의매수 □ '26.02 : 진입로 및 전력구 권원확보 관련 예산군 대관협의(1차) □ '26.03 : 진입로 및 전력구 권원확보 관련 예산군 대관협의(2차) □ '26.07 : 진입로 및 전력구 도로점용 허가 신청(→ 예산군청) 2. 향후계획 □ '26.09 : 전력구 및 진입로 권원확보 대관협의 시 future_plan_redacted line □ 향후계획 1. 추진경과 □ '22.08, '22.11 : 신리, 송산리마을 특별지원사업비 협의서 체결 □ '22.12, ‘23.01, ’23.03 신평2리마을 반대집회 개최(중부건설본부사옥) □ '23.10~ : 신평리 2리(4반마을) 특별지원사업비 협의서 체결 완료 □ '23.12~ : 신평리 2리(본마을) 특별지원사업비 협의서 체결 완료 □ '24.02 : 신리마을 특별지원사업비 추가지원 협의서 체결 □ '24.07 : 전원개발사업 실시계획 승인 신청 □ '24.12 : 기본설계 통합(변전, 토건) 심의위원회 시행 □ '25.02 : 소규모 환경영향평가 조치계획 제출 □ '25.03~04 : 군관리계획 시설 결정 협의(예산군청 도시계획팀) □ '25.05 : 농지전용협의 완료(예산군청 농정유통과) □ '25.06 : 실시계획 조치계획서 최종 제출 □ '25.08 : 실시계획 승인 고시(산업부) □ '25.09 : 용지매수 의뢰 □ '25.10 : 변전소 부지 인근 거주자 및 숙박시설 소유주 대민협의 □ '25.11 : 건설사업 민원대응 관련 관계자회의 시행 □ '25.12 : 변전소 부지 인근 거주자 민원 협의 □ '26.01 : 용지매수 관련 감정평가시행 □ '26.02~ : 용지 협의매수 □ '26.02 : 진입로 및 전력구 권원확보 관련 예산군 대관협의(1차) □ '26.03 : 진입로 및 전력구 권원확보 관련 예산군 대관협의(2차) □ '26.07 : 진입로 및 전력구 도로점용 허가 신청(→ 예산군청) 2. 향후계획 □ '26.09 : 전력구 및 진입로 권원확보 대관협의 시 attachment_count 0 source_detail_sha256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231380|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a356efd873993c2
Sources EV-ff7f5c5b6d46c917568434f4 Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66 행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_5468a835f5d11a9f stable_project_key prjtDef:231380:ESB project_definition 231380 first_region_code ESB manual_source_format false project_name 154kV 서예산S/S 건설사업 project_name_list 154kV 서예산변전소 건설사업 purpose 내포신도시, 예산, 홍성지역 등 신규부하 공급 및 기설변전소(홍성, 응봉 project_region_detail 충청남도 예산군 project_period_raw 2024.02~2028.10 project_scale_raw 45/60MVA X 2BANK responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_5468a835f5d11a9f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5468a835f5d11a9f
Sources EV-2dd0635f6a37ba9b540cfc2d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e9c1d3e2c8a8f38dc6557ebee6b6455c72fc52b080ecad005e06d73731f06057 Observations for this power asset History for this project