POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 21items · current page 1–21 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 서송도S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-33e2c55f330ed794d1aafc3e
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7cb8d480126b1ed6
stable_project_keyprjtDef:231371:ESB
project_definition231371
first_region_codeESB
manual_source_formatfalse
project_name154kV 서송도S/S 건설사업
project_name_list154kV 서송도S/S 건설사업
purpose송도국제도시 10공구 및 인천신항 부하공급
project_region_detail인천광역시 연수구
project_period_raw2023.02~2025.12
project_scale_raw60MVA X 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e8c5397ce26a7dda
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_7cb8d480126b1ed6

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7cb8d480126b1ed6

Sources EV-33e2c55f330ed794d1aafc3e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7c8922ea1ddff52a427abe8a86590332dd3bb0191ca0a09844a3627af6955b45
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2022-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2016-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2016-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source snapshots by date · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e8c5397ce26a7dda
stable_project_idkproj_7cb8d480126b1ed6
source_key202609|231371|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 서송도S/S 건설사업
project_name_detail154kV 서송도S/S 건설사업
region_summary_raw인천광역시 연수구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 송도국제도시 10공구 및 인천신항 부하공급
Project region
  • 인천광역시 연수구
Project period
  • 2023.02~2025.12
사업 규모
  • 60MVA X 2BANK
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
  • 제05차 장기송변전설비계획 반영()
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2016.10 참여 위원 수 : 15 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
  • 2022.05
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2023.02 공사 기간: 2023.02 ~ 2027.06 감독자: [redacted], 실적): 100, 89
1. 진행경과 - '24.07월 : 지상2층 Base channel 설치 - '24.12월 : 전력구 관련 준공 목표 변경 필요[(당초)25.06월 → (변경)26.12월] - '25.06월 : 토건공사 준공 - '25.12월 : 변전기기 설치완료 및 준공시험 2. 향후계획 - '26.01월 : 서송도S/S 건설사업 감리용역 및 관련 공사 중지 - '27.05월 : 서송도S/S 건설사업 감리용역 및 관련 공사 재개 - '27.06월 : 변전소 초기가압 및 준공
future_plan_redacted□ 향후계획 1. 진행경과 - '24.07월 : 지상2층 Base channel 설치 - '24.12월 : 전력구 관련 준공 목표 변경 필요[(당초)25.06월 → (변경)26.12월] - '25.06월 : 토건공사 준공 - '25.12월 : 변전기기 설치완료 및 준공시험 2. 향후계획 - '26.01월 : 서송도S/S 건설사업 감리용역 및 관련 공사 중지 - '27.05월 : 서송도S/S 건설사업 감리용역 및 관련 공사 재개 - '27.06월 : 변전소 초기가압 및 준공
attachment_count0
source_detail_sha256849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231371|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source snapshots by date · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7cb8d480126b1ed6
stable_project_keyprjtDef:231371:ESB
project_definition231371
first_region_codeESB
manual_source_formatfalse
project_name154kV 서송도S/S 건설사업
project_name_list154kV 서송도S/S 건설사업
purpose송도국제도시 10공구 및 인천신항 부하공급
project_region_detail인천광역시 연수구
project_period_raw2023.02~2025.12
project_scale_raw60MVA X 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e8c5397ce26a7dda
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_7cb8d480126b1ed6

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7cb8d480126b1ed6

Sources EV-33e2c55f330ed794d1aafc3e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7c8922ea1ddff52a427abe8a86590332dd3bb0191ca0a09844a3627af6955b45

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel