Power assets and projects · KOR · kepco_planned

154kV 서영광(영광#2)S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-3665ba6c13d24bafebe13dc2
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_aadc4d55cbabe1cb
stable_project_keyprjtDef:231470:ESB
project_definition231470
first_region_codeESB
manual_source_formatfalse
project_name154kV 서영광(영광#2)S/S 건설사업
project_name_list154kV 서영광(영광#2)S/S 건설사업
purpose영광지역 내 분산형전원 연계용량 확보
project_region_detail전남광주통합특별시 영광군
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR 2BANK(최종4BANK,SH.R 1BANK)
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bab5e32ff3e61f34
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_aadc4d55cbabe1cb

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_aadc4d55cbabe1cb

Sources EV-3665ba6c13d24bafebe13dc2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 eab9c8bc899b495d87a555a900493938d442344ef6a25d445ba9db29f4e65249
Source schedule candidates · KOR · kepco_planned

154kV 서영광(영광#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231470|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bab5e32ff3e61f34

Sources EV-34e3e719e329adfbd5d6a73d
Evidence SHA-256 1c0db0254a43d7a84328c1406787a8c19462c8f55c964dee20586401ecfaede3
행 SHA-256 eb77be1fae24f9e5bdc20ecb81b8357aa1e9a086c90b953022ea9e3684523167
Source schedule candidates · KOR · kepco_planned

154kV 서영광(영광#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231470|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bab5e32ff3e61f34

Sources EV-34e3e719e329adfbd5d6a73d
Evidence SHA-256 1c0db0254a43d7a84328c1406787a8c19462c8f55c964dee20586401ecfaede3
행 SHA-256 eb77be1fae24f9e5bdc20ecb81b8357aa1e9a086c90b953022ea9e3684523167
Source snapshots by date · KOR · kepco_planned

154kV 서영광(영광#2)S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_bab5e32ff3e61f34
stable_project_idkproj_aadc4d55cbabe1cb
source_key202609|231470|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 서영광(영광#2)S/S 건설사업
project_name_detail154kV 서영광(영광#2)S/S 건설사업
region_summary_raw전남광주통합특별시 영광군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 영광지역 내 분산형전원 연계용량 확보
Project region
  • 전남광주통합특별시 영광군
Project period
  • 2018.06~2026.10
사업 규모
  • 154KV M.TR 2BANK(최종4BANK,SH.R 1BANK)
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2020.05 입지선정위원회 구성시기: 2020.08 참여 위원 수 : 15 지장유무 조회: 2021.02~2021.05 경과지(부지) 확정: 2021.05
환경/재해 영향평가
  • 환경영향평가: 2021.10 ~ 2022.10 재해영향평가: 2021.10 ~ 2022.10
주민의견 수렴
  • 지자체 공고 열람: 2022.03 ~ 2022.04 설명회·공청회: 2022.04 자체설명회: 2020.07 ~ 2021.03
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2023.08 ~ 2023.11 실시설계: 2024.12 ~ 2025.05 설계담당자: [redacted]
[계획확정~사업승인전 추진실적] ○'21.05 : 입지확정위원회 시행 및 부지확정 ○'21.10 : 사업시행계획서 제출(→산업통상자원부) ○'22.06 : 전원개발사업 실시계획 승인 신청(→산업통상자원부) [사업승인~공사착수전 추진실적] ○'23.05 : 전원개발 실시계획 승인 및 고시 ○'23.09 : 변전 기본설계 시행 ○'24.10 : 주자재 발주 착수 [공사착수] ○'26.03 : 변전소 건설공사(일반) 착공 [향후계획] ○'26.10 : 변전소 기기가압 및 준공
future_plan_redacted□ 향후계획 [계획확정~사업승인전 추진실적] ○'21.05 : 입지확정위원회 시행 및 부지확정 ○'21.10 : 사업시행계획서 제출(→산업통상자원부) ○'22.06 : 전원개발사업 실시계획 승인 신청(→산업통상자원부) [사업승인~공사착수전 추진실적] ○'23.05 : 전원개발 실시계획 승인 및 고시 ○'23.09 : 변전 기본설계 시행 ○'24.10 : 주자재 발주 착수 [공사착수] ○'26.03 : 변전소 건설공사(일반) 착공 [향후계획] ○'26.10 : 변전소 기기가압 및 준공
attachment_count0
source_detail_sha2561c0db0254a43d7a84328c1406787a8c19462c8f55c964dee20586401ecfaede3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231470|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bab5e32ff3e61f34

Sources EV-34e3e719e329adfbd5d6a73d
Evidence SHA-256 1c0db0254a43d7a84328c1406787a8c19462c8f55c964dee20586401ecfaede3
행 SHA-256 eb77be1fae24f9e5bdc20ecb81b8357aa1e9a086c90b953022ea9e3684523167
Source snapshots by date · KOR · kepco_planned

154kV 서영광(영광#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_aadc4d55cbabe1cb
stable_project_keyprjtDef:231470:ESB
project_definition231470
first_region_codeESB
manual_source_formatfalse
project_name154kV 서영광(영광#2)S/S 건설사업
project_name_list154kV 서영광(영광#2)S/S 건설사업
purpose영광지역 내 분산형전원 연계용량 확보
project_region_detail전남광주통합특별시 영광군
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR 2BANK(최종4BANK,SH.R 1BANK)
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bab5e32ff3e61f34
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_aadc4d55cbabe1cb

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_aadc4d55cbabe1cb

Sources EV-3665ba6c13d24bafebe13dc2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 eab9c8bc899b495d87a555a900493938d442344ef6a25d445ba9db29f4e65249

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel