POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 7items · current page 1–7 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4f12db1e272ee511c2399cb2
Detailed source fields Original source field Published value or condition stable_project_id kproj_dc269645733bcbbb stable_project_key prjtDef:233579:ESB project_definition 233579 first_region_code ESB manual_source_format false project_name 154kV 서산-성연 지중T/L 건설사업 project_name_list 154kV 서산-성연 지중T/L 건설사업 purpose 충남 서산지역 공급능력 확충 및 계통보강 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2018.06~2026.10 project_scale_raw 154KV XLPE 2,000, 2C-2.6KM responsible_office_raw 중부건설본부/직할 equipment_type 지중송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_dc269645733bcbbb
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_dc269645733bcbbb
Sources EV-4f12db1e272ee511c2399cb2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d888bd79e53f1c561f13e968390de8981626d99eb852bf62321cbd4b6e223e8d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_af0f921ba20f1e3c
Sources EV-fcf6ef088aa193cf598f8fa7 Evidence SHA-256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f 행 SHA-256 094076a81dcd425d2390e38434fa35c64bbb02aca970da6bf00b44708286a224 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_af0f921ba20f1e3c
Sources EV-fcf6ef088aa193cf598f8fa7 Evidence SHA-256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f 행 SHA-256 094076a81dcd425d2390e38434fa35c64bbb02aca970da6bf00b44708286a224 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_af0f921ba20f1e3c
Sources EV-fcf6ef088aa193cf598f8fa7 Evidence SHA-256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f 행 SHA-256 094076a81dcd425d2390e38434fa35c64bbb02aca970da6bf00b44708286a224 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_af0f921ba20f1e3c
Sources EV-fcf6ef088aa193cf598f8fa7 Evidence SHA-256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f 행 SHA-256 094076a81dcd425d2390e38434fa35c64bbb02aca970da6bf00b44708286a224 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_af0f921ba20f1e3c stable_project_id kproj_dc269645733bcbbb source_key 202609|233579|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 서산-성연 지중T/L 건설사업 project_name_detail 154kV 서산-성연 지중T/L 건설사업 region_summary_raw 충청남도 서산시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Seosan City, South Chungcheong Province 사업 규모 154KV XLPE 2,000, 2C-2.6KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: -18.06 : 제8차 장기송변전설비계획 신규사업 반영 -25.06 : 착수시점 도래시 기본설계 등 사업착수 예정 future_plan_redacted □ 향후계획 -18.06 : 제8차 장기송변전설비계획 신규사업 반영 -25.06 : 착수시점 도래시 기본설계 등 사업착수 예정 attachment_count 0 source_detail_sha256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233579|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_af0f921ba20f1e3c
Sources EV-fcf6ef088aa193cf598f8fa7 Evidence SHA-256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f 행 SHA-256 094076a81dcd425d2390e38434fa35c64bbb02aca970da6bf00b44708286a224 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_dc269645733bcbbb stable_project_key prjtDef:233579:ESB project_definition 233579 first_region_code ESB manual_source_format false project_name 154kV 서산-성연 지중T/L 건설사업 project_name_list 154kV 서산-성연 지중T/L 건설사업 purpose 충남 서산지역 공급능력 확충 및 계통보강 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2018.06~2026.10 project_scale_raw 154KV XLPE 2,000, 2C-2.6KM responsible_office_raw 중부건설본부/직할 equipment_type 지중송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_dc269645733bcbbb
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_dc269645733bcbbb
Sources EV-4f12db1e272ee511c2399cb2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d888bd79e53f1c561f13e968390de8981626d99eb852bf62321cbd4b6e223e8d Observations for this power asset History for this project