Power assets and projects · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-38d84fe610c23d563985c534
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9430d7e862d294f4
stable_project_keyprjtDef:233625:ESB
project_definition233625
first_region_codeESB
manual_source_formatfalse
project_name154kV 새만금-동비응 지중T/L 건설사업
project_name_list154kV 새만금-동비응 지중송전선로 건설사업
purpose새만금 산업단지 신규부하공급 및 계통보강
project_region_detail전북특별자치도 군산시
project_period_raw2023.06~2027.10
project_scale_rawXLPE2,000㎟(D)/2,500㎟(S), 2C×6.0KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a34599579c42f064
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_9430d7e862d294f4

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9430d7e862d294f4

Sources EV-38d84fe610c23d563985c534
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1eb3314e2f135965aa1daeb200a34fdfd570f0a9970b72e877427e70d0267948
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2017-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2023-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2015-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source schedule candidates · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233625|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source snapshots by date · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a34599579c42f064
stable_project_idkproj_9430d7e862d294f4
source_key202609|233625|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 새만금-동비응 지중송전선로 건설사업
project_name_detail154kV 새만금-동비응 지중T/L 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 새만금 산업단지 신규부하공급 및 계통보강
Project region
  • 전북특별자치도 군산시
Project period
  • 2023.06~2027.10
사업 규모
  • XLPE2,000㎟(D)/2,500㎟(S), 2C×6.0KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 2024.11 ~ 2025.10 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2026.02 공사 기간: 2026.02 ~ 2027.03 감독자: [redacted], 실적): 92, 73
[진행경과] □ '15.10 제7차 장기송변전 설비계획 반영 □ '17.10 새만금 간척사업 매립 지연으로 준공목표 조정 □ '23.02 설비계획 적정성 검토에 따른 계통계획 변경(새만금-비응#3 → 새만금-비응#2) □ '24.10 지중공사 기본설계 완료 □ '25.04 주자재(케이블 및 접속재 등) 발주 □ '26.02 지중공사 착공 [향후계획] □ '26.10 선로가압
future_plan_redacted□ 향후계획 [진행경과] □ '15.10 제7차 장기송변전 설비계획 반영 □ '17.10 새만금 간척사업 매립 지연으로 준공목표 조정 □ '23.02 설비계획 적정성 검토에 따른 계통계획 변경(새만금-비응#3 → 새만금-비응#2) □ '24.10 지중공사 기본설계 완료 □ '25.04 주자재(케이블 및 접속재 등) 발주 □ '26.02 지중공사 착공 [향후계획] □ '26.10 선로가압
attachment_count0
source_detail_sha256b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233625|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a34599579c42f064

Sources EV-db8b8a87621e79bf7c19e584
Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac
행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871
Source snapshots by date · KOR · kepco_planned

154kV 새만금-동비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9430d7e862d294f4
stable_project_keyprjtDef:233625:ESB
project_definition233625
first_region_codeESB
manual_source_formatfalse
project_name154kV 새만금-동비응 지중T/L 건설사업
project_name_list154kV 새만금-동비응 지중송전선로 건설사업
purpose새만금 산업단지 신규부하공급 및 계통보강
project_region_detail전북특별자치도 군산시
project_period_raw2023.06~2027.10
project_scale_rawXLPE2,000㎟(D)/2,500㎟(S), 2C×6.0KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a34599579c42f064
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_9430d7e862d294f4

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9430d7e862d294f4

Sources EV-38d84fe610c23d563985c534
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1eb3314e2f135965aa1daeb200a34fdfd570f0a9970b72e877427e70d0267948

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel