POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 서보은(수한)S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-aa3514b19cd95c5b9a2eb923
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2bac602f91a9c6ac
stable_project_keyprjtDef:231661:ESB
project_definition231661
first_region_codeESB
manual_source_formatfalse
project_name154kV 서보은(수한)S/S 건설사업
project_name_list154kV 서보은(수한)변전소 건설사업
purpose보은지역 재생E 연계
project_region_detail충청북도 보은군
project_period_raw2024.06~2030.12
project_scale_raw154/23KV 60MVA * 2BANK
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type변전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0b44ccd7ef13276a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_2bac602f91a9c6ac

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2bac602f91a9c6ac

Sources EV-aa3514b19cd95c5b9a2eb923
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 032621102d10d55222805fdf6f880dbeb91045dddcedc233a351bf44c15aa5d0
Source schedule candidates · KOR · kepco_planned

154kV 서보은(수한)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231661|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0b44ccd7ef13276a

Sources EV-86d17b4a1ec356cc97c4b379
Evidence SHA-256 83a513898f1fbcafb0d45138b8c49952f16238607795557a42164ddc7a8811c8
행 SHA-256 6d1ccfbed25c06b1cd7440dbd94bc31ecff8402c4717f9a5a95e53729e4e5005
Source schedule candidates · KOR · kepco_planned

154kV 서보은(수한)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231661|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0b44ccd7ef13276a

Sources EV-86d17b4a1ec356cc97c4b379
Evidence SHA-256 83a513898f1fbcafb0d45138b8c49952f16238607795557a42164ddc7a8811c8
행 SHA-256 6d1ccfbed25c06b1cd7440dbd94bc31ecff8402c4717f9a5a95e53729e4e5005
Source snapshots by date · KOR · kepco_planned

154kV 서보은(수한)S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_0b44ccd7ef13276a
stable_project_idkproj_2bac602f91a9c6ac
source_key202609|231661|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 서보은(수한)변전소 건설사업
project_name_detail154kV 서보은(수한)S/S 건설사업
region_summary_raw충청북도 보은군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw충북강원건설지사
section_fields
Project purpose
  • 보은지역 재생E 연계
Project region
  • 충청북도 보은군
Project period
  • 2024.06~2030.12
사업 규모
  • 154/23KV 60MVA * 2BANK
담당 사업소
  • 중부건설본부/충북강원건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2024.10 입지선정위원회 구성시기: 2025.04 참여 위원 수 : 13 경과지(부지) 확정: 2025.12
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • [진행경과] □ '23.05. : 제10차 장기 송변전설비계획 신규사업 반영 □ '24.10. : 전력영향평가 용역 착수 □ '24.12. : 지자체(보은군 및 4개읍면) 대상 사업설명 시행 □ '25.01. : 이장협의회 대상 사업설명 시행 □ '25.03. : 입지선정위원회 구성(주민대표 8, 전문가2, 지자체 1, 한전2) □ '25.04. : 입지선정위원회 1차 회의 시행 - 내용 : 위원장 선출, 운영규범 확정, 건설사업 개요 및 입지선정위원회 설명 등 □ '25.06. : 입지선정위원회 2차 회의 시행 - 내용 : 사업대상지역 개황조사 결과보고, 입지선정 기준 안내, 변전소 후보지역 선호도 설문 시행 등 □ '25.08. : 입지선정위원회 3차 회의 시행(입지선정위원 추가, 예비후보지답사, 후보지역도출 등) - 내용 : 입지선정위원 추가(주민대표 2명), 예비후보지답사, 후보지역도출 등 □ '25.11. : 입지선정위원회 4차 회의 시행 - 내용 : 지장유무조회, 간이환경성 분석 및 경관영향 검토 결과보고 등 □ '25.12. : 입지선정위원회 5차 회의 시행 - 내용 : 대안평가 결과보고, 변전소(송전선로) 최적부지 심의 및 의결, 입지선정위원회 폐회 등 □ '26.01 : 입지확정위원회 구성 및 심의 시행 중 □ '26.02 : 입지확정위원회 심의결과 보고 □ '26.03 : 입지확정 변경위원회 구성 및 심의 진행중 □ '26.03 : 입지확정 변경위원회 심의 결과 보고 □ '26.04 : 변전소 부지확정 □ '26.05 ~ '26.09 : 전원개발사업 사업시행계획서 작성
[향후계획] □‘26.10 : 사업시행계획 공람 공고 및 주민 설명회 시행 □‘28.01 : 용지매수 완료 □‘28.11 : 변전설계 완료 □‘29.04 : 변전공사 착공 □‘30.12 : 변전소 운전
future_plan_redacted□ 향후계획 [향후계획] □‘26.10 : 사업시행계획 공람 공고 및 주민 설명회 시행 □‘28.01 : 용지매수 완료 □‘28.11 : 변전설계 완료 □‘29.04 : 변전공사 착공 □‘30.12 : 변전소 운전
attachment_count0
source_detail_sha25683a513898f1fbcafb0d45138b8c49952f16238607795557a42164ddc7a8811c8
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231661|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0b44ccd7ef13276a

Sources EV-86d17b4a1ec356cc97c4b379
Evidence SHA-256 83a513898f1fbcafb0d45138b8c49952f16238607795557a42164ddc7a8811c8
행 SHA-256 6d1ccfbed25c06b1cd7440dbd94bc31ecff8402c4717f9a5a95e53729e4e5005
Source snapshots by date · KOR · kepco_planned

154kV 서보은(수한)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2bac602f91a9c6ac
stable_project_keyprjtDef:231661:ESB
project_definition231661
first_region_codeESB
manual_source_formatfalse
project_name154kV 서보은(수한)S/S 건설사업
project_name_list154kV 서보은(수한)변전소 건설사업
purpose보은지역 재생E 연계
project_region_detail충청북도 보은군
project_period_raw2024.06~2030.12
project_scale_raw154/23KV 60MVA * 2BANK
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type변전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0b44ccd7ef13276a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_2bac602f91a9c6ac

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2bac602f91a9c6ac

Sources EV-aa3514b19cd95c5b9a2eb923
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 032621102d10d55222805fdf6f880dbeb91045dddcedc233a351bf44c15aa5d0

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel