POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 새만금#2-농생#1 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-488d7289ae7c049b94179d51
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1894da8d7bf1cf51
stable_project_keyprjtDef:234510:ESB
project_definition234510
first_region_codeESB
manual_source_formatfalse
project_name154kV 새만금#2-농생#1 전력구 건설사업
project_name_list154kV 새만금#2-농생#1 전력구 건설사업
purpose계통보강
project_region_detail전북특별자치도 군산시
project_period_raw
project_scale_rawL=0.11KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_0a83f41513788887
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_1894da8d7bf1cf51

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1894da8d7bf1cf51

Sources EV-488d7289ae7c049b94179d51
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 ab3f28d49aa7522e8d7e7eb15d224562a06ae6be15df6eb60cabd8c2aa01dec6
Source snapshots by date · KOR · kepco_planned

154kV 새만금#2-농생#1 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_0a83f41513788887
stable_project_idkproj_1894da8d7bf1cf51
source_key202609|234510|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 새만금#2-농생#1 전력구 건설사업
project_name_detail154kV 새만금#2-농생#1 전력구 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 계통보강
Project region
  • 전북특별자치도 군산시
Project period
사업 규모
  • L=0.11KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha256fafcc00eab2915054327400d7711e92c7a7a7d4c06a2efa6bb2a3eb61820c2fb
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234510|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a83f41513788887

Sources EV-fa48f93f37f0de2cc805b9b6
Evidence SHA-256 fafcc00eab2915054327400d7711e92c7a7a7d4c06a2efa6bb2a3eb61820c2fb
행 SHA-256 ba4988b91edde8ef0082ddf65afd669db67f127e9fd2c03d96e74146d1b95d72
Source snapshots by date · KOR · kepco_planned

154kV 새만금#2-농생#1 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1894da8d7bf1cf51
stable_project_keyprjtDef:234510:ESB
project_definition234510
first_region_codeESB
manual_source_formatfalse
project_name154kV 새만금#2-농생#1 전력구 건설사업
project_name_list154kV 새만금#2-농생#1 전력구 건설사업
purpose계통보강
project_region_detail전북특별자치도 군산시
project_period_raw
project_scale_rawL=0.11KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_0a83f41513788887
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_1894da8d7bf1cf51

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1894da8d7bf1cf51

Sources EV-488d7289ae7c049b94179d51
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 ab3f28d49aa7522e8d7e7eb15d224562a06ae6be15df6eb60cabd8c2aa01dec6

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel