Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 새만금#2-농생#1 전력구 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-488d7289ae7c049b94179d51
Sources EV-488d7289ae7c049b94179d51 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ab3f28d49aa7522e8d7e7eb15d224562a06ae6be15df6eb60cabd8c2aa01dec6Source snapshots by date · KOR · kepco_planned
154kV 새만금#2-농생#1 전력구 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_0a83f41513788887
stable_project_id
kproj_1894da8d7bf1cf51
source_key
202609|234510|ESB
basic_ym
202609
source_stage_raw
project_name_list
154kV 새만금#2-농생#1 전력구 건설사업
project_name_detail
154kV 새만금#2-농생#1 전력구 건설사업
region_summary_raw
전북특별자치도 군산시등 1 지역
equipment_type_raw
전력구
headquarters_raw
중부건설본부
office_raw
전북건설지사
section_fields
Project purpose
계통보강
Project region
전북특별자치도 군산시
Project period
사업 규모
L=0.11KM
담당 사업소
중부건설본부/전북건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-fa48f93f37f0de2cc805b9b6 Evidence SHA-256 fafcc00eab2915054327400d7711e92c7a7a7d4c06a2efa6bb2a3eb61820c2fb 행 SHA-256 ba4988b91edde8ef0082ddf65afd669db67f127e9fd2c03d96e74146d1b95d72Source snapshots by date · KOR · kepco_planned