Power assets and projects · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-fd31a6fd9ef26a0ffd25a620
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1fca706f83031ebe
stable_project_keyprjtDef:232569:ESB
project_definition232569
first_region_codeESB
manual_source_formatfalse
project_name154kV 상운분기T/L 건설사업
project_name_list154kV 상운분기 송전선로 건설사업
purpose봉화지역 재생E 연계 선제적 용량 확보
project_region_detail경상북도 봉화군
project_period_raw2023.02~2028.06
project_scale_rawP240,4C,0.635KM
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_67423d33c5558959
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_1fca706f83031ebe

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1fca706f83031ebe

Sources EV-fd31a6fd9ef26a0ffd25a620
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 421edf707be9432cfa142c0c03032ecff74db0fa5146a9377467e8f6d9422440
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source schedule candidates · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232569|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source snapshots by date · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_67423d33c5558959
stable_project_idkproj_1fca706f83031ebe
source_key202609|232569|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 상운분기 송전선로 건설사업
project_name_detail154kV 상운분기T/L 건설사업
region_summary_raw경상북도 봉화군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 봉화지역 재생E 연계 선제적 용량 확보
Project region
  • 경상북도 봉화군
Project period
  • 2023.02~2028.06
사업 규모
  • P240,4C,0.635KM
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
  • 제09차 장기송변전설비계획 반영(2021.09)
입지선정
  • 전력입지영향평가 용역 착수: 2022.09 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2022.12~2023.01 경과지(부지) 확정: 2023.01
환경/재해 영향평가
  • 환경영향평가: 2023.04 ~ 2024.03 재해영향평가: 2023.04 ~ 2024.03
주민의견 수렴
  • 지자체 공고 열람: 2023.02 ~ 2023.02 설명회·공청회: 2023.02 자체설명회: 2022.02 ~
입지선정 및 주민의견 수렴 주요 내용
  • line □ `23.01 : 송전선로 입지확정위원회 시
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2024.04 ~ 2024.04 실시설계: 2025.08 ~ 2026.01 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2026.04 공사 기간: 감독자: [redacted], 실적): 59, 31
□ ‘27.06 : 선로가압 및 준공
future_plan_redacted□ 향후계획 □ ‘27.06 : 선로가압 및 준공
attachment_count0
source_detail_sha2561f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232569|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_67423d33c5558959

Sources EV-e934175c9db704ac1c410410
Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f
행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94
Source snapshots by date · KOR · kepco_planned

154kV 상운분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1fca706f83031ebe
stable_project_keyprjtDef:232569:ESB
project_definition232569
first_region_codeESB
manual_source_formatfalse
project_name154kV 상운분기T/L 건설사업
project_name_list154kV 상운분기 송전선로 건설사업
purpose봉화지역 재생E 연계 선제적 용량 확보
project_region_detail경상북도 봉화군
project_period_raw2023.02~2028.06
project_scale_rawP240,4C,0.635KM
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_67423d33c5558959
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_1fca706f83031ebe

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1fca706f83031ebe

Sources EV-fd31a6fd9ef26a0ffd25a620
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 421edf707be9432cfa142c0c03032ecff74db0fa5146a9377467e8f6d9422440

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel