Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 새만금#2-농생#1 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-10f65e36ff788d397c7d340a
Sources EV-10f65e36ff788d397c7d340a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f18f373fe6ed895946b7e08a1f7a302ea7ebc266605ccabaf728de5bf096538cSource snapshots by date · KOR · kepco_planned
154kV 새만금#2-농생#1 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_e60e2262b9ff72b2
stable_project_id
kproj_b61224305c248fc2
source_key
202609|232707|ESB
basic_ym
202609
source_stage_raw
project_name_list
154kV 새만금#2-농생#1 송전선로 건설사업
project_name_detail
154kV 새만금#2-농생#1 건설사업
region_summary_raw
전북특별자치도 군산시등 1 지역
equipment_type_raw
가공송전
headquarters_raw
중부건설본부
office_raw
전북건설지사
section_fields
Project purpose
군산시 및 산단 안정적인 전력공급
Project region
전북특별자치도 군산시
Project period
사업 규모
ACSR 410㎟×2B×2C×3KM
담당 사업소
중부건설본부/전북건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-ef5bdb771b87c3af50ad8eb3 Evidence SHA-256 3902237fa539c3e9470fdd2f2b4b1df37f2dd25236e5da81bd27b24de025bb0f 행 SHA-256 8a31e6e91692f010e421affa8d53be63ac353b7fd4da563d5195fed5e8731c50Source snapshots by date · KOR · kepco_planned