Power assets and projects · KOR · kepco_planned

154kV 새만금#2-농생#1 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-10f65e36ff788d397c7d340a
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_b61224305c248fc2
stable_project_keyprjtDef:232707:ESB
project_definition232707
first_region_codeESB
manual_source_formatfalse
project_name154kV 새만금#2-농생#1 건설사업
project_name_list154kV 새만금#2-농생#1 송전선로 건설사업
purpose군산시 및 산단 안정적인 전력공급
project_region_detail전북특별자치도 군산시
project_period_raw
project_scale_rawACSR 410㎟×2B×2C×3KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_e60e2262b9ff72b2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_b61224305c248fc2

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_b61224305c248fc2

Sources EV-10f65e36ff788d397c7d340a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f18f373fe6ed895946b7e08a1f7a302ea7ebc266605ccabaf728de5bf096538c
Source snapshots by date · KOR · kepco_planned

154kV 새만금#2-농생#1 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e60e2262b9ff72b2
stable_project_idkproj_b61224305c248fc2
source_key202609|232707|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 새만금#2-농생#1 송전선로 건설사업
project_name_detail154kV 새만금#2-농생#1 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 군산시 및 산단 안정적인 전력공급
Project region
  • 전북특별자치도 군산시
Project period
사업 규모
  • ACSR 410㎟×2B×2C×3KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha2563902237fa539c3e9470fdd2f2b4b1df37f2dd25236e5da81bd27b24de025bb0f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232707|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e60e2262b9ff72b2

Sources EV-ef5bdb771b87c3af50ad8eb3
Evidence SHA-256 3902237fa539c3e9470fdd2f2b4b1df37f2dd25236e5da81bd27b24de025bb0f
행 SHA-256 8a31e6e91692f010e421affa8d53be63ac353b7fd4da563d5195fed5e8731c50
Source snapshots by date · KOR · kepco_planned

154kV 새만금#2-농생#1 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_b61224305c248fc2
stable_project_keyprjtDef:232707:ESB
project_definition232707
first_region_codeESB
manual_source_formatfalse
project_name154kV 새만금#2-농생#1 건설사업
project_name_list154kV 새만금#2-농생#1 송전선로 건설사업
purpose군산시 및 산단 안정적인 전력공급
project_region_detail전북특별자치도 군산시
project_period_raw
project_scale_rawACSR 410㎟×2B×2C×3KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_e60e2262b9ff72b2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_b61224305c248fc2

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_b61224305c248fc2

Sources EV-10f65e36ff788d397c7d340a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f18f373fe6ed895946b7e08a1f7a302ea7ebc266605ccabaf728de5bf096538c

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel