POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 25items · current page 1–25 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 상운S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-581344484a51338356f2b5a7
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_12087962bfde63e3
stable_project_keyprjtDef:231522:ESB
project_definition231522
first_region_codeESB
manual_source_formatfalse
project_name154kV 상운S/S 건설사업
project_name_list154kV 상운S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail경상북도 봉화군
project_period_raw2021.11~2027.06
project_scale_raw60MVA X 2BANK(최종 4BANK)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c16fcc89f02fdcd2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_12087962bfde63e3

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_12087962bfde63e3

Sources EV-581344484a51338356f2b5a7
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 548a814b387b410c8135a617516c0362f4be966c2c126e0001fdc66a9322ee30
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2021-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2023-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source schedule candidates · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-11
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231522|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source snapshots by date · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_c16fcc89f02fdcd2
stable_project_idkproj_12087962bfde63e3
source_key202609|231522|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 상운S/S 건설사업
project_name_detail154kV 상운S/S 건설사업
region_summary_raw경상북도 봉화군등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 경상북도 봉화군
Project period
  • 2021.11~2027.06
사업 규모
  • 60MVA X 2BANK(최종 4BANK)
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2022.01~2022.02 경과지(부지) 확정: 2022.07
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 2022.02 ~ 2022.02 설명회·공청회: 2023.02 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
1. 주요 추진경과 □ '21.09 : 제9차 장기송변전설비계획 반영(준공목표 : ’27.06) □ '21.11 : 선제적 전력설비 입지선정 TF 결과 후보지 선정 □ '22.02 : 지장유무 조회결과에 따른 후보지 변경 □ '22.06 : 입지선정실무위원회 시행 □ '22.07 : 입지확정위원회 시행 □ '23.02 : 사업시행계획서 공고열람 시행 및 주민설명회 시행 □ '23.03 : 전원개발사업 실시계획 승인신청 □ '24.07 : 전원개발사업 실시계획 승인고시(산자부 고시 제2024-118호) □ '24.08 : 용지매수 의뢰 □ '25.04 : 기본설계 완료 2. 향후계획 □ '26.03 : 공사착공 □ '27.06 : 가압 및 준공
future_plan_redacted□ 향후계획 1. 주요 추진경과 □ '21.09 : 제9차 장기송변전설비계획 반영(준공목표 : ’27.06) □ '21.11 : 선제적 전력설비 입지선정 TF 결과 후보지 선정 □ '22.02 : 지장유무 조회결과에 따른 후보지 변경 □ '22.06 : 입지선정실무위원회 시행 □ '22.07 : 입지확정위원회 시행 □ '23.02 : 사업시행계획서 공고열람 시행 및 주민설명회 시행 □ '23.03 : 전원개발사업 실시계획 승인신청 □ '24.07 : 전원개발사업 실시계획 승인고시(산자부 고시 제2024-118호) □ '24.08 : 용지매수 의뢰 □ '25.04 : 기본설계 완료 2. 향후계획 □ '26.03 : 공사착공 □ '27.06 : 가압 및 준공
attachment_count0
source_detail_sha2560db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231522|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c16fcc89f02fdcd2

Sources EV-7f280d1b8743e59011840600
Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1
행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0
Source snapshots by date · KOR · kepco_planned

154kV 상운S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_12087962bfde63e3
stable_project_keyprjtDef:231522:ESB
project_definition231522
first_region_codeESB
manual_source_formatfalse
project_name154kV 상운S/S 건설사업
project_name_list154kV 상운S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail경상북도 봉화군
project_period_raw2021.11~2027.06
project_scale_raw60MVA X 2BANK(최종 4BANK)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c16fcc89f02fdcd2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_12087962bfde63e3

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_12087962bfde63e3

Sources EV-581344484a51338356f2b5a7
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 548a814b387b410c8135a617516c0362f4be966c2c126e0001fdc66a9322ee30

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel