POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 25items · current page 1–25 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-581344484a51338356f2b5a7
Detailed source fields Original source field Published value or condition stable_project_id kproj_12087962bfde63e3 stable_project_key prjtDef:231522:ESB project_definition 231522 first_region_code ESB manual_source_format false project_name 154kV 상운S/S 건설사업 project_name_list 154kV 상운S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경상북도 봉화군 project_period_raw 2021.11~2027.06 project_scale_raw 60MVA X 2BANK(최종 4BANK) responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_12087962bfde63e3
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_12087962bfde63e3
Sources EV-581344484a51338356f2b5a7 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 548a814b387b410c8135a617516c0362f4be966c2c126e0001fdc66a9322ee30 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2022-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2023-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2022-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-11 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_c16fcc89f02fdcd2 stable_project_id kproj_12087962bfde63e3 source_key 202609|231522|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 상운S/S 건설사업 project_name_detail 154kV 상운S/S 건설사업 region_summary_raw 경상북도 봉화군등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2022.01~2022.02 경과지(부지) 확정: 2022.07 주민의견 수렴 지자체 공고 열람: 2022.02 ~ 2022.02 설명회·공청회: 2023.02 자체설명회: 1. 주요 추진경과 □ '21.09 : 제9차 장기송변전설비계획 반영(준공목표 : ’27.06) □ '21.11 : 선제적 전력설비 입지선정 TF 결과 후보지 선정 □ '22.02 : 지장유무 조회결과에 따른 후보지 변경 □ '22.06 : 입지선정실무위원회 시행 □ '22.07 : 입지확정위원회 시행 □ '23.02 : 사업시행계획서 공고열람 시행 및 주민설명회 시행 □ '23.03 : 전원개발사업 실시계획 승인신청 □ '24.07 : 전원개발사업 실시계획 승인고시(산자부 고시 제2024-118호) □ '24.08 : 용지매수 의뢰 □ '25.04 : 기본설계 완료 2. 향후계획 □ '26.03 : 공사착공 □ '27.06 : 가압 및 준공 future_plan_redacted □ 향후계획 1. 주요 추진경과 □ '21.09 : 제9차 장기송변전설비계획 반영(준공목표 : ’27.06) □ '21.11 : 선제적 전력설비 입지선정 TF 결과 후보지 선정 □ '22.02 : 지장유무 조회결과에 따른 후보지 변경 □ '22.06 : 입지선정실무위원회 시행 □ '22.07 : 입지확정위원회 시행 □ '23.02 : 사업시행계획서 공고열람 시행 및 주민설명회 시행 □ '23.03 : 전원개발사업 실시계획 승인신청 □ '24.07 : 전원개발사업 실시계획 승인고시(산자부 고시 제2024-118호) □ '24.08 : 용지매수 의뢰 □ '25.04 : 기본설계 완료 2. 향후계획 □ '26.03 : 공사착공 □ '27.06 : 가압 및 준공 attachment_count 0 source_detail_sha256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231522|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_12087962bfde63e3 stable_project_key prjtDef:231522:ESB project_definition 231522 first_region_code ESB manual_source_format false project_name 154kV 상운S/S 건설사업 project_name_list 154kV 상운S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경상북도 봉화군 project_period_raw 2021.11~2027.06 project_scale_raw 60MVA X 2BANK(최종 4BANK) responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_12087962bfde63e3
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_12087962bfde63e3
Sources EV-581344484a51338356f2b5a7 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 548a814b387b410c8135a617516c0362f4be966c2c126e0001fdc66a9322ee30 Observations for this power asset History for this project