POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 2201–2300 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231480|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_c898dca6455a2b18 stable_project_id kproj_a55d761d43c9a76b source_key 202609|231480|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 북김제변전소 건설사업 project_name_detail 154kV 북김제S/S 건설사업 region_summary_raw 전북특별자치도 김제시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 154KV M.TR 2BANK (최종4BANK) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2024.03~2024.07 경과지(부지) 확정: 2024.04 환경/재해 영향평가 환경영향평가: 2024.05 ~ 2025.03 재해영향평가: 2023.01 ~ 2025.05 주민의견 수렴 지자체 공고 열람: 2024.07 ~ 2024.07 설명회·공청회: 2024.07 자체설명회: 사업설계 설계용역: 기본설계: 2025.08 ~ 2025.09 실시설계: 설계담당자: [redacted] [추진실적] □‘18.07 : 제8차 장기 송변전설비계획 사업반영 □‘24.03 : 입지선정실무위원회 구성 및 시행 □‘24.03 : 지장유무조회 요청(→김제시, 군부대) □‘24.04 : 입지확정위원회 구성 및 시행 □‘24.06 : 부지확정 보고 □‘24.09 : 실시계획 승인신청 □‘25.08 : 실시계획 승인 [향후계획] □‘26.09 : 용지매수 완료 □‘26.10 : 건설공사 착공 future_plan_redacted □ 향후계획 [추진실적] □‘18.07 : 제8차 장기 송변전설비계획 사업반영 □‘24.03 : 입지선정실무위원회 구성 및 시행 □‘24.03 : 지장유무조회 요청(→김제시, 군부대) □‘24.04 : 입지확정위원회 구성 및 시행 □‘24.06 : 부지확정 보고 □‘24.09 : 실시계획 승인신청 □‘25.08 : 실시계획 승인 [향후계획] □‘26.09 : 용지매수 완료 □‘26.10 : 건설공사 착공 attachment_count 0 source_detail_sha256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231480|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c898dca6455a2b18
Sources EV-452010b56a7ae8c6a46c0014 Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8 행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a55d761d43c9a76b stable_project_key prjtDef:231480:ESB project_definition 231480 first_region_code ESB manual_source_format false project_name 154kV 북김제S/S 건설사업 project_name_list 154kV 북김제변전소 건설사업 purpose 김제지역 재생E 접속지연 해소 및 산단부하 project_region_detail 전북특별자치도 김제시 project_period_raw 2018.07~2028.12 project_scale_raw 154KV M.TR 2BANK (최종4BANK) responsible_office_raw 중부건설본부/전북건설지사 equipment_type 변전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_a55d761d43c9a76b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a55d761d43c9a76b
Sources EV-8ab5436d405f71f2d37eb39a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 808e731ed5608d202eab6413e6ab5449f4892e12f92ff29dd5edeb81cbe14d42 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-ef5fdfb5b1e7fd831b39db93
Detailed source fields Original source field Published value or condition stable_project_id kproj_f25b07f322196df2 stable_project_key prjtDef:233653:ESB project_definition 233653 first_region_code ESB manual_source_format false project_name 154kV 북김제분기 지중T/L 건설사업 project_name_list 154kV 북김제분기 지중T/L 건설사업 purpose 북김제S/S 신설에 따른 계통연계 project_region_detail 전북특별자치도 김제시 project_period_raw 2024.07~2024.10 project_scale_raw XLPE1200㎟X4C, 0.1KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f25b07f322196df2
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f25b07f322196df2
Sources EV-ef5fdfb5b1e7fd831b39db93 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 012d6668929e61b68d9fdbbc58293de9574c3e793b663852bdce554db3938a69 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2021-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-04-09 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2024-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2024-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233653|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_1d7e786d78233f53 stable_project_id kproj_f25b07f322196df2 source_key 202609|233653|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북김제분기 지중T/L 건설사업 project_name_detail 154kV 북김제분기 지중T/L 건설사업 region_summary_raw 전북특별자치도 김제시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [시행근거] □ ‘18.06 <제8차 장기송변전설비계획> 신규사업 반영 [추진현황] □ ’21.09 준공목표 변경(‘21.12⇒’23.10), 제9차 장기송변전설비계획 □ ’23.01 북김제S/S 입지확정위원회 결과에 따른 변전소 위치 변경 □ ‘23.10 송변전설비계획 적정성 검토에 따른 준공목표 변경 요청 ○ 준공목표 : (당초) ’23.10 → (변경) ‘26.10 □ ‘24.04.09 북김제S/S 입지확정(변경)위원회 결과 보고 ○ 준공목표 : (당초) ’26.10 → (변경) ‘27.12 [추진계획] □‘24.08. 지중 인출방안 검토 및 기본설계 착수 future_plan_redacted □ 향후계획 [시행근거] □ ‘18.06 <제8차 장기송변전설비계획> 신규사업 반영 [추진현황] □ ’21.09 준공목표 변경(‘21.12⇒’23.10), 제9차 장기송변전설비계획 □ ’23.01 북김제S/S 입지확정위원회 결과에 따른 변전소 위치 변경 □ ‘23.10 송변전설비계획 적정성 검토에 따른 준공목표 변경 요청 ○ 준공목표 : (당초) ’23.10 → (변경) ‘26.10 □ ‘24.04.09 북김제S/S 입지확정(변경)위원회 결과 보고 ○ 준공목표 : (당초) ’26.10 → (변경) ‘27.12 [추진계획] □‘24.08. 지중 인출방안 검토 및 기본설계 착수 attachment_count 0 source_detail_sha256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233653|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1d7e786d78233f53
Sources EV-9cc5b5c672e034e9abadee6c Evidence SHA-256 8d06b78af68fd615781cfc9bccbbb377a23298e7b4837f974d5ade9d2d42a3e4 행 SHA-256 5045dbf3c58fb2700eed6a7d0967e4e963bd9662b88ccd59e840f39e474aab10 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_f25b07f322196df2 stable_project_key prjtDef:233653:ESB project_definition 233653 first_region_code ESB manual_source_format false project_name 154kV 북김제분기 지중T/L 건설사업 project_name_list 154kV 북김제분기 지중T/L 건설사업 purpose 북김제S/S 신설에 따른 계통연계 project_region_detail 전북특별자치도 김제시 project_period_raw 2024.07~2024.10 project_scale_raw XLPE1200㎟X4C, 0.1KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f25b07f322196df2
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f25b07f322196df2
Sources EV-ef5fdfb5b1e7fd831b39db93 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 012d6668929e61b68d9fdbbc58293de9574c3e793b663852bdce554db3938a69 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-443f1a704ef7e7ab5d23a4e6
Detailed source fields Original source field Published value or condition stable_project_id kproj_df2b7d12e53e8a8e stable_project_key prjtDef:232547:ESB project_definition 232547 first_region_code ESB manual_source_format false project_name 154kV 북김제분기T/L 건설사업 project_name_list 154kV 북김제분기 송전선로 건설사업 purpose 신재생E 연계력 확충 project_region_detail 전북특별자치도 김제시 project_period_raw 2018.07~2026.10 project_scale_raw PIAC 240㎟XSX4C,0.5KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_df2b7d12e53e8a8e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_df2b7d12e53e8a8e
Sources EV-443f1a704ef7e7ab5d23a4e6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 467ba174fb6616a3e2118c2e0d3449e1fca53c77953d168d00c302e210e38bd4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232547|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56cea1f9b57170d2
Sources EV-33c18dd65b062d649bbecf22 Evidence SHA-256 007036e96a345e701e7b57da9326ffd5813063b486a34ff3bfd0d98e61de1ae4 행 SHA-256 ce60a4b09dfd08492c9bd2b1736ea06e449ff86ba5a4e598ef02e4b74e9c2977 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232547|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56cea1f9b57170d2
Sources EV-33c18dd65b062d649bbecf22 Evidence SHA-256 007036e96a345e701e7b57da9326ffd5813063b486a34ff3bfd0d98e61de1ae4 행 SHA-256 ce60a4b09dfd08492c9bd2b1736ea06e449ff86ba5a4e598ef02e4b74e9c2977 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_56cea1f9b57170d2 stable_project_id kproj_df2b7d12e53e8a8e source_key 202609|232547|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북김제분기 송전선로 건설사업 project_name_detail 154kV 북김제분기T/L 건설사업 region_summary_raw 전북특별자치도 김제시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 2024.01 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2024.03~2024.04 경과지(부지) 확정: 2024.04 환경/재해 영향평가 환경영향평가: 2024.06 ~ 2025.02 재해영향평가: 2024.06 ~ 2025.02 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [추진실적] □‘18.07 : 제8차 장기 송변전설비계획 사업반영 □‘24.03 : 입지선정실무위원회 구성 및 시행 □‘24.03 : 지장유무조회 요청(→김제시, 군부대) □‘24.04 : 입지확정위원회 구성 및 시행 □‘24.06 : 부지확정 보고 □‘24.07 : 사업시행계획 공고 및 열람, 주민설명회 시행 □‘24.09 : 실시계획 승인신청 [향후계획] □‘25.04 : 기본설계 □‘25.07 : 실시설계 □‘25.10 : 자재발주, 공사계약 □‘26.04 : 공사착공 □‘26.12 : 공사준공 future_plan_redacted □ 향후계획 [추진실적] □‘18.07 : 제8차 장기 송변전설비계획 사업반영 □‘24.03 : 입지선정실무위원회 구성 및 시행 □‘24.03 : 지장유무조회 요청(→김제시, 군부대) □‘24.04 : 입지확정위원회 구성 및 시행 □‘24.06 : 부지확정 보고 □‘24.07 : 사업시행계획 공고 및 열람, 주민설명회 시행 □‘24.09 : 실시계획 승인신청 [향후계획] □‘25.04 : 기본설계 □‘25.07 : 실시설계 □‘25.10 : 자재발주, 공사계약 □‘26.04 : 공사착공 □‘26.12 : 공사준공 attachment_count 0 source_detail_sha256 007036e96a345e701e7b57da9326ffd5813063b486a34ff3bfd0d98e61de1ae4 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232547|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56cea1f9b57170d2
Sources EV-33c18dd65b062d649bbecf22 Evidence SHA-256 007036e96a345e701e7b57da9326ffd5813063b486a34ff3bfd0d98e61de1ae4 행 SHA-256 ce60a4b09dfd08492c9bd2b1736ea06e449ff86ba5a4e598ef02e4b74e9c2977 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_df2b7d12e53e8a8e stable_project_key prjtDef:232547:ESB project_definition 232547 first_region_code ESB manual_source_format false project_name 154kV 북김제분기T/L 건설사업 project_name_list 154kV 북김제분기 송전선로 건설사업 purpose 신재생E 연계력 확충 project_region_detail 전북특별자치도 김제시 project_period_raw 2018.07~2026.10 project_scale_raw PIAC 240㎟XSX4C,0.5KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_df2b7d12e53e8a8e
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_df2b7d12e53e8a8e
Sources EV-443f1a704ef7e7ab5d23a4e6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 467ba174fb6616a3e2118c2e0d3449e1fca53c77953d168d00c302e210e38bd4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-872f21e40351726fa4df91eb
Detailed source fields Original source field Published value or condition stable_project_id kproj_2cada8450c261d97 stable_project_key prjtDef:232651:ESB project_definition 232651 first_region_code ESB manual_source_format false project_name 154kV 북남원분기T/L 건설사업 project_name_list 154kV 북남원분기 송전선로 건설사업 purpose 154KV 북남원분기 송전선로 건설사업 project_region_detail 전북특별자치도 남원시 project_period_raw 2024.07~2030.12 project_scale_raw PIAC 410 X 4C X 2KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_2cada8450c261d97
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2cada8450c261d97
Sources EV-872f21e40351726fa4df91eb Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0626c5d8aa5afbe38b609641fcb30ad36500cf1211fe3f076a415489f5884413 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_c491c16305e538e8 stable_project_id kproj_2cada8450c261d97 source_key 202609|232651|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북남원분기 송전선로 건설사업 project_name_detail 154kV 북남원분기T/L 건설사업 region_summary_raw 전북특별자치도 남원시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 2024.07 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [진행경과] □ '23.05 : 제10차 장기 송변전설비계획 신규 반영 □ '24.07 : 전력영향평가 용역 착수 □ '24.11 : 지자체 및 사매면 이장단 대상 사업설명회 시행 완료 □ '24.12 : 입지선정위원회 위원 추천 요청(남원시청) □ '25.03 : 입지선정위원회 구성완료 □ '25.05 : 주민대상 사업설명 시행(6개 마을 및 발전협의회) □ '25.06 : 사매면 이장단 및 발전협의회 대상 사업설명시행 □ '25.07 : 남원시장 대상 사업설명시행 □ '25.08 : 남원시 기원지원과 협의 □ '25.09 : 사매면(지자체,주민) 대상 사업설명 및 사업추진경과 공유 □ '25.10 : 강성민원(양계장 주인) 개별면담시행, 혼불문학제 지원, 남원시청 기업정책과장 대상 변전소 입지 관련 협의 □ '25.11 : 사업 필요성 자료 보충 후 남원시청 부시장 협의 추진 □ '26.01 : 변전소 산단 內 유치 관련 남원시장 보고결과(기업정책과→남원시장) 공유 ○ 산단 內 반영 가능 입장, 정확한 위치는 선거후 구체화 협의예정 future_plan_redacted □ 향후계획 [진행경과] □ '23.05 : 제10차 장기 송변전설비계획 신규 반영 □ '24.07 : 전력영향평가 용역 착수 □ '24.11 : 지자체 및 사매면 이장단 대상 사업설명회 시행 완료 □ '24.12 : 입지선정위원회 위원 추천 요청(남원시청) □ '25.03 : 입지선정위원회 구성완료 □ '25.05 : 주민대상 사업설명 시행(6개 마을 및 발전협의회) □ '25.06 : 사매면 이장단 및 발전협의회 대상 사업설명시행 □ '25.07 : 남원시장 대상 사업설명시행 □ '25.08 : 남원시 기원지원과 협의 □ '25.09 : 사매면(지자체,주민) 대상 사업설명 및 사업추진경과 공유 □ '25.10 : 강성민원(양계장 주인) 개별면담시행, 혼불문학제 지원, 남원시청 기업정책과장 대상 변전소 입지 관련 협의 □ '25.11 : 사업 필요성 자료 보충 후 남원시청 부시장 협의 추진 □ '26.01 : 변전소 산단 內 유치 관련 남원시장 보고결과(기업정책과→남원시장) 공유 ○ 산단 內 반영 가능 입장, 정확한 위치는 선거후 구체화 협의예정 attachment_count 0 source_detail_sha256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232651|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_2cada8450c261d97 stable_project_key prjtDef:232651:ESB project_definition 232651 first_region_code ESB manual_source_format false project_name 154kV 북남원분기T/L 건설사업 project_name_list 154kV 북남원분기 송전선로 건설사업 purpose 154KV 북남원분기 송전선로 건설사업 project_region_detail 전북특별자치도 남원시 project_period_raw 2024.07~2030.12 project_scale_raw PIAC 410 X 4C X 2KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_2cada8450c261d97
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2cada8450c261d97
Sources EV-872f21e40351726fa4df91eb Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0626c5d8aa5afbe38b609641fcb30ad36500cf1211fe3f076a415489f5884413 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-d12d190964b6d35e15d47046
Detailed source fields Original source field Published value or condition stable_project_id kproj_816f2dd983a85ac5 stable_project_key prjtDef:231525:ESB project_definition 231525 first_region_code ESB manual_source_format false project_name 154kV 북다산S/S 건설사업 project_name_list 154kV 북다산 변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경상북도 고령군 project_period_raw 2021.10~2026.06 project_scale_raw 40MVA X 2BANK responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_816f2dd983a85ac5
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_816f2dd983a85ac5
Sources EV-d12d190964b6d35e15d47046 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 21e768a2e6d4e7c203d5045e3b8d2722462a9ff48b47889cc9e4074129a1f634 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231525|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_030607b2e3268e67
Sources EV-78a870f279d28a16737c2475 Evidence SHA-256 3cb50e88c71f95ee3a4bd7584b3013b771512978c26fc842bc9ffb34a667e456 행 SHA-256 0aa2f422370a64c04243fcd2c4bd628f74ed0f063b8c2150f8a67a9936065e40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231525|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_030607b2e3268e67
Sources EV-78a870f279d28a16737c2475 Evidence SHA-256 3cb50e88c71f95ee3a4bd7584b3013b771512978c26fc842bc9ffb34a667e456 행 SHA-256 0aa2f422370a64c04243fcd2c4bd628f74ed0f063b8c2150f8a67a9936065e40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_030607b2e3268e67 stable_project_id kproj_816f2dd983a85ac5 source_key 202609|231525|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 북다산 변전소 건설사업 project_name_detail 154kV 북다산S/S 건설사업 region_summary_raw 경상북도 고령군등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2022.11 ~ 2022.12 실시설계: 2024.01 ~ 2024.07 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.05 공사 기간: 2025.05 ~ 2026.07 감독자: [redacted], 실적): 100, 81 future_plan_redacted □ 향후계획 ㅁ'26.06 : 준공 및 가압 attachment_count 0 source_detail_sha256 3cb50e88c71f95ee3a4bd7584b3013b771512978c26fc842bc9ffb34a667e456 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231525|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_030607b2e3268e67
Sources EV-78a870f279d28a16737c2475 Evidence SHA-256 3cb50e88c71f95ee3a4bd7584b3013b771512978c26fc842bc9ffb34a667e456 행 SHA-256 0aa2f422370a64c04243fcd2c4bd628f74ed0f063b8c2150f8a67a9936065e40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_816f2dd983a85ac5 stable_project_key prjtDef:231525:ESB project_definition 231525 first_region_code ESB manual_source_format false project_name 154kV 북다산S/S 건설사업 project_name_list 154kV 북다산 변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경상북도 고령군 project_period_raw 2021.10~2026.06 project_scale_raw 40MVA X 2BANK responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_816f2dd983a85ac5
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_816f2dd983a85ac5
Sources EV-d12d190964b6d35e15d47046 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 21e768a2e6d4e7c203d5045e3b8d2722462a9ff48b47889cc9e4074129a1f634 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-bd2d373178431380a8a3feae
Detailed source fields Original source field Published value or condition stable_project_id kproj_e07b9efaa55c9632 stable_project_key prjtDef:232574:ESB project_definition 232574 first_region_code ESB manual_source_format false project_name 154kV 북다산분기 T/L 건설사업 project_name_list 154kV 북다산분기 T/L 건설사업 purpose 월성산업단지 등 신규부하 공급 project_region_detail 경상북도 고령군 project_period_raw 2023.05~2026.04 project_scale_raw ACSR 410㎟× B × 4C × 0.4㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_e07b9efaa55c9632
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e07b9efaa55c9632
Sources EV-bd2d373178431380a8a3feae Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 388d76dd97a5e9fcea24423b287ffc38ec87a02dd2152c4b1cd7ef387588fcdc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_94a1433f4aecfe6e stable_project_id kproj_e07b9efaa55c9632 source_key 202609|232574|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 북다산분기 T/L 건설사업 project_name_detail 154kV 북다산분기 T/L 건설사업 region_summary_raw 경상북도 고령군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2023.03 환경/재해 영향평가 환경영향평가: 2023.07 ~ 2024.09 재해영향평가: 주민의견 수렴 지자체 공고 열람: 2023.05 ~ 2023.05 설명회·공청회: 2023.05 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 ※ 본 사업은 고령군 다산면 "월성일반산업단지" 개발에 따른 부하 공급능력 확보를 목표로 시행함 ○ 진행경과 - 21년 9월 : 제9차 장기송변전설비계획 사업 반영 - 23년 3월 : 입지확정 - 23년 7월 : 전원개발사업 실시계획 승인 신청 - 25년 9월 : 공사 계약 - 25년 10월 : 책임감리용역 계약, 공사 착공 및 중지 - 26년 5월 : 공사 재착공 예정(월성일반산업단지 조성 일정 및 부하예측 전망에 따라 공사일정 변동) 사업설계 설계용역: 기본설계: 2023.08 ~ 2023.08 실시설계: 2023.09 ~ 2025.02 설계담당자: [redacted] future_plan_redacted □ 향후계획 - 27년 6월 : 공사 가압. attachment_count 0 source_detail_sha256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232574|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_e07b9efaa55c9632 stable_project_key prjtDef:232574:ESB project_definition 232574 first_region_code ESB manual_source_format false project_name 154kV 북다산분기 T/L 건설사업 project_name_list 154kV 북다산분기 T/L 건설사업 purpose 월성산업단지 등 신규부하 공급 project_region_detail 경상북도 고령군 project_period_raw 2023.05~2026.04 project_scale_raw ACSR 410㎟× B × 4C × 0.4㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_e07b9efaa55c9632
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e07b9efaa55c9632
Sources EV-bd2d373178431380a8a3feae Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 388d76dd97a5e9fcea24423b287ffc38ec87a02dd2152c4b1cd7ef387588fcdc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-e71e2af5c2d9d91888acf221
Detailed source fields Original source field Published value or condition stable_project_id kproj_cfbeec3b86d38f35 stable_project_key prjtDef:233501:ESB project_definition 233501 first_region_code ESB manual_source_format false project_name 154kV 북당진-송악 지중T/L 건설사업 project_name_list 154kV 북당진-송악 지중T/L 건설사업 purpose 충남 서북부권역(당진, 아산) 취약계통 보? project_region_detail Dangjin City, South Chungcheong Province project_period_raw 2028.01~2028.12 project_scale_raw 154KV XLPE 2500㎟, 1C-2.3KM responsible_office_raw 중부건설본부/직할 equipment_type 지중송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_cfbeec3b86d38f35
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_cfbeec3b86d38f35
Sources EV-e71e2af5c2d9d91888acf221 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f6e6defa41d52d4960bdd33909c09a9d52f803bf88212ab97c9adc3b6c792917 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233501|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_da0fe2b3144acfdb
Sources EV-707e1315bbadb1e762f4c3a4 Evidence SHA-256 4cc994d551c1bc40820eaac377da429aaea572549d01b0916fe570c465b420aa 행 SHA-256 885ab912620ed5a86aaa79f34b89318729cfa3998d17d404485c7eb413537b76 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2028-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233501|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_da0fe2b3144acfdb
Sources EV-707e1315bbadb1e762f4c3a4 Evidence SHA-256 4cc994d551c1bc40820eaac377da429aaea572549d01b0916fe570c465b420aa 행 SHA-256 885ab912620ed5a86aaa79f34b89318729cfa3998d17d404485c7eb413537b76 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_da0fe2b3144acfdb stable_project_id kproj_cfbeec3b86d38f35 source_key 202609|233501|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북당진-송악 지중T/L 건설사업 project_name_detail 154kV 북당진-송악 지중T/L 건설사업 region_summary_raw 충청남도 당진시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Dangjin City, South Chungcheong Province 사업 규모 154KV XLPE 2500㎟, 1C-2.3KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 지중송전선로 건설공사 기본설계 착수 대기(토목공정 미완료) future_plan_redacted □ 향후계획 지중송전선로 건설공사 기본설계 착수 대기(토목공정 미완료) attachment_count 0 source_detail_sha256 4cc994d551c1bc40820eaac377da429aaea572549d01b0916fe570c465b420aa first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233501|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_da0fe2b3144acfdb
Sources EV-707e1315bbadb1e762f4c3a4 Evidence SHA-256 4cc994d551c1bc40820eaac377da429aaea572549d01b0916fe570c465b420aa 행 SHA-256 885ab912620ed5a86aaa79f34b89318729cfa3998d17d404485c7eb413537b76 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_cfbeec3b86d38f35 stable_project_key prjtDef:233501:ESB project_definition 233501 first_region_code ESB manual_source_format false project_name 154kV 북당진-송악 지중T/L 건설사업 project_name_list 154kV 북당진-송악 지중T/L 건설사업 purpose 충남 서북부권역(당진, 아산) 취약계통 보? project_region_detail Dangjin City, South Chungcheong Province project_period_raw 2028.01~2028.12 project_scale_raw 154KV XLPE 2500㎟, 1C-2.3KM responsible_office_raw 중부건설본부/직할 equipment_type 지중송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_cfbeec3b86d38f35
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_cfbeec3b86d38f35
Sources EV-e71e2af5c2d9d91888acf221 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f6e6defa41d52d4960bdd33909c09a9d52f803bf88212ab97c9adc3b6c792917 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b2d3906fc4e72cebd080469d
Detailed source fields Original source field Published value or condition stable_project_id kproj_03ed95ee224e32de stable_project_key prjtDef:231611:ESB project_definition 231611 first_region_code ESB manual_source_format false project_name 154kV 북리S/S 건설사업 project_name_list 154kV 북리변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경기도 용인시 처인구 project_period_raw 2023.04~2029.10 project_scale_raw 154KV M.TR (45/60MVA) X 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_03ed95ee224e32de
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_03ed95ee224e32de
Sources EV-b2d3906fc4e72cebd080469d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ebcb6932801212012028b8cf447ff1bb98400e31082bf5b13f102975415cea1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231611|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0495734fc7322419
Sources EV-41a8d5bb1aa2f06cb4cf39eb Evidence SHA-256 679367c49a2f577d594f67f3315a9f19c9c8124664dfe9b4664f8a46cece9616 행 SHA-256 4456a81c534ccea2f418012ce10c6a2a5db8dde430c4863bb4aa64aba2047f5d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231611|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0495734fc7322419
Sources EV-41a8d5bb1aa2f06cb4cf39eb Evidence SHA-256 679367c49a2f577d594f67f3315a9f19c9c8124664dfe9b4664f8a46cece9616 행 SHA-256 4456a81c534ccea2f418012ce10c6a2a5db8dde430c4863bb4aa64aba2047f5d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0495734fc7322419 stable_project_id kproj_03ed95ee224e32de source_key 202609|231611|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북리변전소 건설사업 project_name_detail 154kV 북리S/S 건설사업 region_summary_raw 경기도 용인시 처인구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields 사업 규모 154KV M.TR (45/60MVA) X 2BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: ○ 진행경과 - '23.04 : 제10차 장기송변전설비계획 신규반영 - '23.12 : 입지선정실무위원회 구성 및 운영 - '24.07 : 입지선정실무위원회 완료 ○ 향후계획 - '26.09 : 변전소 부지 확정 - '30.07 : 토건공사 착공 - '30.10 : 변전공사 착공 - '32.06 : 변전소 최초가압 future_plan_redacted □ 향후계획 ○ 진행경과 - '23.04 : 제10차 장기송변전설비계획 신규반영 - '23.12 : 입지선정실무위원회 구성 및 운영 - '24.07 : 입지선정실무위원회 완료 ○ 향후계획 - '26.09 : 변전소 부지 확정 - '30.07 : 토건공사 착공 - '30.10 : 변전공사 착공 - '32.06 : 변전소 최초가압 attachment_count 0 source_detail_sha256 679367c49a2f577d594f67f3315a9f19c9c8124664dfe9b4664f8a46cece9616 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231611|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0495734fc7322419
Sources EV-41a8d5bb1aa2f06cb4cf39eb Evidence SHA-256 679367c49a2f577d594f67f3315a9f19c9c8124664dfe9b4664f8a46cece9616 행 SHA-256 4456a81c534ccea2f418012ce10c6a2a5db8dde430c4863bb4aa64aba2047f5d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_03ed95ee224e32de stable_project_key prjtDef:231611:ESB project_definition 231611 first_region_code ESB manual_source_format false project_name 154kV 북리S/S 건설사업 project_name_list 154kV 북리변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경기도 용인시 처인구 project_period_raw 2023.04~2029.10 project_scale_raw 154KV M.TR (45/60MVA) X 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_03ed95ee224e32de
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_03ed95ee224e32de
Sources EV-b2d3906fc4e72cebd080469d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ebcb6932801212012028b8cf447ff1bb98400e31082bf5b13f102975415cea1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-94aa0431c9417d26dff96db4
Detailed source fields Original source field Published value or condition stable_project_id kproj_dd0483cb6da14ddc stable_project_key prjtDef:231453:ESB project_definition 231453 first_region_code ESB manual_source_format false project_name 154kV 북성주S/S 건설사업 project_name_list 154kV 북성주변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경상북도 성주군 project_period_raw 2018.06~2027.06 project_scale_raw 154KV M.TR 30MVA × 2BANK, 154KV GIS × 7CCT responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_dd0483cb6da14ddc
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_dd0483cb6da14ddc
Sources EV-94aa0431c9417d26dff96db4 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c64529e98c0b27d4ce161cdcd4a984fc3669b372626440d975dd93efb96fd61b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231453|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7691cfa3b32e896
Sources EV-bae8de092b26ad9196968de8 Evidence SHA-256 f4598f8de099e6c84f84c21427a066f201197a8d629d80c394b6e2d0004fad5a 행 SHA-256 47fa44e332b203455b28270de94271c23ab386f9fb2c549b792202308af2e426 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231453|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7691cfa3b32e896
Sources EV-bae8de092b26ad9196968de8 Evidence SHA-256 f4598f8de099e6c84f84c21427a066f201197a8d629d80c394b6e2d0004fad5a 행 SHA-256 47fa44e332b203455b28270de94271c23ab386f9fb2c549b792202308af2e426 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b7691cfa3b32e896 stable_project_id kproj_dd0483cb6da14ddc source_key 202609|231453|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 북성주변전소 건설사업 project_name_detail 154kV 북성주S/S 건설사업 region_summary_raw 경상북도 성주군등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 154KV M.TR 30MVA × 2BANK, 154KV GIS × 7CCT 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2022.03~2022.04 경과지(부지) 확정: 환경/재해 영향평가 환경영향평가: 2023.03 ~ 2023.04 재해영향평가: 주민의견 수렴 지자체 공고 열람: 2022.12 ~ 2022.12 설명회·공청회: 2022.12 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ '18.06 : 제8차 장기 송배전설비계획 확정 □ '18.09 : 입지선정 착수 및 실무위원회 구성 (산단내 건설 추진) □ '19.08 : 산단내 변전소 반영 예정 (성주군청) □ '20.11 : 산단조성지연에 따른 관련부서 대책회의 시행 □ '21.06 : 성주군 산단 추진현황 회신 (입주 2025년, 지연 예상) □ '21.08 : 입지선정 실무자 회의 (추진법령 변경:산입법→전촉법) □ '21.10.29 : 제1차 입지선정실무위원회의 (2개 후보지 선정) □ '21. 7.12 : 제2차 입지선정실무위원회의 (2개 후보지 재선정) ※ 제1후보지 : 학산리 725-1번지 일원, 제2후보지 : 금산리 811-7번지 일원 □ '22. 6 : 지장유무 조회결과(2개 후보지 모두 적격 판정) □ '22.10 : 입지확정 (학산리 725-1번지 일원) 사업설계 설계용역: 기본설계: 2023.12 ~ 2024.01 실시설계: 2025.01 ~ 2025.03 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.07 공사 기간: 2025.07 ~ 2027.06 감독자: [redacted], 실적): 76, 24 □ '25.11 : 변전공사착공 □ '27.06 : 공사준공 future_plan_redacted □ 향후계획 □ '25.11 : 변전공사착공 □ '27.06 : 공사준공 attachment_count 0 source_detail_sha256 f4598f8de099e6c84f84c21427a066f201197a8d629d80c394b6e2d0004fad5a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231453|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7691cfa3b32e896
Sources EV-bae8de092b26ad9196968de8 Evidence SHA-256 f4598f8de099e6c84f84c21427a066f201197a8d629d80c394b6e2d0004fad5a 행 SHA-256 47fa44e332b203455b28270de94271c23ab386f9fb2c549b792202308af2e426 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_dd0483cb6da14ddc stable_project_key prjtDef:231453:ESB project_definition 231453 first_region_code ESB manual_source_format false project_name 154kV 북성주S/S 건설사업 project_name_list 154kV 북성주변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경상북도 성주군 project_period_raw 2018.06~2027.06 project_scale_raw 154KV M.TR 30MVA × 2BANK, 154KV GIS × 7CCT responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_dd0483cb6da14ddc
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_dd0483cb6da14ddc
Sources EV-94aa0431c9417d26dff96db4 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c64529e98c0b27d4ce161cdcd4a984fc3669b372626440d975dd93efb96fd61b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7d672d3130f96bdc034742ce
Detailed source fields Original source field Published value or condition stable_project_id kproj_0d85726fe58d5082 stable_project_key prjtDef:234700:ESB project_definition 234700 first_region_code ESB manual_source_format false project_name 154kV 북성주분기 전력구 건설사업 project_name_list 성주지역 전기공급시설 전려구공사(북성주분기) purpose 성주2산단 전력공급 및 인근 변전소 과부하 해소 project_region_detail 경상북도 성주군 project_period_raw 2023.10~2026.10 project_scale_raw 전력구 93M, 환기구 1개소 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 전력구 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_0d85726fe58d5082
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0d85726fe58d5082
Sources EV-7d672d3130f96bdc034742ce Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9ee06e2db782f3075aa113f7e8c775bdc7b63490c33d978358afe6bdb8c88aec Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234700|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6b350b32b8a6967f
Sources EV-12d75e30dbe54e028e3a62c0 Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc 행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234700|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6b350b32b8a6967f
Sources EV-12d75e30dbe54e028e3a62c0 Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc 행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2024-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234700|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6b350b32b8a6967f
Sources EV-12d75e30dbe54e028e3a62c0 Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc 행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234700|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6b350b32b8a6967f
Sources EV-12d75e30dbe54e028e3a62c0 Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc 행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234700|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6b350b32b8a6967f
Sources EV-12d75e30dbe54e028e3a62c0 Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc 행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234700|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6b350b32b8a6967f
Sources EV-12d75e30dbe54e028e3a62c0 Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc 행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234700|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6b350b32b8a6967f
Sources EV-12d75e30dbe54e028e3a62c0 Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc 행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234700|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6b350b32b8a6967f
Sources EV-12d75e30dbe54e028e3a62c0 Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc 행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234700|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6b350b32b8a6967f
Sources EV-12d75e30dbe54e028e3a62c0 Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc 행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791 Observations for this power asset History for this project Previous Next