POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북성주S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-94aa0431c9417d26dff96db4
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_dd0483cb6da14ddc
stable_project_keyprjtDef:231453:ESB
project_definition231453
first_region_codeESB
manual_source_formatfalse
project_name154kV 북성주S/S 건설사업
project_name_list154kV 북성주변전소 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail경상북도 성주군
project_period_raw2018.06~2027.06
project_scale_raw154KV M.TR 30MVA × 2BANK, 154KV GIS × 7CCT
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b7691cfa3b32e896
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_dd0483cb6da14ddc

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_dd0483cb6da14ddc

Sources EV-94aa0431c9417d26dff96db4
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c64529e98c0b27d4ce161cdcd4a984fc3669b372626440d975dd93efb96fd61b
Source schedule candidates · KOR · kepco_planned

154kV 북성주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231453|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7691cfa3b32e896

Sources EV-bae8de092b26ad9196968de8
Evidence SHA-256 f4598f8de099e6c84f84c21427a066f201197a8d629d80c394b6e2d0004fad5a
행 SHA-256 47fa44e332b203455b28270de94271c23ab386f9fb2c549b792202308af2e426
Source schedule candidates · KOR · kepco_planned

154kV 북성주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231453|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7691cfa3b32e896

Sources EV-bae8de092b26ad9196968de8
Evidence SHA-256 f4598f8de099e6c84f84c21427a066f201197a8d629d80c394b6e2d0004fad5a
행 SHA-256 47fa44e332b203455b28270de94271c23ab386f9fb2c549b792202308af2e426
Source snapshots by date · KOR · kepco_planned

154kV 북성주S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b7691cfa3b32e896
stable_project_idkproj_dd0483cb6da14ddc
source_key202609|231453|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 북성주변전소 건설사업
project_name_detail154kV 북성주S/S 건설사업
region_summary_raw경상북도 성주군등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 경상북도 성주군
Project period
  • 2018.06~2027.06
사업 규모
  • 154KV M.TR 30MVA × 2BANK, 154KV GIS × 7CCT
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2022.03~2022.04 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 2023.03 ~ 2023.04 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 2022.12 ~ 2022.12 설명회·공청회: 2022.12 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ '18.06 : 제8차 장기 송배전설비계획 확정 □ '18.09 : 입지선정 착수 및 실무위원회 구성 (산단내 건설 추진) □ '19.08 : 산단내 변전소 반영 예정 (성주군청) □ '20.11 : 산단조성지연에 따른 관련부서 대책회의 시행 □ '21.06 : 성주군 산단 추진현황 회신 (입주 2025년, 지연 예상) □ '21.08 : 입지선정 실무자 회의 (추진법령 변경:산입법→전촉법) □ '21.10.29 : 제1차 입지선정실무위원회의 (2개 후보지 선정) □ '21. 7.12 : 제2차 입지선정실무위원회의 (2개 후보지 재선정) ※ 제1후보지 : 학산리 725-1번지 일원, 제2후보지 : 금산리 811-7번지 일원 □ '22. 6 : 지장유무 조회결과(2개 후보지 모두 적격 판정) □ '22.10 : 입지확정 (학산리 725-1번지 일원)
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2023.12 ~ 2024.01 실시설계: 2025.01 ~ 2025.03 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.07 공사 기간: 2025.07 ~ 2027.06 감독자: [redacted], 실적): 76, 24
□ '25.11 : 변전공사착공 □ '27.06 : 공사준공
future_plan_redacted□ 향후계획 □ '25.11 : 변전공사착공 □ '27.06 : 공사준공
attachment_count0
source_detail_sha256f4598f8de099e6c84f84c21427a066f201197a8d629d80c394b6e2d0004fad5a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231453|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7691cfa3b32e896

Sources EV-bae8de092b26ad9196968de8
Evidence SHA-256 f4598f8de099e6c84f84c21427a066f201197a8d629d80c394b6e2d0004fad5a
행 SHA-256 47fa44e332b203455b28270de94271c23ab386f9fb2c549b792202308af2e426
Source snapshots by date · KOR · kepco_planned

154kV 북성주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_dd0483cb6da14ddc
stable_project_keyprjtDef:231453:ESB
project_definition231453
first_region_codeESB
manual_source_formatfalse
project_name154kV 북성주S/S 건설사업
project_name_list154kV 북성주변전소 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail경상북도 성주군
project_period_raw2018.06~2027.06
project_scale_raw154KV M.TR 30MVA × 2BANK, 154KV GIS × 7CCT
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b7691cfa3b32e896
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_dd0483cb6da14ddc

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_dd0483cb6da14ddc

Sources EV-94aa0431c9417d26dff96db4
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c64529e98c0b27d4ce161cdcd4a984fc3669b372626440d975dd93efb96fd61b

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel