POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 19items · current page 1–19 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-7d672d3130f96bdc034742ce
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0d85726fe58d5082
stable_project_keyprjtDef:234700:ESB
project_definition234700
first_region_codeESB
manual_source_formatfalse
project_name154kV 북성주분기 전력구 건설사업
project_name_list성주지역 전기공급시설 전려구공사(북성주분기)
purpose성주2산단 전력공급 및 인근 변전소 과부하 해소
project_region_detail경상북도 성주군
project_period_raw2023.10~2026.10
project_scale_raw전력구 93M, 환기구 1개소
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type전력구
headquarters남부건설본부
office대구경북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6b350b32b8a6967f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0d85726fe58d5082

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0d85726fe58d5082

Sources EV-7d672d3130f96bdc034742ce
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9ee06e2db782f3075aa113f7e8c775bdc7b63490c33d978358afe6bdb8c88aec
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2024-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source schedule candidates · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234700|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source snapshots by date · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_6b350b32b8a6967f
stable_project_idkproj_0d85726fe58d5082
source_key202609|234700|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list성주지역 전기공급시설 전려구공사(북성주분기)
project_name_detail154kV 북성주분기 전력구 건설사업
region_summary_raw경상북도 성주군등 1 지역
equipment_type_raw전력구
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 성주2산단 전력공급 및 인근 변전소 과부하 해소
Project region
  • 경상북도 성주군
Project period
  • 2023.10~2026.10
사업 규모
  • 전력구 93M, 환기구 1개소
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2024.01 ~ 2025.04 기본설계: 2024.01 ~ 실시설계: 2024.01 ~ 2025.01 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.05 공사 기간: 2025.05 ~ 2026.09 감독자: [redacted], 실적): 94, 67
[추진실적] □ '23.10 : 현장답사 및 분석 보고(→송변전건설단) □ '23.11 : 기본계획 수립 알림(←송변전건설단) □ '24.01 : 설계용역 착수 □ '25.01 : 실시설계 완료 □ '25.05 : 공사 착수 □ '25.12 : 전력구가시설 및 터파기 완료 □ '26. 5 : 전력구 구조물 및 되메우기 완료 □ '26. 8 : 전력구 경과지 공원 및 도로 복구 완료
future_plan_redacted□ 향후계획 [추진실적] □ '23.10 : 현장답사 및 분석 보고(→송변전건설단) □ '23.11 : 기본계획 수립 알림(←송변전건설단) □ '24.01 : 설계용역 착수 □ '25.01 : 실시설계 완료 □ '25.05 : 공사 착수 □ '25.12 : 전력구가시설 및 터파기 완료 □ '26. 5 : 전력구 구조물 및 되메우기 완료 □ '26. 8 : 전력구 경과지 공원 및 도로 복구 완료
attachment_count0
source_detail_sha256ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234700|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6b350b32b8a6967f

Sources EV-12d75e30dbe54e028e3a62c0
Evidence SHA-256 ee1e8819b50fc0d44417d2cd6ab565d4b2b5214ef40dba65b16ef9b8cbda4efc
행 SHA-256 87848d0b952e1aa001a26bea2a505c3669704cdb4d99ec4518e77f9f5b389791
Source snapshots by date · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0d85726fe58d5082
stable_project_keyprjtDef:234700:ESB
project_definition234700
first_region_codeESB
manual_source_formatfalse
project_name154kV 북성주분기 전력구 건설사업
project_name_list성주지역 전기공급시설 전려구공사(북성주분기)
purpose성주2산단 전력공급 및 인근 변전소 과부하 해소
project_region_detail경상북도 성주군
project_period_raw2023.10~2026.10
project_scale_raw전력구 93M, 환기구 1개소
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type전력구
headquarters남부건설본부
office대구경북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6b350b32b8a6967f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0d85726fe58d5082

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0d85726fe58d5082

Sources EV-7d672d3130f96bdc034742ce
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9ee06e2db782f3075aa113f7e8c775bdc7b63490c33d978358afe6bdb8c88aec

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel