Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 북당진-송악 지중T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-e71e2af5c2d9d91888acf221
Sources EV-707e1315bbadb1e762f4c3a4 Evidence SHA-256 4cc994d551c1bc40820eaac377da429aaea572549d01b0916fe570c465b420aa 행 SHA-256 885ab912620ed5a86aaa79f34b89318729cfa3998d17d404485c7eb413537b76Source snapshots by date · KOR · kepco_planned
154kV 북당진-송악 지중T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_da0fe2b3144acfdb
stable_project_id
kproj_cfbeec3b86d38f35
source_key
202609|233501|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 북당진-송악 지중T/L 건설사업
project_name_detail
154kV 북당진-송악 지중T/L 건설사업
region_summary_raw
충청남도 당진시등 1 지역
equipment_type_raw
지중송전
headquarters_raw
중부건설본부
office_raw
직할
section_fields
Project purpose
충남 서북부권역(당진, 아산) 취약계통 보?
Project region
Dangjin City, South Chungcheong Province
Project period
2028.01~2028.12
사업 규모
154KV XLPE 2500㎟, 1C-2.3KM
담당 사업소
중부건설본부/직할
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-707e1315bbadb1e762f4c3a4 Evidence SHA-256 4cc994d551c1bc40820eaac377da429aaea572549d01b0916fe570c465b420aa 행 SHA-256 885ab912620ed5a86aaa79f34b89318729cfa3998d17d404485c7eb413537b76Source snapshots by date · KOR · kepco_planned