POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 26items · current page 1–26 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북김제S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-8ab5436d405f71f2d37eb39a
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a55d761d43c9a76b
stable_project_keyprjtDef:231480:ESB
project_definition231480
first_region_codeESB
manual_source_formatfalse
project_name154kV 북김제S/S 건설사업
project_name_list154kV 북김제변전소 건설사업
purpose김제지역 재생E 접속지연 해소 및 산단부하
project_region_detail전북특별자치도 김제시
project_period_raw2018.07~2028.12
project_scale_raw154KV M.TR 2BANK (최종4BANK)
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c898dca6455a2b18
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_a55d761d43c9a76b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a55d761d43c9a76b

Sources EV-8ab5436d405f71f2d37eb39a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 808e731ed5608d202eab6413e6ab5449f4892e12f92ff29dd5edeb81cbe14d42
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2025-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source schedule candidates · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231480|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source snapshots by date · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_c898dca6455a2b18
stable_project_idkproj_a55d761d43c9a76b
source_key202609|231480|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 북김제변전소 건설사업
project_name_detail154kV 북김제S/S 건설사업
region_summary_raw전북특별자치도 김제시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 김제지역 재생E 접속지연 해소 및 산단부하
Project region
  • 전북특별자치도 김제시
Project period
  • 2018.07~2028.12
사업 규모
  • 154KV M.TR 2BANK (최종4BANK)
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2024.03~2024.07 경과지(부지) 확정: 2024.04
환경/재해 영향평가
  • 환경영향평가: 2024.05 ~ 2025.03 재해영향평가: 2023.01 ~ 2025.05
주민의견 수렴
  • 지자체 공고 열람: 2024.07 ~ 2024.07 설명회·공청회: 2024.07 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2025.08 ~ 2025.09 실시설계: 설계담당자: [redacted]
[추진실적] □‘18.07 : 제8차 장기 송변전설비계획 사업반영 □‘24.03 : 입지선정실무위원회 구성 및 시행 □‘24.03 : 지장유무조회 요청(→김제시, 군부대) □‘24.04 : 입지확정위원회 구성 및 시행 □‘24.06 : 부지확정 보고 □‘24.09 : 실시계획 승인신청 □‘25.08 : 실시계획 승인 [향후계획] □‘26.09 : 용지매수 완료 □‘26.10 : 건설공사 착공
future_plan_redacted□ 향후계획 [추진실적] □‘18.07 : 제8차 장기 송변전설비계획 사업반영 □‘24.03 : 입지선정실무위원회 구성 및 시행 □‘24.03 : 지장유무조회 요청(→김제시, 군부대) □‘24.04 : 입지확정위원회 구성 및 시행 □‘24.06 : 부지확정 보고 □‘24.09 : 실시계획 승인신청 □‘25.08 : 실시계획 승인 [향후계획] □‘26.09 : 용지매수 완료 □‘26.10 : 건설공사 착공
attachment_count0
source_detail_sha256e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231480|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c898dca6455a2b18

Sources EV-452010b56a7ae8c6a46c0014
Evidence SHA-256 e94702e7c3a32e5cc2ea77545c65143f9a5ef784f843b214f68e7265fa4a36f8
행 SHA-256 0b71d418d8a381551e3353c3cbcf842d686c66a83d0060e980dbb722c5e59a0d
Source snapshots by date · KOR · kepco_planned

154kV 북김제S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a55d761d43c9a76b
stable_project_keyprjtDef:231480:ESB
project_definition231480
first_region_codeESB
manual_source_formatfalse
project_name154kV 북김제S/S 건설사업
project_name_list154kV 북김제변전소 건설사업
purpose김제지역 재생E 접속지연 해소 및 산단부하
project_region_detail전북특별자치도 김제시
project_period_raw2018.07~2028.12
project_scale_raw154KV M.TR 2BANK (최종4BANK)
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c898dca6455a2b18
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_a55d761d43c9a76b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a55d761d43c9a76b

Sources EV-8ab5436d405f71f2d37eb39a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 808e731ed5608d202eab6413e6ab5449f4892e12f92ff29dd5edeb81cbe14d42

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel