Power assets and projects · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-bd2d373178431380a8a3feae
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e07b9efaa55c9632
stable_project_keyprjtDef:232574:ESB
project_definition232574
first_region_codeESB
manual_source_formatfalse
project_name154kV 북다산분기 T/L 건설사업
project_name_list154kV 북다산분기 T/L 건설사업
purpose월성산업단지 등 신규부하 공급
project_region_detail경상북도 고령군
project_period_raw2023.05~2026.04
project_scale_rawACSR 410㎟× B × 4C × 0.4㎞
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_94a1433f4aecfe6e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_e07b9efaa55c9632

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e07b9efaa55c9632

Sources EV-bd2d373178431380a8a3feae
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 388d76dd97a5e9fcea24423b287ffc38ec87a02dd2152c4b1cd7ef387588fcdc
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source schedule candidates · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232574|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source snapshots by date · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_94a1433f4aecfe6e
stable_project_idkproj_e07b9efaa55c9632
source_key202609|232574|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 북다산분기 T/L 건설사업
project_name_detail154kV 북다산분기 T/L 건설사업
region_summary_raw경상북도 고령군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 월성산업단지 등 신규부하 공급
Project region
  • 경상북도 고령군
Project period
  • 2023.05~2026.04
사업 규모
  • ACSR 410㎟× B × 4C × 0.4㎞
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2023.03
환경/재해 영향평가
  • 환경영향평가: 2023.07 ~ 2024.09 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 2023.05 ~ 2023.05 설명회·공청회: 2023.05 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • ※ 본 사업은 고령군 다산면 "월성일반산업단지" 개발에 따른 부하 공급능력 확보를 목표로 시행함 ○ 진행경과 - 21년 9월 : 제9차 장기송변전설비계획 사업 반영 - 23년 3월 : 입지확정 - 23년 7월 : 전원개발사업 실시계획 승인 신청 - 25년 9월 : 공사 계약 - 25년 10월 : 책임감리용역 계약, 공사 착공 및 중지 - 26년 5월 : 공사 재착공 예정(월성일반산업단지 조성 일정 및 부하예측 전망에 따라 공사일정 변동)
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2023.08 ~ 2023.08 실시설계: 2023.09 ~ 2025.02 설계담당자: [redacted]
- 27년 6월 : 공사 가압.
future_plan_redacted□ 향후계획 - 27년 6월 : 공사 가압.
attachment_count0
source_detail_sha256da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232574|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_94a1433f4aecfe6e

Sources EV-a0f9dd48ae980cf1075933fb
Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02
행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad
Source snapshots by date · KOR · kepco_planned

154kV 북다산분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e07b9efaa55c9632
stable_project_keyprjtDef:232574:ESB
project_definition232574
first_region_codeESB
manual_source_formatfalse
project_name154kV 북다산분기 T/L 건설사업
project_name_list154kV 북다산분기 T/L 건설사업
purpose월성산업단지 등 신규부하 공급
project_region_detail경상북도 고령군
project_period_raw2023.05~2026.04
project_scale_rawACSR 410㎟× B × 4C × 0.4㎞
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_94a1433f4aecfe6e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_e07b9efaa55c9632

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e07b9efaa55c9632

Sources EV-bd2d373178431380a8a3feae
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 388d76dd97a5e9fcea24423b287ffc38ec87a02dd2152c4b1cd7ef387588fcdc

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel