POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 15items · current page 1–15 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-bd2d373178431380a8a3feae
Detailed source fields Original source field Published value or condition stable_project_id kproj_e07b9efaa55c9632 stable_project_key prjtDef:232574:ESB project_definition 232574 first_region_code ESB manual_source_format false project_name 154kV 북다산분기 T/L 건설사업 project_name_list 154kV 북다산분기 T/L 건설사업 purpose 월성산업단지 등 신규부하 공급 project_region_detail 경상북도 고령군 project_period_raw 2023.05~2026.04 project_scale_raw ACSR 410㎟× B × 4C × 0.4㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_e07b9efaa55c9632
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e07b9efaa55c9632
Sources EV-bd2d373178431380a8a3feae Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 388d76dd97a5e9fcea24423b287ffc38ec87a02dd2152c4b1cd7ef387588fcdc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232574|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_94a1433f4aecfe6e stable_project_id kproj_e07b9efaa55c9632 source_key 202609|232574|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 북다산분기 T/L 건설사업 project_name_detail 154kV 북다산분기 T/L 건설사업 region_summary_raw 경상북도 고령군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2023.03 환경/재해 영향평가 환경영향평가: 2023.07 ~ 2024.09 재해영향평가: 주민의견 수렴 지자체 공고 열람: 2023.05 ~ 2023.05 설명회·공청회: 2023.05 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 ※ 본 사업은 고령군 다산면 "월성일반산업단지" 개발에 따른 부하 공급능력 확보를 목표로 시행함 ○ 진행경과 - 21년 9월 : 제9차 장기송변전설비계획 사업 반영 - 23년 3월 : 입지확정 - 23년 7월 : 전원개발사업 실시계획 승인 신청 - 25년 9월 : 공사 계약 - 25년 10월 : 책임감리용역 계약, 공사 착공 및 중지 - 26년 5월 : 공사 재착공 예정(월성일반산업단지 조성 일정 및 부하예측 전망에 따라 공사일정 변동) 사업설계 설계용역: 기본설계: 2023.08 ~ 2023.08 실시설계: 2023.09 ~ 2025.02 설계담당자: [redacted] future_plan_redacted □ 향후계획 - 27년 6월 : 공사 가압. attachment_count 0 source_detail_sha256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232574|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_94a1433f4aecfe6e
Sources EV-a0f9dd48ae980cf1075933fb Evidence SHA-256 da7a8eae172ab014e2b6063e3c9f458d99dd36d16b1f842d188a4944b660ce02 행 SHA-256 2c793d69cca29e9b3a7b37e54f155cea9dd35aa26a6cf8e9e1defd45b4f0f2ad Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_e07b9efaa55c9632 stable_project_key prjtDef:232574:ESB project_definition 232574 first_region_code ESB manual_source_format false project_name 154kV 북다산분기 T/L 건설사업 project_name_list 154kV 북다산분기 T/L 건설사업 purpose 월성산업단지 등 신규부하 공급 project_region_detail 경상북도 고령군 project_period_raw 2023.05~2026.04 project_scale_raw ACSR 410㎟× B × 4C × 0.4㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_e07b9efaa55c9632
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e07b9efaa55c9632
Sources EV-bd2d373178431380a8a3feae Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 388d76dd97a5e9fcea24423b287ffc38ec87a02dd2152c4b1cd7ef387588fcdc Observations for this power asset History for this project