POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 19items · current page 1–19 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-872f21e40351726fa4df91eb
Detailed source fields Original source field Published value or condition stable_project_id kproj_2cada8450c261d97 stable_project_key prjtDef:232651:ESB project_definition 232651 first_region_code ESB manual_source_format false project_name 154kV 북남원분기T/L 건설사업 project_name_list 154kV 북남원분기 송전선로 건설사업 purpose 154KV 북남원분기 송전선로 건설사업 project_region_detail 전북특별자치도 남원시 project_period_raw 2024.07~2030.12 project_scale_raw PIAC 410 X 4C X 2KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_2cada8450c261d97
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2cada8450c261d97
Sources EV-872f21e40351726fa4df91eb Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0626c5d8aa5afbe38b609641fcb30ad36500cf1211fe3f076a415489f5884413 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232651|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_c491c16305e538e8 stable_project_id kproj_2cada8450c261d97 source_key 202609|232651|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북남원분기 송전선로 건설사업 project_name_detail 154kV 북남원분기T/L 건설사업 region_summary_raw 전북특별자치도 남원시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 2024.07 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [진행경과] □ '23.05 : 제10차 장기 송변전설비계획 신규 반영 □ '24.07 : 전력영향평가 용역 착수 □ '24.11 : 지자체 및 사매면 이장단 대상 사업설명회 시행 완료 □ '24.12 : 입지선정위원회 위원 추천 요청(남원시청) □ '25.03 : 입지선정위원회 구성완료 □ '25.05 : 주민대상 사업설명 시행(6개 마을 및 발전협의회) □ '25.06 : 사매면 이장단 및 발전협의회 대상 사업설명시행 □ '25.07 : 남원시장 대상 사업설명시행 □ '25.08 : 남원시 기원지원과 협의 □ '25.09 : 사매면(지자체,주민) 대상 사업설명 및 사업추진경과 공유 □ '25.10 : 강성민원(양계장 주인) 개별면담시행, 혼불문학제 지원, 남원시청 기업정책과장 대상 변전소 입지 관련 협의 □ '25.11 : 사업 필요성 자료 보충 후 남원시청 부시장 협의 추진 □ '26.01 : 변전소 산단 內 유치 관련 남원시장 보고결과(기업정책과→남원시장) 공유 ○ 산단 內 반영 가능 입장, 정확한 위치는 선거후 구체화 협의예정 future_plan_redacted □ 향후계획 [진행경과] □ '23.05 : 제10차 장기 송변전설비계획 신규 반영 □ '24.07 : 전력영향평가 용역 착수 □ '24.11 : 지자체 및 사매면 이장단 대상 사업설명회 시행 완료 □ '24.12 : 입지선정위원회 위원 추천 요청(남원시청) □ '25.03 : 입지선정위원회 구성완료 □ '25.05 : 주민대상 사업설명 시행(6개 마을 및 발전협의회) □ '25.06 : 사매면 이장단 및 발전협의회 대상 사업설명시행 □ '25.07 : 남원시장 대상 사업설명시행 □ '25.08 : 남원시 기원지원과 협의 □ '25.09 : 사매면(지자체,주민) 대상 사업설명 및 사업추진경과 공유 □ '25.10 : 강성민원(양계장 주인) 개별면담시행, 혼불문학제 지원, 남원시청 기업정책과장 대상 변전소 입지 관련 협의 □ '25.11 : 사업 필요성 자료 보충 후 남원시청 부시장 협의 추진 □ '26.01 : 변전소 산단 內 유치 관련 남원시장 보고결과(기업정책과→남원시장) 공유 ○ 산단 內 반영 가능 입장, 정확한 위치는 선거후 구체화 협의예정 attachment_count 0 source_detail_sha256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232651|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c491c16305e538e8
Sources EV-7c73a4996d7f39570eb7e38c Evidence SHA-256 bf1a777d2f5dcbaf482435c265dfa1bcfa4fcb178154dcf3d7e1f592978d738a 행 SHA-256 94bfedc708d6a6aaed84d996c9b1b14467ec2f828008725b22b1d99846787478 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_2cada8450c261d97 stable_project_key prjtDef:232651:ESB project_definition 232651 first_region_code ESB manual_source_format false project_name 154kV 북남원분기T/L 건설사업 project_name_list 154kV 북남원분기 송전선로 건설사업 purpose 154KV 북남원분기 송전선로 건설사업 project_region_detail 전북특별자치도 남원시 project_period_raw 2024.07~2030.12 project_scale_raw PIAC 410 X 4C X 2KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_2cada8450c261d97
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2cada8450c261d97