Power assets and projects · KOR · kepco_planned

154kV 북김제분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-443f1a704ef7e7ab5d23a4e6
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_df2b7d12e53e8a8e
stable_project_keyprjtDef:232547:ESB
project_definition232547
first_region_codeESB
manual_source_formatfalse
project_name154kV 북김제분기T/L 건설사업
project_name_list154kV 북김제분기 송전선로 건설사업
purpose신재생E 연계력 확충
project_region_detail전북특별자치도 김제시
project_period_raw2018.07~2026.10
project_scale_rawPIAC 240㎟XSX4C,0.5KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_56cea1f9b57170d2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_df2b7d12e53e8a8e

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_df2b7d12e53e8a8e

Sources EV-443f1a704ef7e7ab5d23a4e6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 467ba174fb6616a3e2118c2e0d3449e1fca53c77953d168d00c302e210e38bd4
Source schedule candidates · KOR · kepco_planned

154kV 북김제분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232547|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56cea1f9b57170d2

Sources EV-33c18dd65b062d649bbecf22
Evidence SHA-256 007036e96a345e701e7b57da9326ffd5813063b486a34ff3bfd0d98e61de1ae4
행 SHA-256 ce60a4b09dfd08492c9bd2b1736ea06e449ff86ba5a4e598ef02e4b74e9c2977
Source schedule candidates · KOR · kepco_planned

154kV 북김제분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232547|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56cea1f9b57170d2

Sources EV-33c18dd65b062d649bbecf22
Evidence SHA-256 007036e96a345e701e7b57da9326ffd5813063b486a34ff3bfd0d98e61de1ae4
행 SHA-256 ce60a4b09dfd08492c9bd2b1736ea06e449ff86ba5a4e598ef02e4b74e9c2977
Source snapshots by date · KOR · kepco_planned

154kV 북김제분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_56cea1f9b57170d2
stable_project_idkproj_df2b7d12e53e8a8e
source_key202609|232547|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 북김제분기 송전선로 건설사업
project_name_detail154kV 북김제분기T/L 건설사업
region_summary_raw전북특별자치도 김제시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 신재생E 연계력 확충
Project region
  • 전북특별자치도 김제시
Project period
  • 2018.07~2026.10
사업 규모
  • PIAC 240㎟XSX4C,0.5KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2024.01 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2024.03~2024.04 경과지(부지) 확정: 2024.04
환경/재해 영향평가
  • 환경영향평가: 2024.06 ~ 2025.02 재해영향평가: 2024.06 ~ 2025.02
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[추진실적] □‘18.07 : 제8차 장기 송변전설비계획 사업반영 □‘24.03 : 입지선정실무위원회 구성 및 시행 □‘24.03 : 지장유무조회 요청(→김제시, 군부대) □‘24.04 : 입지확정위원회 구성 및 시행 □‘24.06 : 부지확정 보고 □‘24.07 : 사업시행계획 공고 및 열람, 주민설명회 시행 □‘24.09 : 실시계획 승인신청 [향후계획] □‘25.04 : 기본설계 □‘25.07 : 실시설계 □‘25.10 : 자재발주, 공사계약 □‘26.04 : 공사착공 □‘26.12 : 공사준공
future_plan_redacted□ 향후계획 [추진실적] □‘18.07 : 제8차 장기 송변전설비계획 사업반영 □‘24.03 : 입지선정실무위원회 구성 및 시행 □‘24.03 : 지장유무조회 요청(→김제시, 군부대) □‘24.04 : 입지확정위원회 구성 및 시행 □‘24.06 : 부지확정 보고 □‘24.07 : 사업시행계획 공고 및 열람, 주민설명회 시행 □‘24.09 : 실시계획 승인신청 [향후계획] □‘25.04 : 기본설계 □‘25.07 : 실시설계 □‘25.10 : 자재발주, 공사계약 □‘26.04 : 공사착공 □‘26.12 : 공사준공
attachment_count0
source_detail_sha256007036e96a345e701e7b57da9326ffd5813063b486a34ff3bfd0d98e61de1ae4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232547|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56cea1f9b57170d2

Sources EV-33c18dd65b062d649bbecf22
Evidence SHA-256 007036e96a345e701e7b57da9326ffd5813063b486a34ff3bfd0d98e61de1ae4
행 SHA-256 ce60a4b09dfd08492c9bd2b1736ea06e449ff86ba5a4e598ef02e4b74e9c2977
Source snapshots by date · KOR · kepco_planned

154kV 북김제분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_df2b7d12e53e8a8e
stable_project_keyprjtDef:232547:ESB
project_definition232547
first_region_codeESB
manual_source_formatfalse
project_name154kV 북김제분기T/L 건설사업
project_name_list154kV 북김제분기 송전선로 건설사업
purpose신재생E 연계력 확충
project_region_detail전북특별자치도 김제시
project_period_raw2018.07~2026.10
project_scale_rawPIAC 240㎟XSX4C,0.5KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_56cea1f9b57170d2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_df2b7d12e53e8a8e

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_df2b7d12e53e8a8e

Sources EV-443f1a704ef7e7ab5d23a4e6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 467ba174fb6616a3e2118c2e0d3449e1fca53c77953d168d00c302e210e38bd4

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel