POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 201–300 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_4d58200ac1de4f07 stable_project_id kproj_8238322dc43783b4 source_key 202609|234771|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV (남양주-왕숙) 전력구 건설사업 project_name_detail 154kV (남양주-왕숙) 전력구 건설사업 region_summary_raw 경기도 남양주시등 1 지역 equipment_type_raw 전력구 headquarters_raw 경인건설본부 office_raw 직할 section_fields Project region Namyangju City, Gyeonggi Province 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] future_plan_redacted line □ 향후계획 기본설계 진 attachment_count 0 source_detail_sha256 3c337554bc1f42855585d2c226126a34374f722d51a29584d9fccb39a1baf9f1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234771|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d58200ac1de4f07
Sources EV-d80799ae32896c8ffc86fc47 Evidence SHA-256 3c337554bc1f42855585d2c226126a34374f722d51a29584d9fccb39a1baf9f1 행 SHA-256 ae21feac192cc5889403f9e9562292663e88a19ca56d97459625c735517c03bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_8238322dc43783b4 stable_project_key prjtDef:234771:ESB project_definition 234771 first_region_code ESB manual_source_format false project_name 154kV (남양주-왕숙) 전력구 건설사업 project_name_list 154kV (남양주-왕숙) 전력구 건설사업 purpose 남양주-왕숙 부하 해소 project_region_detail Namyangju City, Gyeonggi Province project_period_raw 2024.02~2028.06 project_scale_raw 전력구 1,336M responsible_office_raw 경인건설본부/직할 equipment_type 전력구 headquarters 경인건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_8238322dc43783b4
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_8238322dc43783b4
Sources EV-5886498ac5769491354d5e7b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 bf5579c879aa6c47b076ffe03734f27fb99f14e798f14a9297521fe1e0f1d8e1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7b15b2bcf129ab26701cc517
Detailed source fields Original source field Published value or condition stable_project_id kproj_70291f3ae8537aef stable_project_key prjtDef:231726:ESB project_definition 231726 first_region_code ESB manual_source_format false project_name 154kV 가능S/S 건설사업 project_name_list 154kV 가능변전소 건설사업 purpose 인근 변전소 공급능력 포화 및 부하분담 project_region_detail Uijeongbu, Gyeonggi Province project_period_raw 2025.05~2031.04 project_scale_raw 154KV M.TR 60MVA X 2BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_70291f3ae8537aef
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_70291f3ae8537aef
Sources EV-7b15b2bcf129ab26701cc517 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9c6e852e33d64c29ef6c279d6e4d30232344ac949c53e4887271874b1189861c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231726|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_21ece8c8b0273752
Sources EV-f8ebeda8f64c4b6a46e981aa Evidence SHA-256 f8514f682fd2d79081522f51cce4c8ea7af5335f2de6adf5c1735c487fbd68e1 행 SHA-256 ee1e8a164b97563af59b235ebbc3f7fc82fc657f5b8fb39009e55bbe97d0bece Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231726|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_21ece8c8b0273752
Sources EV-f8ebeda8f64c4b6a46e981aa Evidence SHA-256 f8514f682fd2d79081522f51cce4c8ea7af5335f2de6adf5c1735c487fbd68e1 행 SHA-256 ee1e8a164b97563af59b235ebbc3f7fc82fc657f5b8fb39009e55bbe97d0bece Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_21ece8c8b0273752 stable_project_id kproj_70291f3ae8537aef source_key 202609|231726|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 가능변전소 건설사업 project_name_detail 154kV 가능S/S 건설사업 region_summary_raw 경기도 의정부시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 직할 section_fields Project region Uijeongbu, Gyeonggi Province 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: □ '25.05 : 제11차 장기송변전설비계획 반영 □ '29.05 : 토건공사 착공(예정) □ '31.04 : 변전소 최초 가압(예정) (※ 상기 일정은 변동될 수 있음) future_plan_redacted □ 향후계획 □ '25.05 : 제11차 장기송변전설비계획 반영 □ '29.05 : 토건공사 착공(예정) □ '31.04 : 변전소 최초 가압(예정) (※ 상기 일정은 변동될 수 있음) attachment_count 0 source_detail_sha256 f8514f682fd2d79081522f51cce4c8ea7af5335f2de6adf5c1735c487fbd68e1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231726|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_21ece8c8b0273752
Sources EV-f8ebeda8f64c4b6a46e981aa Evidence SHA-256 f8514f682fd2d79081522f51cce4c8ea7af5335f2de6adf5c1735c487fbd68e1 행 SHA-256 ee1e8a164b97563af59b235ebbc3f7fc82fc657f5b8fb39009e55bbe97d0bece Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_70291f3ae8537aef stable_project_key prjtDef:231726:ESB project_definition 231726 first_region_code ESB manual_source_format false project_name 154kV 가능S/S 건설사업 project_name_list 154kV 가능변전소 건설사업 purpose 인근 변전소 공급능력 포화 및 부하분담 project_region_detail Uijeongbu, Gyeonggi Province project_period_raw 2025.05~2031.04 project_scale_raw 154KV M.TR 60MVA X 2BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_70291f3ae8537aef
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_70291f3ae8537aef
Sources EV-7b15b2bcf129ab26701cc517 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9c6e852e33d64c29ef6c279d6e4d30232344ac949c53e4887271874b1189861c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-ab978c9d5b102f1074194618
Detailed source fields Original source field Published value or condition stable_project_id kproj_6d2e8f78d9fb56e8 stable_project_key prjtDef:231521:ESB project_definition 231521 first_region_code ESB manual_source_format false project_name 154kV 강일#2S/S 건설사업 project_name_list 154kV 강일#2(가칭)S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 서울특별시 강동구 project_period_raw project_scale_raw M.TR 60MVAX2BANK(최종 4BANK) responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_6d2e8f78d9fb56e8
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_6d2e8f78d9fb56e8
Sources EV-ab978c9d5b102f1074194618 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 78f8075a5d25c3ff9e1d82babf9205ee821fe6a8d5bb681e865a3cd0c9a7df1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_1cd7684ed622cb34 stable_project_id kproj_6d2e8f78d9fb56e8 source_key 202609|231521|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 강일#2(가칭)S/S 건설사업 project_name_detail 154kV 강일#2S/S 건설사업 region_summary_raw 서울특별시 강동구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 M.TR 60MVAX2BANK(최종 4BANK) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: □ 추진 계획 ○ ‘26.08 : 부지확정 완료(대체부지 이전 검토중) ○ ‘28.05 : 용지매수 완료 ○ ‘29.05 : 착공(토건/변전) ○ ‘31.04 : 변전소 가압 future_plan_redacted □ 향후계획 □ 추진 계획 ○ ‘26.08 : 부지확정 완료(대체부지 이전 검토중) ○ ‘28.05 : 용지매수 완료 ○ ‘29.05 : 착공(토건/변전) ○ ‘31.04 : 변전소 가압 attachment_count 0 source_detail_sha256 5badbcc8d4ebd14ef2f8d1a38b6b14ce00c8d2aa94dfc23ab0256dcf3aaad2ea first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231521|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1cd7684ed622cb34
Sources EV-7e7dd392d637e250191a283d Evidence SHA-256 5badbcc8d4ebd14ef2f8d1a38b6b14ce00c8d2aa94dfc23ab0256dcf3aaad2ea 행 SHA-256 6811c3b98ee6dfed019689204897ccfe61cf19c613fddf995a6dd7a996d21611 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_6d2e8f78d9fb56e8 stable_project_key prjtDef:231521:ESB project_definition 231521 first_region_code ESB manual_source_format false project_name 154kV 강일#2S/S 건설사업 project_name_list 154kV 강일#2(가칭)S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 서울특별시 강동구 project_period_raw project_scale_raw M.TR 60MVAX2BANK(최종 4BANK) responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_6d2e8f78d9fb56e8
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_6d2e8f78d9fb56e8
Sources EV-ab978c9d5b102f1074194618 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 78f8075a5d25c3ff9e1d82babf9205ee821fe6a8d5bb681e865a3cd0c9a7df1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b30084fe87916496e2d1f060
Detailed source fields Original source field Published value or condition stable_project_id kproj_43bf32dabf51f84b stable_project_key prjtDef:231642:ESB project_definition 231642 first_region_code ESB manual_source_format false project_name 154kV 거창#2S/S 건설사업 project_name_list 154kV 거창#2S/S 건설사업 purpose 거창지역 신재생E 접속용량 확보 project_region_detail 경상남도 거창군 project_period_raw 2022.01~2030.12 project_scale_raw 154KV M.TR 60MVA × 2BANK(최종 4BANK) responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_43bf32dabf51f84b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_43bf32dabf51f84b
Sources EV-b30084fe87916496e2d1f060 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6894ad7c76d300ecc28f0a647697a333ae7f35089f2a6f4ebd89b0d52fdf1359 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231642|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ebc2081b4f140c38
Sources EV-d1199d51bb0c11c3f1ca1f80 Evidence SHA-256 d090bdc8cea582567a2d089378b601025024975d17250ee9b89894b19d89cb13 행 SHA-256 0f68e7721880d56ffc2200014cccc78b5c757445f88e0695083740ba0973114b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231642|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ebc2081b4f140c38
Sources EV-d1199d51bb0c11c3f1ca1f80 Evidence SHA-256 d090bdc8cea582567a2d089378b601025024975d17250ee9b89894b19d89cb13 행 SHA-256 0f68e7721880d56ffc2200014cccc78b5c757445f88e0695083740ba0973114b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_ebc2081b4f140c38 stable_project_id kproj_43bf32dabf51f84b source_key 202609|231642|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 거창#2S/S 건설사업 project_name_detail 154kV 거창#2S/S 건설사업 region_summary_raw 경상남도 거창군등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 154KV M.TR 60MVA × 2BANK(최종 4BANK) 입지선정 전력입지영향평가 용역 착수: 2024.09 입지선정위원회 구성시기: 2025.07 참여 위원 수 : 15 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] [진행경과] □ '23.05 : 제10차 장기송변전설비계획 확정 및 알림(준공목표 : ’30.12) □ '24.09 : 전력영향평가 용역 착수((주)진화기술공사) □ '24.10 : 전력영향평가 용역 착수회의 시행 □ '25.02 : 변전소 및 송전선로 관련 지자체(거창군청) 사업설명 □ '25.04 : 지역주민(이장단) 사업설명회 시행(남하면, 가조면) □ '25.04 : 입지선정위원회 위원 추천 요청 공문 발송(→거창군청) □ '25.05 : 입지선정위원회 위원 추천관련 지자체 업무협의 □ '25.07 : 입지선정위원회 구성 및 1차 회의 시행(위원장 선출, 입선위 운영기준 수립) □ '25.09 : 입지선정위원회 2차회의 시행 및 결과보고(선호도 조사 완료) □ '25.11 : 입지선정위원회 3차회의 시행 및 결과보고(최적 경과대역 도출) □ '25.12 : 입지선정위원회 4차회의 시행및 결과보고(후보부지 압축 5개소→2개소) □ '26.02 : 지자체 및 군부대 지장유무 조회 및 결과회신 □ '26.03 : 최적부지 인근 주민대상 사업설명회 시행(남하면, 가조면) □ '26.03 : 입지선정위원회 5차회의 시행 및 결과보고(최적부지 확정) ※ 변전소 최적부지 : 경남 거창군 남하면 둔마리 1206번지 일원 □ '26.04 : 변전소 최적부지 토지주 개발사업 시행에 따른 부지 변경 ※ 변전소 최적부지 : 경남 거창군 남하면 둔마리 산 97번지 일원 □ '26.05 : 변전소 부지현황 측량 및 소규모 환경영향평가 착수 [향후계획] □ '27.06 : 전원개발사업 실시계획승 신청(→기후부) □ '28.01 : 변전소 용지매수 완료 □ '28.11 : 변전공사 실시설계 및 공사계약 □ '29.01 : 토건공사 착공 □ '29.04 : 변전공사 착공 □ '30.12 : 변전소 가압 및 준공 future_plan_redacted □ 향후계획 [진행경과] □ '23.05 : 제10차 장기송변전설비계획 확정 및 알림(준공목표 : ’30.12) □ '24.09 : 전력영향평가 용역 착수((주)진화기술공사) □ '24.10 : 전력영향평가 용역 착수회의 시행 □ '25.02 : 변전소 및 송전선로 관련 지자체(거창군청) 사업설명 □ '25.04 : 지역주민(이장단) 사업설명회 시행(남하면, 가조면) □ '25.04 : 입지선정위원회 위원 추천 요청 공문 발송(→거창군청) □ '25.05 : 입지선정위원회 위원 추천관련 지자체 업무협의 □ '25.07 : 입지선정위원회 구성 및 1차 회의 시행(위원장 선출, 입선위 운영기준 수립) □ '25.09 : 입지선정위원회 2차회의 시행 및 결과보고(선호도 조사 완료) □ '25.11 : 입지선정위원회 3차회의 시행 및 결과보고(최적 경과대역 도출) □ '25.12 : 입지선정위원회 4차회의 시행및 결과보고(후보부지 압축 5개소→2개소) □ '26.02 : 지자체 및 군부대 지장유무 조회 및 결과회신 □ '26.03 : 최적부지 인근 주민대상 사업설명회 시행(남하면, 가조면) □ '26.03 : 입지선정위원회 5차회의 시행 및 결과보고(최적부지 확정) ※ 변전소 최적부지 : 경남 거창군 남하면 둔마리 1206번지 일원 □ '26.04 : 변전소 최적부지 토지주 개발사업 시행에 따른 부지 변경 ※ 변전소 최적부지 : 경남 거창군 남하면 둔마리 산 97번지 일원 □ '26.05 : 변전소 부지현황 측량 및 소규모 환경영향평가 착수 [향후계획] □ '27.06 : 전원개발사업 실시계획승 신청(→기후부) □ '28.01 : 변전소 용지매수 완료 □ '28.11 : 변전공사 실시설계 및 공사계약 □ '29.01 : 토건공사 착공 □ '29.04 : 변전공사 착공 □ '30.12 : 변전소 가압 및 준공 attachment_count 0 source_detail_sha256 d090bdc8cea582567a2d089378b601025024975d17250ee9b89894b19d89cb13 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231642|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ebc2081b4f140c38
Sources EV-d1199d51bb0c11c3f1ca1f80 Evidence SHA-256 d090bdc8cea582567a2d089378b601025024975d17250ee9b89894b19d89cb13 행 SHA-256 0f68e7721880d56ffc2200014cccc78b5c757445f88e0695083740ba0973114b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_43bf32dabf51f84b stable_project_key prjtDef:231642:ESB project_definition 231642 first_region_code ESB manual_source_format false project_name 154kV 거창#2S/S 건설사업 project_name_list 154kV 거창#2S/S 건설사업 purpose 거창지역 신재생E 접속용량 확보 project_region_detail 경상남도 거창군 project_period_raw 2022.01~2030.12 project_scale_raw 154KV M.TR 60MVA × 2BANK(최종 4BANK) responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_43bf32dabf51f84b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_43bf32dabf51f84b
Sources EV-b30084fe87916496e2d1f060 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6894ad7c76d300ecc28f0a647697a333ae7f35089f2a6f4ebd89b0d52fdf1359 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-71f26849ce89934bbda75437
Detailed source fields Original source field Published value or condition stable_project_id kproj_01b051ea42cc6707 stable_project_key prjtDef:232621:ESB project_definition 232621 first_region_code ESB manual_source_format false project_name 154kV 거창#2분기T/L 건설사업 project_name_list 154kV 거창#2분기송전선로 건설사업 purpose 거창 신재생E 연계용량 초과 해소를 위한 계통연계 project_region_detail 경상남도 거창군 project_period_raw 2024.08~2031.12 project_scale_raw ACSR 330×S×4C×5.8KM responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_01b051ea42cc6707
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_01b051ea42cc6707
Sources EV-71f26849ce89934bbda75437 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 818880e05ac91a71ddb7cf3c66ce20d3a4e04bbbbe69223555a070c96d46714a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2027-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-08 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b9b8663eeccc8bb9 stable_project_id kproj_01b051ea42cc6707 source_key 202609|232621|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 거창#2분기송전선로 건설사업 project_name_detail 154kV 거창#2분기T/L 건설사업 region_summary_raw 경상남도 거창군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project purpose 거창 신재생E 연계용량 초과 해소를 위한 계통연계 입지선정 전력입지영향평가 용역 착수: 2024.09 입지선정위원회 구성시기: 2025.07 참여 위원 수 : 15 지장유무 조회: 2026.01~2026.02 경과지(부지) 확정: 2026.04 환경/재해 영향평가 환경영향평가: 2026.04 ~ 재해영향평가: 2026.04 ~ 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 line ㅇ '25.07 : 입지선정위원 구성 완료 ㅇ '25.07 : 입지선정위원회 1차 회의 시행 ㅇ '25.09 : 입지선정위원회 2차 회의 시행 ㅇ '25.11 : 입지선정위원회 3차 회의 시행 ㅇ '25.12 : 입지선정위원회 4차 회의 시행 ㅇ '26.03 : 입지선정위원회 5차 회의 시행(최적 경과지 선정) ㅇ '26.04 : 입지확정위원회 시 □ 진행경과 ㅇ '23.05 : 제10차 장기송변전 설비계획 반영 ㅇ '24.07 : 전력영향평가 용역 계약 의뢰(거창#2S/S 포함) ㅇ '24.09 : 전력영향평가 용역 착수 ㅇ '25.04 : 입지선정위원회 위원 추천 요청(→ 거창군) ㅇ '25.07 : 입지선정위원 구성 완료 ㅇ '25.07 : 입지선정위원회 1차 회의 시행 ㅇ '25.09 : 입지선정위원회 2차 회의 시행 ㅇ '25.11 : 입지선정위원회 3차 회의 시행 ㅇ '25.12 : 입지선정위원회 4차 회의 시행 ㅇ '26.03 : 입지선정위원회 5차 회의 시행(최적 경과지 선정) ㅇ '26.04 : 입지확정위원회 시행 ㅇ '26.06 : 변전소 부지 및 송전선로 경과지 설계 측량 ㅇ '26.06 : 환경영향평가 및 재해영향평가 용역 중지 사유: 용역(설계 및 측량) 미완료 □ 향후계획 ㅇ '27.05 : 실시계획 승인신청 future_plan_redacted □ 향후계획 □ 진행경과 ㅇ '23.05 : 제10차 장기송변전 설비계획 반영 ㅇ '24.07 : 전력영향평가 용역 계약 의뢰(거창#2S/S 포함) ㅇ '24.09 : 전력영향평가 용역 착수 ㅇ '25.04 : 입지선정위원회 위원 추천 요청(→ 거창군) ㅇ '25.07 : 입지선정위원 구성 완료 ㅇ '25.07 : 입지선정위원회 1차 회의 시행 ㅇ '25.09 : 입지선정위원회 2차 회의 시행 ㅇ '25.11 : 입지선정위원회 3차 회의 시행 ㅇ '25.12 : 입지선정위원회 4차 회의 시행 ㅇ '26.03 : 입지선정위원회 5차 회의 시행(최적 경과지 선정) ㅇ '26.04 : 입지확정위원회 시행 ㅇ '26.06 : 변전소 부지 및 송전선로 경과지 설계 측량 ㅇ '26.06 : 환경영향평가 및 재해영향평가 용역 중지 사유: 용역(설계 및 측량) 미완료 □ 향후계획 ㅇ '27.05 : 실시계획 승인신청 attachment_count 0 source_detail_sha256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232621|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b9b8663eeccc8bb9
Sources EV-fd989400dee9d817b03a3528 Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84 행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_01b051ea42cc6707 stable_project_key prjtDef:232621:ESB project_definition 232621 first_region_code ESB manual_source_format false project_name 154kV 거창#2분기T/L 건설사업 project_name_list 154kV 거창#2분기송전선로 건설사업 purpose 거창 신재생E 연계용량 초과 해소를 위한 계통연계 project_region_detail 경상남도 거창군 project_period_raw 2024.08~2031.12 project_scale_raw ACSR 330×S×4C×5.8KM responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_01b051ea42cc6707
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_01b051ea42cc6707
Sources EV-71f26849ce89934bbda75437 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 818880e05ac91a71ddb7cf3c66ce20d3a4e04bbbbe69223555a070c96d46714a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-5ed5a320791bcd6cc7cb6ca2
Detailed source fields Original source field Published value or condition stable_project_id kproj_89d819f8d107ace9 stable_project_key prjtDef:234623:ESB project_definition 234623 first_region_code ESB manual_source_format false project_name 154kV 걸포(고천)분기 전력구 건설사업 project_name_list 154kV 걸포(고천)분기 전력구 건설사업 purpose 김포 동남부지역 전력공급능력확보 project_region_detail 경기도 김포시 project_period_raw 2024.07~2030.06 project_scale_raw SHIELD TBM 1,025M, 관로 3,029M responsible_office_raw 경인건설본부/직할 equipment_type 전력구 headquarters 경인건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_89d819f8d107ace9
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_89d819f8d107ace9
Sources EV-5ed5a320791bcd6cc7cb6ca2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f09bc16243ae5597e65398923f74315519fa0c198899d7ee35525cb8ad6a4338 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2024-11-13 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12-18 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03-25 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06-09 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_180d258a8e99367f stable_project_id kproj_89d819f8d107ace9 source_key 202609|234623|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 걸포(고천)분기 전력구 건설사업 project_name_detail 154kV 걸포(고천)분기 전력구 건설사업 region_summary_raw 경기도 김포시등 1 지역 equipment_type_raw 전력구 headquarters_raw 경인건설본부 office_raw 직할 section_fields 사업 규모 SHIELD TBM 1,025M, 관로 3,029M 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2024.11 ~ 2026.05 기본설계: 2024.11 ~ 2025.10 실시설계: 2025.10 ~ 2026.03 설계담당자: [redacted] - ‘21. 5.12 : 현장 답사분석 및 결과보고(→송변전건설처) - ‘21. 6. 3 : 기본계획 수립 및 본 선로 관련 내용 알림 계통계획처 주관 T/F에서 최종 선로 시행방안 결정 시까지 설계용역 발주 보류(고객사인 스마일게이트의 직접시공 여부 결정) - ‘22. 5. : (고객) "고객 先시공, 한전 後인수" 방식 건설협업 요청 - `23. 5.31 : (김포시) 전자파 등 민원사유로 데이터센터사업 산단 제외 - `23. 8. : (한전) 지자체 미협조에 따른 협약 취소 공문 송부(→스마일) - `23.12. : (고객) 국회의원 선거 이후로 건설협약취소 결정 연기 요청 - `24. 4.17 : (고객) 건설협약 결정 여부 24년 2분기로 연기 요청 - ‘24. 4.23 : (계통계획처) 고객-한전 건설협업 관련 회의 시행 내용 : 김포시의 데이터센터 부정적의견 + 산단 전력공급 필요 - ‘24. 5. 9 : 계통(정책)-412 「고객-한전 건설협업 추진 검토결과 알림」 내용 : 걸포분기 전력구공사 설계용역 발주 등 사업 착수 - ’24. 7.25 : 걸포분기 전력구공사 설계용역 시행 - ‘24.11.13 : 걸포분기 전력구공사 설계용역 착수 - ‘25. 7.16 : 걸포분기 전력구공사 기본설계심의 시행 - ’25.12.18 : 걸포분기 전력구공사 실시설계심의 시행 - ‘26.03.25 : 걸포분기 전력구공사 시행품의 - ’26.06.09 : 걸포분기 전력구공사 입찰공고 시행('26.10 착공예정) future_plan_redacted □ 향후계획 - ‘21. 5.12 : 현장 답사분석 및 결과보고(→송변전건설처) - ‘21. 6. 3 : 기본계획 수립 및 본 선로 관련 내용 알림 계통계획처 주관 T/F에서 최종 선로 시행방안 결정 시까지 설계용역 발주 보류(고객사인 스마일게이트의 직접시공 여부 결정) - ‘22. 5. : (고객) "고객 先시공, 한전 後인수" 방식 건설협업 요청 - `23. 5.31 : (김포시) 전자파 등 민원사유로 데이터센터사업 산단 제외 - `23. 8. : (한전) 지자체 미협조에 따른 협약 취소 공문 송부(→스마일) - `23.12. : (고객) 국회의원 선거 이후로 건설협약취소 결정 연기 요청 - `24. 4.17 : (고객) 건설협약 결정 여부 24년 2분기로 연기 요청 - ‘24. 4.23 : (계통계획처) 고객-한전 건설협업 관련 회의 시행 내용 : 김포시의 데이터센터 부정적의견 + 산단 전력공급 필요 - ‘24. 5. 9 : 계통(정책)-412 「고객-한전 건설협업 추진 검토결과 알림」 내용 : 걸포분기 전력구공사 설계용역 발주 등 사업 착수 - ’24. 7.25 : 걸포분기 전력구공사 설계용역 시행 - ‘24.11.13 : 걸포분기 전력구공사 설계용역 착수 - ‘25. 7.16 : 걸포분기 전력구공사 기본설계심의 시행 - ’25.12.18 : 걸포분기 전력구공사 실시설계심의 시행 - ‘26.03.25 : 걸포분기 전력구공사 시행품의 - ’26.06.09 : 걸포분기 전력구공사 입찰공고 시행('26.10 착공예정) attachment_count 0 source_detail_sha256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234623|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_180d258a8e99367f
Sources EV-80ede9275a5a16a35074d372 Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67 행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_89d819f8d107ace9 stable_project_key prjtDef:234623:ESB project_definition 234623 first_region_code ESB manual_source_format false project_name 154kV 걸포(고천)분기 전력구 건설사업 project_name_list 154kV 걸포(고천)분기 전력구 건설사업 purpose 김포 동남부지역 전력공급능력확보 project_region_detail 경기도 김포시 project_period_raw 2024.07~2030.06 project_scale_raw SHIELD TBM 1,025M, 관로 3,029M responsible_office_raw 경인건설본부/직할 equipment_type 전력구 headquarters 경인건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_89d819f8d107ace9
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_89d819f8d107ace9
Sources EV-5ed5a320791bcd6cc7cb6ca2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f09bc16243ae5597e65398923f74315519fa0c198899d7ee35525cb8ad6a4338 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b43f392a3031ec90d066c19a
Detailed source fields Original source field Published value or condition stable_project_id kproj_878373e0b96f5a1e stable_project_key prjtDef:231487:ESB project_definition 231487 first_region_code ESB manual_source_format false project_name 154kV 걸포S/S 건설사업 project_name_list 154,000V 걸포변전소 건설사업 purpose 한강시네폴리스 산단 전력공급 및 인근S/S project_region_detail 경기도 김포시 project_period_raw 2019.12~2029.12 project_scale_raw M.TR 2BANK, 170KV GIS 10CCT, 23KV GIS 11CCT(4D/L) responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_878373e0b96f5a1e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_878373e0b96f5a1e
Sources EV-b43f392a3031ec90d066c19a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 20f9b37b382de962cd64d75a8998a526db727b31ddbd12283c975d7d946145a7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2019-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9780322d9d75a79c
Sources EV-f20c32f97d11ad4e0d70d77e Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918 행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9780322d9d75a79c
Sources EV-f20c32f97d11ad4e0d70d77e Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918 행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2029-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9780322d9d75a79c
Sources EV-f20c32f97d11ad4e0d70d77e Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918 행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2029-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9780322d9d75a79c
Sources EV-f20c32f97d11ad4e0d70d77e Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918 행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9780322d9d75a79c
Sources EV-f20c32f97d11ad4e0d70d77e Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918 행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2020-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9780322d9d75a79c
Sources EV-f20c32f97d11ad4e0d70d77e Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918 행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2028-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9780322d9d75a79c
Sources EV-f20c32f97d11ad4e0d70d77e Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918 행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9780322d9d75a79c
Sources EV-f20c32f97d11ad4e0d70d77e Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918 행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_9780322d9d75a79c stable_project_id kproj_878373e0b96f5a1e source_key 202609|231487|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154,000V 걸포변전소 건설사업 project_name_detail 154kV 걸포S/S 건설사업 region_summary_raw 경기도 김포시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 M.TR 2BANK, 170KV GIS 10CCT, 23KV GIS 11CCT(4D/L) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.04 참여 위원 수 : 경과지(부지) 확정: 2020.08 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 ○ 산업단지 내 입지로, 한전 자체 입지선정위원회 구성 및 확정함. 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] ○ '26. 하반기 : 실시계획(변경) 고시 ○ '28.04 : 변전공사 착공 ○ '29.12 : 변전소 준공 및 가압 future_plan_redacted □ 향후계획 ○ '26. 하반기 : 실시계획(변경) 고시 ○ '28.04 : 변전공사 착공 ○ '29.12 : 변전소 준공 및 가압 attachment_count 0 source_detail_sha256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231487|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9780322d9d75a79c
Sources EV-f20c32f97d11ad4e0d70d77e Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918 행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_878373e0b96f5a1e stable_project_key prjtDef:231487:ESB project_definition 231487 first_region_code ESB manual_source_format false project_name 154kV 걸포S/S 건설사업 project_name_list 154,000V 걸포변전소 건설사업 purpose 한강시네폴리스 산단 전력공급 및 인근S/S project_region_detail 경기도 김포시 project_period_raw 2019.12~2029.12 project_scale_raw M.TR 2BANK, 170KV GIS 10CCT, 23KV GIS 11CCT(4D/L) responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_878373e0b96f5a1e
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_878373e0b96f5a1e
Sources EV-b43f392a3031ec90d066c19a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 20f9b37b382de962cd64d75a8998a526db727b31ddbd12283c975d7d946145a7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-dd4980c18ea491825887a052
Detailed source fields Original source field Published value or condition stable_project_id kproj_fd287a7da6e8212c stable_project_key prjtDef:233622:ESB project_definition 233622 first_region_code ESB manual_source_format false project_name 154kV 걸포분기 지중T/L 건설사업 project_name_list 154kV 걸포분기 지중T/L 건설사업 purpose 김포 인근지역 전력계통 보강 project_region_detail 경기도 김포시 project_period_raw 2028.10~2030.06 project_scale_raw 154KV XLPE 2,000,2C - 3.7KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_fd287a7da6e8212c
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fd287a7da6e8212c
Sources EV-dd4980c18ea491825887a052 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4da94b2f11ae93a6aa9b468e48eacd9181ea3132e24c7c4a1313aa28d4f7ab68 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233622|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9792c9309ffcbd67
Sources EV-3dd9ab42b96dc810fb5b3536 Evidence SHA-256 702e663f2b0e3694958c0a405b1cbfd9dbc5866d24f66dcf2a9087ae4be3d2ea 행 SHA-256 4675c7b328983902efcb0fc7e646ce3a9816549cfa06892fffa9e01b5511cb7d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2028-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233622|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9792c9309ffcbd67
Sources EV-3dd9ab42b96dc810fb5b3536 Evidence SHA-256 702e663f2b0e3694958c0a405b1cbfd9dbc5866d24f66dcf2a9087ae4be3d2ea 행 SHA-256 4675c7b328983902efcb0fc7e646ce3a9816549cfa06892fffa9e01b5511cb7d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_9792c9309ffcbd67 stable_project_id kproj_fd287a7da6e8212c source_key 202609|233622|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 걸포분기 지중T/L 건설사업 project_name_detail 154kV 걸포분기 지중T/L 건설사업 region_summary_raw 경기도 김포시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV XLPE 2,000,2C - 3.7KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 기본설계자료 수집 attachment_count 0 source_detail_sha256 702e663f2b0e3694958c0a405b1cbfd9dbc5866d24f66dcf2a9087ae4be3d2ea first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233622|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9792c9309ffcbd67
Sources EV-3dd9ab42b96dc810fb5b3536 Evidence SHA-256 702e663f2b0e3694958c0a405b1cbfd9dbc5866d24f66dcf2a9087ae4be3d2ea 행 SHA-256 4675c7b328983902efcb0fc7e646ce3a9816549cfa06892fffa9e01b5511cb7d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_fd287a7da6e8212c stable_project_key prjtDef:233622:ESB project_definition 233622 first_region_code ESB manual_source_format false project_name 154kV 걸포분기 지중T/L 건설사업 project_name_list 154kV 걸포분기 지중T/L 건설사업 purpose 김포 인근지역 전력계통 보강 project_region_detail 경기도 김포시 project_period_raw 2028.10~2030.06 project_scale_raw 154KV XLPE 2,000,2C - 3.7KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_fd287a7da6e8212c
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fd287a7da6e8212c
Sources EV-dd4980c18ea491825887a052 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4da94b2f11ae93a6aa9b468e48eacd9181ea3132e24c7c4a1313aa28d4f7ab68 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-d642fe2af23372106fdf669c
Detailed source fields Original source field Published value or condition stable_project_id kproj_f7772b1f3e05c7df stable_project_key prjtDef:231523:ESB project_definition 231523 first_region_code ESB manual_source_format false project_name 154kV 검암S/S 건설사업 project_name_list 154kV 검암S/S 건설사업 purpose 검암역세권 개발 및 인천서구지역 부하부담 project_region_detail 인천광역시 서해구 project_period_raw project_scale_raw 154KV M.TR(60MVA) × 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_f7772b1f3e05c7df
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f7772b1f3e05c7df
Sources EV-d642fe2af23372106fdf669c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b839b1abbd4ba2e76e5147dae0614ef4f4b4d3c600ae87f737257883c652d715 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2029-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231523|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ce76778eed64e0a3
Sources EV-da5b45299c558670ceedc321 Evidence SHA-256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0 행 SHA-256 425d8210d5bfe290a332b713fbc1251e8979031e7d98184583f4845569bf417a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2027-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231523|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ce76778eed64e0a3
Sources EV-da5b45299c558670ceedc321 Evidence SHA-256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0 행 SHA-256 425d8210d5bfe290a332b713fbc1251e8979031e7d98184583f4845569bf417a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231523|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ce76778eed64e0a3
Sources EV-da5b45299c558670ceedc321 Evidence SHA-256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0 행 SHA-256 425d8210d5bfe290a332b713fbc1251e8979031e7d98184583f4845569bf417a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231523|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ce76778eed64e0a3
Sources EV-da5b45299c558670ceedc321 Evidence SHA-256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0 행 SHA-256 425d8210d5bfe290a332b713fbc1251e8979031e7d98184583f4845569bf417a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_ce76778eed64e0a3 stable_project_id kproj_f7772b1f3e05c7df source_key 202609|231523|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 검암S/S 건설사업 project_name_detail 154kV 검암S/S 건설사업 region_summary_raw 인천광역시 서해구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV M.TR(60MVA) × 2BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: □ 추진 계획 ○ ‘26.01 : 부지확정 완료 ○ ‘26.07 : 용지매수 완료 ○ ‘27.05 : 착공(토건/변전) ○ ‘29.04 : 변전소 가압 future_plan_redacted □ 향후계획 □ 추진 계획 ○ ‘26.01 : 부지확정 완료 ○ ‘26.07 : 용지매수 완료 ○ ‘27.05 : 착공(토건/변전) ○ ‘29.04 : 변전소 가압 attachment_count 0 source_detail_sha256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231523|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ce76778eed64e0a3
Sources EV-da5b45299c558670ceedc321 Evidence SHA-256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0 행 SHA-256 425d8210d5bfe290a332b713fbc1251e8979031e7d98184583f4845569bf417a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_f7772b1f3e05c7df stable_project_key prjtDef:231523:ESB project_definition 231523 first_region_code ESB manual_source_format false project_name 154kV 검암S/S 건설사업 project_name_list 154kV 검암S/S 건설사업 purpose 검암역세권 개발 및 인천서구지역 부하부담 project_region_detail 인천광역시 서해구 project_period_raw project_scale_raw 154KV M.TR(60MVA) × 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_f7772b1f3e05c7df
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f7772b1f3e05c7df
Sources EV-d642fe2af23372106fdf669c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b839b1abbd4ba2e76e5147dae0614ef4f4b4d3c600ae87f737257883c652d715 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-e5159f9985d0f09f553adcf1
Detailed source fields Original source field Published value or condition stable_project_id kproj_8913f7ca8072b281 stable_project_key prjtDef:234585:ESB project_definition 234585 first_region_code ESB manual_source_format false project_name 154kV 계림-일곡 2차 전력구 건설사업 project_name_list 광주지역 전기공급시설 전력구공사(계림-일곡2차) purpose 계림S/S-일곡S/S 계통보강 project_region_detail 전남광주통합특별시 북구 project_period_raw 2019.10~2024.12 project_scale_raw 관로 1,464M, 메사쉴드 59M, 세미쉴드 119M responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 전력구 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_8913f7ca8072b281
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_8913f7ca8072b281
Sources EV-e5159f9985d0f09f553adcf1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 523e1b06946f8d613b2d3caa377f21a8e56afacdb24065a6ef26b848d3278b4f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02-28 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2019-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2022-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-03-31 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2022-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2024-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2021-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2021-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Previous Next