POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 11items · current page 1–11 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 걸포S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b43f392a3031ec90d066c19a
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_878373e0b96f5a1e
stable_project_keyprjtDef:231487:ESB
project_definition231487
first_region_codeESB
manual_source_formatfalse
project_name154kV 걸포S/S 건설사업
project_name_list154,000V 걸포변전소 건설사업
purpose한강시네폴리스 산단 전력공급 및 인근S/S
project_region_detail경기도 김포시
project_period_raw2019.12~2029.12
project_scale_rawM.TR 2BANK, 170KV GIS 10CCT, 23KV GIS 11CCT(4D/L)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_9780322d9d75a79c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_878373e0b96f5a1e

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_878373e0b96f5a1e

Sources EV-b43f392a3031ec90d066c19a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 20f9b37b382de962cd64d75a8998a526db727b31ddbd12283c975d7d946145a7
Source schedule candidates · KOR · kepco_planned

154kV 걸포S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2019-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9780322d9d75a79c

Sources EV-f20c32f97d11ad4e0d70d77e
Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918
행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44
Source schedule candidates · KOR · kepco_planned

154kV 걸포S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9780322d9d75a79c

Sources EV-f20c32f97d11ad4e0d70d77e
Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918
행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44
Source schedule candidates · KOR · kepco_planned

154kV 걸포S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2029-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9780322d9d75a79c

Sources EV-f20c32f97d11ad4e0d70d77e
Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918
행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44
Source schedule candidates · KOR · kepco_planned

154kV 걸포S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2029-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9780322d9d75a79c

Sources EV-f20c32f97d11ad4e0d70d77e
Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918
행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44
Source schedule candidates · KOR · kepco_planned

154kV 걸포S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9780322d9d75a79c

Sources EV-f20c32f97d11ad4e0d70d77e
Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918
행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44
Source schedule candidates · KOR · kepco_planned

154kV 걸포S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2020-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9780322d9d75a79c

Sources EV-f20c32f97d11ad4e0d70d77e
Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918
행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44
Source schedule candidates · KOR · kepco_planned

154kV 걸포S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2028-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9780322d9d75a79c

Sources EV-f20c32f97d11ad4e0d70d77e
Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918
행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44
Source schedule candidates · KOR · kepco_planned

154kV 걸포S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9780322d9d75a79c

Sources EV-f20c32f97d11ad4e0d70d77e
Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918
행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44
Source snapshots by date · KOR · kepco_planned

154kV 걸포S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_9780322d9d75a79c
stable_project_idkproj_878373e0b96f5a1e
source_key202609|231487|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154,000V 걸포변전소 건설사업
project_name_detail154kV 걸포S/S 건설사업
region_summary_raw경기도 김포시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 한강시네폴리스 산단 전력공급 및 인근S/S
Project region
  • 경기도 김포시
Project period
  • 2019.12~2029.12
사업 규모
  • M.TR 2BANK, 170KV GIS 10CCT, 23KV GIS 11CCT(4D/L)
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.04 참여 위원 수 : 경과지(부지) 확정: 2020.08
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • ○ 산업단지 내 입지로, 한전 자체 입지선정위원회 구성 및 확정함.
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
○ '26. 하반기 : 실시계획(변경) 고시 ○ '28.04 : 변전공사 착공 ○ '29.12 : 변전소 준공 및 가압
future_plan_redacted□ 향후계획 ○ '26. 하반기 : 실시계획(변경) 고시 ○ '28.04 : 변전공사 착공 ○ '29.12 : 변전소 준공 및 가압
attachment_count0
source_detail_sha2566b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231487|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9780322d9d75a79c

Sources EV-f20c32f97d11ad4e0d70d77e
Evidence SHA-256 6b313c469bea2bc60d524460a0c1984e8e71fb4cba51252f741155d027c0a918
행 SHA-256 4bd0ac047ff026bd77ab002b9cb2de67a92aea898596873239b171c698120d44
Source snapshots by date · KOR · kepco_planned

154kV 걸포S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_878373e0b96f5a1e
stable_project_keyprjtDef:231487:ESB
project_definition231487
first_region_codeESB
manual_source_formatfalse
project_name154kV 걸포S/S 건설사업
project_name_list154,000V 걸포변전소 건설사업
purpose한강시네폴리스 산단 전력공급 및 인근S/S
project_region_detail경기도 김포시
project_period_raw2019.12~2029.12
project_scale_rawM.TR 2BANK, 170KV GIS 10CCT, 23KV GIS 11CCT(4D/L)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_9780322d9d75a79c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_878373e0b96f5a1e

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_878373e0b96f5a1e

Sources EV-b43f392a3031ec90d066c19a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 20f9b37b382de962cd64d75a8998a526db727b31ddbd12283c975d7d946145a7

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel