POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 201,406items · current page 301–400 · Source records, not unique facilities.

Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source snapshots by date · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_7d0fb75611b6f544
stable_project_idkproj_8913f7ca8072b281
source_key202609|234585|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list광주지역 전기공급시설 전력구공사(계림-일곡2차)
project_name_detail154kV 계림-일곡 2차 전력구 건설사업
region_summary_raw전남광주통합특별시 북구등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 계림S/S-일곡S/S 계통보강
Project region
  • 전남광주통합특별시 북구
Project period
  • 2019.10~2024.12
사업 규모
  • 관로 1,464M, 메사쉴드 59M, 세미쉴드 119M
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2021.07 공사 기간: 2021.07 ~ 2026.02 감독자: [redacted], 실적): 100, 0
1. 진행경과 □ ‘21.07 : 공사 착공 □ ‘21.12 : 발진수직구 조성중 집단민원 발생으로 인한 공사중지 □ ‘22.02 : 집단민원 해결을 위한 경과지 변경설계 착수 □ ‘22.11 : 경과지 변경설계 완료 및 설계변경 시행, 공사 재개 □ ‘24. 05 : 메사쉴드 구간 지장물(옹벽 강관말뚝) 간섭에 따른 설계변경 추진 □ ‘24. 07 현재 : 터널(메사쉴드) 구간 공법변경 관계자회의 시행 및 실시설계 시행 □ ’24. 08 : 수직구#2 굴착 및 세미쉴드 장비 반입 준비 □ ’24. 09 : 터널(메사쉴드) 구간 관통을 위한 강관압입 시공 완료(L=12m, 2EA) □ ’24. 11 : 터널(메사쉴드) 굴착완료(L=47m) 및 세미쉴드 굴진 중 □ ’24. 12 : 터널(세미쉴드) 굴진완료(L=119m) □ ’25. 02 : 메사쉴드 터널 2차라이닝 및 수직구 구조물공 작업 중 □ ’25. 03 : 수직구#2 인근 주택가 집단민원 발생 및 대응 □ ’25. 05 : 집단민원 대응을 위한 안전진단 용역 시행 □ ’25. 06 현재 : 민원발생 구간 안전진단 결과 초안 도출 □ ’25. 08 피해범위(주민측 요구사항 포함) 관련된 피해보상금액 산출 완료 □ ’25. 08 피해보상금액 산출서 주민측에 발송 □ ’25. 09 피해보상을 위한 주민측과 지속적인 협의 중 □ ’25. 12 : 공사기간 변경(∼26.2.28) □ ’25. 12 : 민원 관련 공사기간 변경(∼26.3.31) □ ’26. 03 : 공사 중지(사유 : 민원 미해소로 준공 인수 여건 미확보) 2. 향후계획 □ 민원해소 완료 후 준공 시
future_plan_redacted□ 향후계획 1. 진행경과 □ ‘21.07 : 공사 착공 □ ‘21.12 : 발진수직구 조성중 집단민원 발생으로 인한 공사중지 □ ‘22.02 : 집단민원 해결을 위한 경과지 변경설계 착수 □ ‘22.11 : 경과지 변경설계 완료 및 설계변경 시행, 공사 재개 □ ‘24. 05 : 메사쉴드 구간 지장물(옹벽 강관말뚝) 간섭에 따른 설계변경 추진 □ ‘24. 07 현재 : 터널(메사쉴드) 구간 공법변경 관계자회의 시행 및 실시설계 시행 □ ’24. 08 : 수직구#2 굴착 및 세미쉴드 장비 반입 준비 □ ’24. 09 : 터널(메사쉴드) 구간 관통을 위한 강관압입 시공 완료(L=12m, 2EA) □ ’24. 11 : 터널(메사쉴드) 굴착완료(L=47m) 및 세미쉴드 굴진 중 □ ’24. 12 : 터널(세미쉴드) 굴진완료(L=119m) □ ’25. 02 : 메사쉴드 터널 2차라이닝 및 수직구 구조물공 작업 중 □ ’25. 03 : 수직구#2 인근 주택가 집단민원 발생 및 대응 □ ’25. 05 : 집단민원 대응을 위한 안전진단 용역 시행 □ ’25. 06 현재 : 민원발생 구간 안전진단 결과 초안 도출 □ ’25. 08 피해범위(주민측 요구사항 포함) 관련된 피해보상금액 산출 완료 □ ’25. 08 피해보상금액 산출서 주민측에 발송 □ ’25. 09 피해보상을 위한 주민측과 지속적인 협의 중 □ ’25. 12 : 공사기간 변경(∼26.2.28) □ ’25. 12 : 민원 관련 공사기간 변경(∼26.3.31) □ ’26. 03 : 공사 중지(사유 : 민원 미해소로 준공 인수 여건 미확보) 2. 향후계획 □ 민원해소 완료 후 준공 시
attachment_count0
source_detail_sha2569efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234585|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source snapshots by date · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8913f7ca8072b281
stable_project_keyprjtDef:234585:ESB
project_definition234585
first_region_codeESB
manual_source_formatfalse
project_name154kV 계림-일곡 2차 전력구 건설사업
project_name_list광주지역 전기공급시설 전력구공사(계림-일곡2차)
purpose계림S/S-일곡S/S 계통보강
project_region_detail전남광주통합특별시 북구
project_period_raw2019.10~2024.12
project_scale_raw관로 1,464M, 메사쉴드 59M, 세미쉴드 119M
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type전력구
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7d0fb75611b6f544
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_8913f7ca8072b281

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8913f7ca8072b281

Sources EV-e5159f9985d0f09f553adcf1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 523e1b06946f8d613b2d3caa377f21a8e56afacdb24065a6ef26b848d3278b4f
Power assets and projects · KOR · kepco_planned

154kV 계림-일곡 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-9ca19b9034b9a0bac815dfc1
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d1eb1954585c549e
stable_project_keyprjtDef:233509:ESB
project_definition233509
first_region_codeESB
manual_source_formatfalse
project_name154kV 계림-일곡 지중T/L 건설사업
project_name_list154kV 계림-일곡 지중송전선로 건설사업
purpose154KV 신광주계통 고장시 일부선로 과부하
project_region_detail전남광주통합특별시 북구
project_period_raw2024.06~2027.12
project_scale_rawXLPE 2000㎟ 1C, 6.4KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7216855c61da8894
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_d1eb1954585c549e

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d1eb1954585c549e

Sources EV-9ca19b9034b9a0bac815dfc1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3b90f311ea1db92972753e65641dd1a7c8b37b1ef7f32be634b26faa38bb4732
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233509|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7216855c61da8894

Sources EV-0358e35c89859123523ed0a6
Evidence SHA-256 58b70706aac12dcf1cd74fa2d5a2d6574a90a67c75810839727130c83b5ec2ff
행 SHA-256 67e6076fa82bf10f3de804c3f9fed1c85bf332ec6ddd623fdfd575e5568b3e06
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233509|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7216855c61da8894

Sources EV-0358e35c89859123523ed0a6
Evidence SHA-256 58b70706aac12dcf1cd74fa2d5a2d6574a90a67c75810839727130c83b5ec2ff
행 SHA-256 67e6076fa82bf10f3de804c3f9fed1c85bf332ec6ddd623fdfd575e5568b3e06
Source snapshots by date · KOR · kepco_planned

154kV 계림-일곡 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_7216855c61da8894
stable_project_idkproj_d1eb1954585c549e
source_key202609|233509|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 계림-일곡 지중송전선로 건설사업
project_name_detail154kV 계림-일곡 지중T/L 건설사업
region_summary_raw전남광주통합특별시 북구등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 154KV 신광주계통 고장시 일부선로 과부하
Project region
  • 전남광주통합특별시 북구
Project period
  • 2024.06~2027.12
사업 규모
  • XLPE 2000㎟ 1C, 6.4KM
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[진행경과] □ '15.11 : 제7차 장기 송변전설비계획 반영 □ '22.06 : 준공목표 변경 [계통(계획)-472(2022.06.13.), `21.10→`24.04] □ '23.11 : 준공목표 변경요청 [계통운영부, `24.04→`26.06] □ '24.05 : 준공목표 변경 [계통(계획)-434(2024.05.14.), `24.04→`26.06] □ '25.09 : 준공목표 변경요청 [계통운영부, `26.06→`27.12] [향후계획] □ '29.03 : 기본설계 완료 □ '29.04 : 실시설계 완료 □ '29.10 : 공사 착공 □ '30.12 : 공사 준공
future_plan_redacted□ 향후계획 [진행경과] □ '15.11 : 제7차 장기 송변전설비계획 반영 □ '22.06 : 준공목표 변경 [계통(계획)-472(2022.06.13.), `21.10→`24.04] □ '23.11 : 준공목표 변경요청 [계통운영부, `24.04→`26.06] □ '24.05 : 준공목표 변경 [계통(계획)-434(2024.05.14.), `24.04→`26.06] □ '25.09 : 준공목표 변경요청 [계통운영부, `26.06→`27.12] [향후계획] □ '29.03 : 기본설계 완료 □ '29.04 : 실시설계 완료 □ '29.10 : 공사 착공 □ '30.12 : 공사 준공
attachment_count0
source_detail_sha25658b70706aac12dcf1cd74fa2d5a2d6574a90a67c75810839727130c83b5ec2ff
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233509|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7216855c61da8894

Sources EV-0358e35c89859123523ed0a6
Evidence SHA-256 58b70706aac12dcf1cd74fa2d5a2d6574a90a67c75810839727130c83b5ec2ff
행 SHA-256 67e6076fa82bf10f3de804c3f9fed1c85bf332ec6ddd623fdfd575e5568b3e06
Source snapshots by date · KOR · kepco_planned

154kV 계림-일곡 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d1eb1954585c549e
stable_project_keyprjtDef:233509:ESB
project_definition233509
first_region_codeESB
manual_source_formatfalse
project_name154kV 계림-일곡 지중T/L 건설사업
project_name_list154kV 계림-일곡 지중송전선로 건설사업
purpose154KV 신광주계통 고장시 일부선로 과부하
project_region_detail전남광주통합특별시 북구
project_period_raw2024.06~2027.12
project_scale_rawXLPE 2000㎟ 1C, 6.4KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7216855c61da8894
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_d1eb1954585c549e

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d1eb1954585c549e

Sources EV-9ca19b9034b9a0bac815dfc1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3b90f311ea1db92972753e65641dd1a7c8b37b1ef7f32be634b26faa38bb4732
Power assets and projects · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-7734f9f23c323ff7597df78d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a6baccd547488df5
stable_project_keyprjtDef:233525:ESB
project_definition233525
first_region_codeESB
manual_source_formatfalse
project_name154kV 고강-강서 지중T/L 건설사업
project_name_list154kV 고강-강서 지중송전선로 건설사업
purpose마곡지역 전력계통 보강
project_region_detail서울특별시 강서구
project_period_raw2022.10~2027.12
project_scale_raw154KV XLPE 2000/1200, 2C 6.0KM
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type지중송전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1b791fb6607416de
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_a6baccd547488df5

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a6baccd547488df5

Sources EV-7734f9f23c323ff7597df78d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 927afe80a2b36d77ec2a6549b9428795d522e8c003dd73d6d22adaec6c6df120
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2022-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2023-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source schedule candidates · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233525|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source snapshots by date · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_1b791fb6607416de
stable_project_idkproj_a6baccd547488df5
source_key202609|233525|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 고강-강서 지중송전선로 건설사업
project_name_detail154kV 고강-강서 지중T/L 건설사업
region_summary_raw서울특별시 강서구등 1 지역
equipment_type_raw지중송전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 마곡지역 전력계통 보강
Project region
  • 서울특별시 강서구
Project period
  • 2022.10~2027.12
사업 규모
  • 154KV XLPE 2000/1200, 2C 6.0KM
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.05 ~ 2022.10 실시설계: 2022.11 ~ 2023.01 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2023.08 공사 기간: 2023.08 ~ 2026.12 감독자: [redacted], 실적): 88, 67
○'18.09 : 장기송변전설비계획 반영 ○'24.05 : 장기송변전설비계획 가압목표 변경('26.12)
future_plan_redacted□ 향후계획 ○'18.09 : 장기송변전설비계획 반영 ○'24.05 : 장기송변전설비계획 가압목표 변경('26.12)
attachment_count0
source_detail_sha256cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233525|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1b791fb6607416de

Sources EV-afb87eae7072ba22aed730f8
Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3
행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957
Source snapshots by date · KOR · kepco_planned

154kV 고강-강서 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a6baccd547488df5
stable_project_keyprjtDef:233525:ESB
project_definition233525
first_region_codeESB
manual_source_formatfalse
project_name154kV 고강-강서 지중T/L 건설사업
project_name_list154kV 고강-강서 지중송전선로 건설사업
purpose마곡지역 전력계통 보강
project_region_detail서울특별시 강서구
project_period_raw2022.10~2027.12
project_scale_raw154KV XLPE 2000/1200, 2C 6.0KM
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type지중송전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1b791fb6607416de
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_a6baccd547488df5

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a6baccd547488df5

Sources EV-7734f9f23c323ff7597df78d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 927afe80a2b36d77ec2a6549b9428795d522e8c003dd73d6d22adaec6c6df120
Power assets and projects · KOR · kepco_planned

154kV 고경S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-5fe61056c0c177e31f39a9c1
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_25548a4c9686344b
stable_project_keyprjtDef:231524:ESB
project_definition231524
first_region_codeESB
manual_source_formatfalse
project_name154kV 고경S/S 건설사업
project_name_list154kV 고경S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detailYeongcheon City, North Gyeongsang Province
project_period_raw2021.10~2026.10
project_scale_raw154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d7e6811f5804484d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_25548a4c9686344b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_25548a4c9686344b

Sources EV-5fe61056c0c177e31f39a9c1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 53c3dfdc1f8e661d9ee1bcbbf7a5c1336ff3a507741179e9606fe76bb7764b2d
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source snapshots by date · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d7e6811f5804484d
stable_project_idkproj_25548a4c9686344b
source_key202609|231524|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 고경S/S 건설사업
project_name_detail154kV 고경S/S 건설사업
region_summary_raw경상북도 영천시등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • Yeongcheon City, North Gyeongsang Province
Project period
  • 2021.10~2026.10
사업 규모
  • 154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2023.03 참여 위원 수 : 11 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2024.08 ~ 2024.09 실시설계: 설계담당자: [redacted]
[진행경과] □ '21.10 : 제9차 장기 송변전설비계획 신규사업 반영 □ '23.10 : 부지확정 보고(영천 고경일반산업단지 내) □ '24.09 : 기본설계 완료 및 용지매수 의뢰 □ '24.11 : 변전주자재 발주 및 계약 □ '25.08 : 산단시행사 부지조성 관련 업무회의 시행 □ '25.12 : 25년 4분기 PMO 회의 시행(준공목표조정 검토('26.10 → '27.10)) [향후계획] □ '25.06 : 실시설계 완료 □ '26.10 : 변전공사 착공 □ '27.10 : 변전소 가압 및 준공
future_plan_redacted□ 향후계획 [진행경과] □ '21.10 : 제9차 장기 송변전설비계획 신규사업 반영 □ '23.10 : 부지확정 보고(영천 고경일반산업단지 내) □ '24.09 : 기본설계 완료 및 용지매수 의뢰 □ '24.11 : 변전주자재 발주 및 계약 □ '25.08 : 산단시행사 부지조성 관련 업무회의 시행 □ '25.12 : 25년 4분기 PMO 회의 시행(준공목표조정 검토('26.10 → '27.10)) [향후계획] □ '25.06 : 실시설계 완료 □ '26.10 : 변전공사 착공 □ '27.10 : 변전소 가압 및 준공
attachment_count0
source_detail_sha256f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231524|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source snapshots by date · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_25548a4c9686344b
stable_project_keyprjtDef:231524:ESB
project_definition231524
first_region_codeESB
manual_source_formatfalse
project_name154kV 고경S/S 건설사업
project_name_list154kV 고경S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detailYeongcheon City, North Gyeongsang Province
project_period_raw2021.10~2026.10
project_scale_raw154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d7e6811f5804484d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_25548a4c9686344b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_25548a4c9686344b

Sources EV-5fe61056c0c177e31f39a9c1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 53c3dfdc1f8e661d9ee1bcbbf7a5c1336ff3a507741179e9606fe76bb7764b2d
Power assets and projects · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b5ac17f14af1f9d9de405b93
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_aa84f01c9a19c122
stable_project_keyprjtDef:232570:ESB
project_definition232570
first_region_codeESB
manual_source_formatfalse
project_name154kV 고경분기T/L 건설사업
project_name_list154kV 고경분기 송전선로 건설사업
purpose영천 고경일반산업단지 전력공급을 위함.
project_region_detailYeongcheon City, North Gyeongsang Province
project_period_raw2021.09~2026.10
project_scale_raw154KV ACSR 330㎟ × S × 2C, 0.453KM
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0adfe6ca8a27b59e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_aa84f01c9a19c122

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_aa84f01c9a19c122

Sources EV-b5ac17f14af1f9d9de405b93
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8169f1bb377e0e70b11ef1b1ef1ab4277f0674d691f4f4f093c39f4c7b4d9e71
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-09
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source snapshots by date · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_0adfe6ca8a27b59e
stable_project_idkproj_aa84f01c9a19c122
source_key202609|232570|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 고경분기 송전선로 건설사업
project_name_detail154kV 고경분기T/L 건설사업
region_summary_raw경상북도 영천시등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 영천 고경일반산업단지 전력공급을 위함.
Project region
  • Yeongcheon City, North Gyeongsang Province
Project period
  • 2021.09~2026.10
사업 규모
  • 154KV ACSR 330㎟ × S × 2C, 0.453KM
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.08
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ '24.08 : 입지확정
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2024.10 ~ 2025.10 기본설계: 2024.11 ~ 2024.12 실시설계: 2025.03 ~ 2025.04 설계담당자: [redacted]
□ '26.10 : 공사준공
future_plan_redacted□ 향후계획 □ '26.10 : 공사준공
attachment_count0
source_detail_sha256d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232570|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source snapshots by date · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_aa84f01c9a19c122
stable_project_keyprjtDef:232570:ESB
project_definition232570
first_region_codeESB
manual_source_formatfalse
project_name154kV 고경분기T/L 건설사업
project_name_list154kV 고경분기 송전선로 건설사업
purpose영천 고경일반산업단지 전력공급을 위함.
project_region_detailYeongcheon City, North Gyeongsang Province
project_period_raw2021.09~2026.10
project_scale_raw154KV ACSR 330㎟ × S × 2C, 0.453KM
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0adfe6ca8a27b59e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_aa84f01c9a19c122

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_aa84f01c9a19c122

Sources EV-b5ac17f14af1f9d9de405b93
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8169f1bb377e0e70b11ef1b1ef1ab4277f0674d691f4f4f093c39f4c7b4d9e71
Power assets and projects · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-55cb3c185389c1b797746fe5
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1bb102831bf8929f
stable_project_keyprjtDef:232487:ESB
project_definition232487
first_region_codeESB
manual_source_formatfalse
project_name154kV 고령-명곡T/L 건설사업
project_name_list154kV 고령-명곡T/L 건설사업
purpose고령계 계통보강을 통한 안정성 향상
project_region_detail경상북도 고령군 대구광역시 달성군
project_period_raw2024.05~2029.06
project_scale_rawACSR 410*2B*2회선,신설6.8KM(증설 포함 11KM)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_473a96cb0d7dc0c9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_1bb102831bf8929f

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1bb102831bf8929f

Sources EV-55cb3c185389c1b797746fe5
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7ece7c246983a1dbdabf2cc149590417e016b9857df3dbe5a108a88d49acaf0a
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2021-11
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2021-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2024-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2024-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2018-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2021-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2028-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2021-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2018-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2012-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source schedule candidates · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2021-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232487|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source snapshots by date · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_473a96cb0d7dc0c9
stable_project_idkproj_1bb102831bf8929f
source_key202609|232487|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 고령-명곡T/L 건설사업
project_name_detail154kV 고령-명곡T/L 건설사업
region_summary_raw경상북도 고령군등 2 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 고령계 계통보강을 통한 안정성 향상
Project region
  • 경상북도 고령군 대구광역시 달성군
Project period
  • 2024.05~2029.06
사업 규모
  • ACSR 410*2B*2회선,신설6.8KM(증설 포함 11KM)
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2018.01 입지선정위원회 구성시기: 2021.02 참여 위원 수 : 지장유무 조회: 2021.08~ 경과지(부지) 확정: 2021.11
환경/재해 영향평가
  • 환경영향평가: 재해영향평가: 2023.03 ~
주민의견 수렴
  • 지자체 공고 열람: 2024.05 ~ 2024.06 설명회·공청회: 2024.06 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • ?? ’18.07 : 제 8차 전력수급기본계획 반영(산업통상자원부 공고 제2017-611호, ’17.12) ??‘18.01. : 전력영향평가 및 경과지 설계용역 착수 ??‘21.02. : 입지선정위원회 구성 완료 ??‘12.05.∼11. : 입지선정위원회(1차~7차) 및 최적경과지 확정 ??‘21.08. : 지장유무조회 ??‘22.12. : 송전선로 경과지 설계측량 완료 ??‘23.02 : 송전선로 입지 확정 ??‘23.03 ∼ 12 : 환경, 재해영향평가시행, 자재운반방법 선정 ??‘24.05 : 실시계획승인 관련 주민설명회 시행(고령군,달성군) ??‘24.08. : 실시계획승인 신청
'17.12 : 제 8차 장기 송변전 설비계획 반영 '18.01 : 전력영향평가 및 경과지 설계용역 착수 '21.05 ~ '21.11 : 입지선정위원회 시행 '22.04 : 마을 별 주민설명회 개최 및 입지확정 '24.07 : 실시계획 승인신청 '25.10 : 실시계획 승인 및 공사 착공 '28.12 : 송전선로 전기공급
future_plan_redacted□ 향후계획 '17.12 : 제 8차 장기 송변전 설비계획 반영 '18.01 : 전력영향평가 및 경과지 설계용역 착수 '21.05 ~ '21.11 : 입지선정위원회 시행 '22.04 : 마을 별 주민설명회 개최 및 입지확정 '24.07 : 실시계획 승인신청 '25.10 : 실시계획 승인 및 공사 착공 '28.12 : 송전선로 전기공급
attachment_count0
source_detail_sha2561555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232487|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_473a96cb0d7dc0c9

Sources EV-70e0979ba2021eb7dfb998af
Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991
행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c
Source snapshots by date · KOR · kepco_planned

154kV 고령-명곡T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1bb102831bf8929f
stable_project_keyprjtDef:232487:ESB
project_definition232487
first_region_codeESB
manual_source_formatfalse
project_name154kV 고령-명곡T/L 건설사업
project_name_list154kV 고령-명곡T/L 건설사업
purpose고령계 계통보강을 통한 안정성 향상
project_region_detail경상북도 고령군 대구광역시 달성군
project_period_raw2024.05~2029.06
project_scale_rawACSR 410*2B*2회선,신설6.8KM(증설 포함 11KM)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_473a96cb0d7dc0c9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_1bb102831bf8929f

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1bb102831bf8929f

Sources EV-55cb3c185389c1b797746fe5
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7ece7c246983a1dbdabf2cc149590417e016b9857df3dbe5a108a88d49acaf0a
Power assets and projects · KOR · kepco_planned

154kV 고림S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-75b6b6c37795fd1d40bbae75
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ba58f264ee960952
stable_project_keyprjtDef:231529:ESB
project_definition231529
first_region_codeESB
manual_source_formatfalse
project_name154kV 고림S/S 건설사업
project_name_list154kV 고림변전소 건설사업
purpose용인국제물류4.0 물류단지 신규부하 공급
project_region_detail경기도 용인시 처인구
project_period_raw2021.07~2027.03
project_scale_raw154/23KV 45/60MVA X 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0345aec15b9881a3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_ba58f264ee960952

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ba58f264ee960952

Sources EV-75b6b6c37795fd1d40bbae75
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3167c383f5647547c43620d9d67487201e48e1eea1160c37077ec5872a2649d4
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel