POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 301–400 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234585|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7d0fb75611b6f544 stable_project_id kproj_8913f7ca8072b281 source_key 202609|234585|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 광주지역 전기공급시설 전력구공사(계림-일곡2차) project_name_detail 154kV 계림-일곡 2차 전력구 건설사업 region_summary_raw 전남광주통합특별시 북구등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 사업 규모 관로 1,464M, 메사쉴드 59M, 세미쉴드 119M 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] 건설공사 개요 공사 착공: 2021.07 공사 기간: 2021.07 ~ 2026.02 감독자: [redacted], 실적): 100, 0 1. 진행경과 □ ‘21.07 : 공사 착공 □ ‘21.12 : 발진수직구 조성중 집단민원 발생으로 인한 공사중지 □ ‘22.02 : 집단민원 해결을 위한 경과지 변경설계 착수 □ ‘22.11 : 경과지 변경설계 완료 및 설계변경 시행, 공사 재개 □ ‘24. 05 : 메사쉴드 구간 지장물(옹벽 강관말뚝) 간섭에 따른 설계변경 추진 □ ‘24. 07 현재 : 터널(메사쉴드) 구간 공법변경 관계자회의 시행 및 실시설계 시행 □ ’24. 08 : 수직구#2 굴착 및 세미쉴드 장비 반입 준비 □ ’24. 09 : 터널(메사쉴드) 구간 관통을 위한 강관압입 시공 완료(L=12m, 2EA) □ ’24. 11 : 터널(메사쉴드) 굴착완료(L=47m) 및 세미쉴드 굴진 중 □ ’24. 12 : 터널(세미쉴드) 굴진완료(L=119m) □ ’25. 02 : 메사쉴드 터널 2차라이닝 및 수직구 구조물공 작업 중 □ ’25. 03 : 수직구#2 인근 주택가 집단민원 발생 및 대응 □ ’25. 05 : 집단민원 대응을 위한 안전진단 용역 시행 □ ’25. 06 현재 : 민원발생 구간 안전진단 결과 초안 도출 □ ’25. 08 피해범위(주민측 요구사항 포함) 관련된 피해보상금액 산출 완료 □ ’25. 08 피해보상금액 산출서 주민측에 발송 □ ’25. 09 피해보상을 위한 주민측과 지속적인 협의 중 □ ’25. 12 : 공사기간 변경(∼26.2.28) □ ’25. 12 : 민원 관련 공사기간 변경(∼26.3.31) □ ’26. 03 : 공사 중지(사유 : 민원 미해소로 준공 인수 여건 미확보) 2. 향후계획 □ 민원해소 완료 후 준공 시 future_plan_redacted □ 향후계획 1. 진행경과 □ ‘21.07 : 공사 착공 □ ‘21.12 : 발진수직구 조성중 집단민원 발생으로 인한 공사중지 □ ‘22.02 : 집단민원 해결을 위한 경과지 변경설계 착수 □ ‘22.11 : 경과지 변경설계 완료 및 설계변경 시행, 공사 재개 □ ‘24. 05 : 메사쉴드 구간 지장물(옹벽 강관말뚝) 간섭에 따른 설계변경 추진 □ ‘24. 07 현재 : 터널(메사쉴드) 구간 공법변경 관계자회의 시행 및 실시설계 시행 □ ’24. 08 : 수직구#2 굴착 및 세미쉴드 장비 반입 준비 □ ’24. 09 : 터널(메사쉴드) 구간 관통을 위한 강관압입 시공 완료(L=12m, 2EA) □ ’24. 11 : 터널(메사쉴드) 굴착완료(L=47m) 및 세미쉴드 굴진 중 □ ’24. 12 : 터널(세미쉴드) 굴진완료(L=119m) □ ’25. 02 : 메사쉴드 터널 2차라이닝 및 수직구 구조물공 작업 중 □ ’25. 03 : 수직구#2 인근 주택가 집단민원 발생 및 대응 □ ’25. 05 : 집단민원 대응을 위한 안전진단 용역 시행 □ ’25. 06 현재 : 민원발생 구간 안전진단 결과 초안 도출 □ ’25. 08 피해범위(주민측 요구사항 포함) 관련된 피해보상금액 산출 완료 □ ’25. 08 피해보상금액 산출서 주민측에 발송 □ ’25. 09 피해보상을 위한 주민측과 지속적인 협의 중 □ ’25. 12 : 공사기간 변경(∼26.2.28) □ ’25. 12 : 민원 관련 공사기간 변경(∼26.3.31) □ ’26. 03 : 공사 중지(사유 : 민원 미해소로 준공 인수 여건 미확보) 2. 향후계획 □ 민원해소 완료 후 준공 시 attachment_count 0 source_detail_sha256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234585|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d0fb75611b6f544
Sources EV-41ddd7b13f8d1f2c9824663d Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5 행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_8913f7ca8072b281 stable_project_key prjtDef:234585:ESB project_definition 234585 first_region_code ESB manual_source_format false project_name 154kV 계림-일곡 2차 전력구 건설사업 project_name_list 광주지역 전기공급시설 전력구공사(계림-일곡2차) purpose 계림S/S-일곡S/S 계통보강 project_region_detail 전남광주통합특별시 북구 project_period_raw 2019.10~2024.12 project_scale_raw 관로 1,464M, 메사쉴드 59M, 세미쉴드 119M responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 전력구 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_8913f7ca8072b281
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_8913f7ca8072b281
Sources EV-e5159f9985d0f09f553adcf1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 523e1b06946f8d613b2d3caa377f21a8e56afacdb24065a6ef26b848d3278b4f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-9ca19b9034b9a0bac815dfc1
Detailed source fields Original source field Published value or condition stable_project_id kproj_d1eb1954585c549e stable_project_key prjtDef:233509:ESB project_definition 233509 first_region_code ESB manual_source_format false project_name 154kV 계림-일곡 지중T/L 건설사업 project_name_list 154kV 계림-일곡 지중송전선로 건설사업 purpose 154KV 신광주계통 고장시 일부선로 과부하 project_region_detail 전남광주통합특별시 북구 project_period_raw 2024.06~2027.12 project_scale_raw XLPE 2000㎟ 1C, 6.4KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_d1eb1954585c549e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d1eb1954585c549e
Sources EV-9ca19b9034b9a0bac815dfc1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3b90f311ea1db92972753e65641dd1a7c8b37b1ef7f32be634b26faa38bb4732 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233509|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7216855c61da8894
Sources EV-0358e35c89859123523ed0a6 Evidence SHA-256 58b70706aac12dcf1cd74fa2d5a2d6574a90a67c75810839727130c83b5ec2ff 행 SHA-256 67e6076fa82bf10f3de804c3f9fed1c85bf332ec6ddd623fdfd575e5568b3e06 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233509|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7216855c61da8894
Sources EV-0358e35c89859123523ed0a6 Evidence SHA-256 58b70706aac12dcf1cd74fa2d5a2d6574a90a67c75810839727130c83b5ec2ff 행 SHA-256 67e6076fa82bf10f3de804c3f9fed1c85bf332ec6ddd623fdfd575e5568b3e06 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7216855c61da8894 stable_project_id kproj_d1eb1954585c549e source_key 202609|233509|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 계림-일곡 지중송전선로 건설사업 project_name_detail 154kV 계림-일곡 지중T/L 건설사업 region_summary_raw 전남광주통합특별시 북구등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [진행경과] □ '15.11 : 제7차 장기 송변전설비계획 반영 □ '22.06 : 준공목표 변경 [계통(계획)-472(2022.06.13.), `21.10→`24.04] □ '23.11 : 준공목표 변경요청 [계통운영부, `24.04→`26.06] □ '24.05 : 준공목표 변경 [계통(계획)-434(2024.05.14.), `24.04→`26.06] □ '25.09 : 준공목표 변경요청 [계통운영부, `26.06→`27.12] [향후계획] □ '29.03 : 기본설계 완료 □ '29.04 : 실시설계 완료 □ '29.10 : 공사 착공 □ '30.12 : 공사 준공 future_plan_redacted □ 향후계획 [진행경과] □ '15.11 : 제7차 장기 송변전설비계획 반영 □ '22.06 : 준공목표 변경 [계통(계획)-472(2022.06.13.), `21.10→`24.04] □ '23.11 : 준공목표 변경요청 [계통운영부, `24.04→`26.06] □ '24.05 : 준공목표 변경 [계통(계획)-434(2024.05.14.), `24.04→`26.06] □ '25.09 : 준공목표 변경요청 [계통운영부, `26.06→`27.12] [향후계획] □ '29.03 : 기본설계 완료 □ '29.04 : 실시설계 완료 □ '29.10 : 공사 착공 □ '30.12 : 공사 준공 attachment_count 0 source_detail_sha256 58b70706aac12dcf1cd74fa2d5a2d6574a90a67c75810839727130c83b5ec2ff first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233509|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7216855c61da8894
Sources EV-0358e35c89859123523ed0a6 Evidence SHA-256 58b70706aac12dcf1cd74fa2d5a2d6574a90a67c75810839727130c83b5ec2ff 행 SHA-256 67e6076fa82bf10f3de804c3f9fed1c85bf332ec6ddd623fdfd575e5568b3e06 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_d1eb1954585c549e stable_project_key prjtDef:233509:ESB project_definition 233509 first_region_code ESB manual_source_format false project_name 154kV 계림-일곡 지중T/L 건설사업 project_name_list 154kV 계림-일곡 지중송전선로 건설사업 purpose 154KV 신광주계통 고장시 일부선로 과부하 project_region_detail 전남광주통합특별시 북구 project_period_raw 2024.06~2027.12 project_scale_raw XLPE 2000㎟ 1C, 6.4KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_d1eb1954585c549e
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d1eb1954585c549e
Sources EV-9ca19b9034b9a0bac815dfc1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3b90f311ea1db92972753e65641dd1a7c8b37b1ef7f32be634b26faa38bb4732 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7734f9f23c323ff7597df78d
Detailed source fields Original source field Published value or condition stable_project_id kproj_a6baccd547488df5 stable_project_key prjtDef:233525:ESB project_definition 233525 first_region_code ESB manual_source_format false project_name 154kV 고강-강서 지중T/L 건설사업 project_name_list 154kV 고강-강서 지중송전선로 건설사업 purpose 마곡지역 전력계통 보강 project_region_detail 서울특별시 강서구 project_period_raw 2022.10~2027.12 project_scale_raw 154KV XLPE 2000/1200, 2C 6.0KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_a6baccd547488df5
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a6baccd547488df5
Sources EV-7734f9f23c323ff7597df78d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 927afe80a2b36d77ec2a6549b9428795d522e8c003dd73d6d22adaec6c6df120 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_1b791fb6607416de stable_project_id kproj_a6baccd547488df5 source_key 202609|233525|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 고강-강서 지중송전선로 건설사업 project_name_detail 154kV 고강-강서 지중T/L 건설사업 region_summary_raw 서울특별시 강서구등 1 지역 equipment_type_raw 지중송전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV XLPE 2000/1200, 2C 6.0KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2022.05 ~ 2022.10 실시설계: 2022.11 ~ 2023.01 설계담당자: [redacted] 건설공사 개요 공사 착공: 2023.08 공사 기간: 2023.08 ~ 2026.12 감독자: [redacted], 실적): 88, 67 ○'18.09 : 장기송변전설비계획 반영 ○'24.05 : 장기송변전설비계획 가압목표 변경('26.12) future_plan_redacted □ 향후계획 ○'18.09 : 장기송변전설비계획 반영 ○'24.05 : 장기송변전설비계획 가압목표 변경('26.12) attachment_count 0 source_detail_sha256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233525|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a6baccd547488df5 stable_project_key prjtDef:233525:ESB project_definition 233525 first_region_code ESB manual_source_format false project_name 154kV 고강-강서 지중T/L 건설사업 project_name_list 154kV 고강-강서 지중송전선로 건설사업 purpose 마곡지역 전력계통 보강 project_region_detail 서울특별시 강서구 project_period_raw 2022.10~2027.12 project_scale_raw 154KV XLPE 2000/1200, 2C 6.0KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_a6baccd547488df5
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a6baccd547488df5
Sources EV-7734f9f23c323ff7597df78d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 927afe80a2b36d77ec2a6549b9428795d522e8c003dd73d6d22adaec6c6df120 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-5fe61056c0c177e31f39a9c1
Detailed source fields Original source field Published value or condition stable_project_id kproj_25548a4c9686344b stable_project_key prjtDef:231524:ESB project_definition 231524 first_region_code ESB manual_source_format false project_name 154kV 고경S/S 건설사업 project_name_list 154kV 고경S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail Yeongcheon City, North Gyeongsang Province project_period_raw 2021.10~2026.10 project_scale_raw 154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_25548a4c9686344b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_25548a4c9686344b
Sources EV-5fe61056c0c177e31f39a9c1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 53c3dfdc1f8e661d9ee1bcbbf7a5c1336ff3a507741179e9606fe76bb7764b2d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_d7e6811f5804484d stable_project_id kproj_25548a4c9686344b source_key 202609|231524|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 고경S/S 건설사업 project_name_detail 154kV 고경S/S 건설사업 region_summary_raw 경상북도 영천시등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project region Yeongcheon City, North Gyeongsang Province 사업 규모 154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2023.03 참여 위원 수 : 11 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2024.08 ~ 2024.09 실시설계: 설계담당자: [redacted] [진행경과] □ '21.10 : 제9차 장기 송변전설비계획 신규사업 반영 □ '23.10 : 부지확정 보고(영천 고경일반산업단지 내) □ '24.09 : 기본설계 완료 및 용지매수 의뢰 □ '24.11 : 변전주자재 발주 및 계약 □ '25.08 : 산단시행사 부지조성 관련 업무회의 시행 □ '25.12 : 25년 4분기 PMO 회의 시행(준공목표조정 검토('26.10 → '27.10)) [향후계획] □ '25.06 : 실시설계 완료 □ '26.10 : 변전공사 착공 □ '27.10 : 변전소 가압 및 준공 future_plan_redacted □ 향후계획 [진행경과] □ '21.10 : 제9차 장기 송변전설비계획 신규사업 반영 □ '23.10 : 부지확정 보고(영천 고경일반산업단지 내) □ '24.09 : 기본설계 완료 및 용지매수 의뢰 □ '24.11 : 변전주자재 발주 및 계약 □ '25.08 : 산단시행사 부지조성 관련 업무회의 시행 □ '25.12 : 25년 4분기 PMO 회의 시행(준공목표조정 검토('26.10 → '27.10)) [향후계획] □ '25.06 : 실시설계 완료 □ '26.10 : 변전공사 착공 □ '27.10 : 변전소 가압 및 준공 attachment_count 0 source_detail_sha256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231524|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_25548a4c9686344b stable_project_key prjtDef:231524:ESB project_definition 231524 first_region_code ESB manual_source_format false project_name 154kV 고경S/S 건설사업 project_name_list 154kV 고경S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail Yeongcheon City, North Gyeongsang Province project_period_raw 2021.10~2026.10 project_scale_raw 154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_25548a4c9686344b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_25548a4c9686344b
Sources EV-5fe61056c0c177e31f39a9c1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 53c3dfdc1f8e661d9ee1bcbbf7a5c1336ff3a507741179e9606fe76bb7764b2d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b5ac17f14af1f9d9de405b93
Detailed source fields Original source field Published value or condition stable_project_id kproj_aa84f01c9a19c122 stable_project_key prjtDef:232570:ESB project_definition 232570 first_region_code ESB manual_source_format false project_name 154kV 고경분기T/L 건설사업 project_name_list 154kV 고경분기 송전선로 건설사업 purpose 영천 고경일반산업단지 전력공급을 위함. project_region_detail Yeongcheon City, North Gyeongsang Province project_period_raw 2021.09~2026.10 project_scale_raw 154KV ACSR 330㎟ × S × 2C, 0.453KM responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_aa84f01c9a19c122
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_aa84f01c9a19c122
Sources EV-b5ac17f14af1f9d9de405b93 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8169f1bb377e0e70b11ef1b1ef1ab4277f0674d691f4f4f093c39f4c7b4d9e71 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0adfe6ca8a27b59e stable_project_id kproj_aa84f01c9a19c122 source_key 202609|232570|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 고경분기 송전선로 건설사업 project_name_detail 154kV 고경분기T/L 건설사업 region_summary_raw 경상북도 영천시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields Project region Yeongcheon City, North Gyeongsang Province 사업 규모 154KV ACSR 330㎟ × S × 2C, 0.453KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.08 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2024.10 ~ 2025.10 기본설계: 2024.11 ~ 2024.12 실시설계: 2025.03 ~ 2025.04 설계담당자: [redacted] future_plan_redacted □ 향후계획 □ '26.10 : 공사준공 attachment_count 0 source_detail_sha256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232570|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_aa84f01c9a19c122 stable_project_key prjtDef:232570:ESB project_definition 232570 first_region_code ESB manual_source_format false project_name 154kV 고경분기T/L 건설사업 project_name_list 154kV 고경분기 송전선로 건설사업 purpose 영천 고경일반산업단지 전력공급을 위함. project_region_detail Yeongcheon City, North Gyeongsang Province project_period_raw 2021.09~2026.10 project_scale_raw 154KV ACSR 330㎟ × S × 2C, 0.453KM responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_aa84f01c9a19c122
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_aa84f01c9a19c122
Sources EV-b5ac17f14af1f9d9de405b93 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8169f1bb377e0e70b11ef1b1ef1ab4277f0674d691f4f4f093c39f4c7b4d9e71 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-55cb3c185389c1b797746fe5
Detailed source fields Original source field Published value or condition stable_project_id kproj_1bb102831bf8929f stable_project_key prjtDef:232487:ESB project_definition 232487 first_region_code ESB manual_source_format false project_name 154kV 고령-명곡T/L 건설사업 project_name_list 154kV 고령-명곡T/L 건설사업 purpose 고령계 계통보강을 통한 안정성 향상 project_region_detail 경상북도 고령군 대구광역시 달성군 project_period_raw 2024.05~2029.06 project_scale_raw ACSR 410*2B*2회선,신설6.8KM(증설 포함 11KM) responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_1bb102831bf8929f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_1bb102831bf8929f
Sources EV-55cb3c185389c1b797746fe5 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 7ece7c246983a1dbdabf2cc149590417e016b9857df3dbe5a108a88d49acaf0a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2021-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2021-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2017-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2018-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2017-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2021-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2028-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2021-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2018-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2012-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2021-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232487|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_473a96cb0d7dc0c9 stable_project_id kproj_1bb102831bf8929f source_key 202609|232487|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 고령-명곡T/L 건설사업 project_name_detail 154kV 고령-명곡T/L 건설사업 region_summary_raw 경상북도 고령군등 2 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 사업 규모 ACSR 410*2B*2회선,신설6.8KM(증설 포함 11KM) 입지선정 전력입지영향평가 용역 착수: 2018.01 입지선정위원회 구성시기: 2021.02 참여 위원 수 : 지장유무 조회: 2021.08~ 경과지(부지) 확정: 2021.11 환경/재해 영향평가 환경영향평가: 재해영향평가: 2023.03 ~ 주민의견 수렴 지자체 공고 열람: 2024.05 ~ 2024.06 설명회·공청회: 2024.06 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 ?? ’18.07 : 제 8차 전력수급기본계획 반영(산업통상자원부 공고 제2017-611호, ’17.12) ??‘18.01. : 전력영향평가 및 경과지 설계용역 착수 ??‘21.02. : 입지선정위원회 구성 완료 ??‘12.05.∼11. : 입지선정위원회(1차~7차) 및 최적경과지 확정 ??‘21.08. : 지장유무조회 ??‘22.12. : 송전선로 경과지 설계측량 완료 ??‘23.02 : 송전선로 입지 확정 ??‘23.03 ∼ 12 : 환경, 재해영향평가시행, 자재운반방법 선정 ??‘24.05 : 실시계획승인 관련 주민설명회 시행(고령군,달성군) ??‘24.08. : 실시계획승인 신청 '17.12 : 제 8차 장기 송변전 설비계획 반영 '18.01 : 전력영향평가 및 경과지 설계용역 착수 '21.05 ~ '21.11 : 입지선정위원회 시행 '22.04 : 마을 별 주민설명회 개최 및 입지확정 '24.07 : 실시계획 승인신청 '25.10 : 실시계획 승인 및 공사 착공 '28.12 : 송전선로 전기공급 future_plan_redacted □ 향후계획 '17.12 : 제 8차 장기 송변전 설비계획 반영 '18.01 : 전력영향평가 및 경과지 설계용역 착수 '21.05 ~ '21.11 : 입지선정위원회 시행 '22.04 : 마을 별 주민설명회 개최 및 입지확정 '24.07 : 실시계획 승인신청 '25.10 : 실시계획 승인 및 공사 착공 '28.12 : 송전선로 전기공급 attachment_count 0 source_detail_sha256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232487|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_473a96cb0d7dc0c9
Sources EV-70e0979ba2021eb7dfb998af Evidence SHA-256 1555bdc636c965493f71a5ff2d7f7cedfbe333eeb80517c07ab5f19940485991 행 SHA-256 5fbfad95fdbdbcae6b25b70d25bb12c1e554c020ddbaad3ac88446c35029c54c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_1bb102831bf8929f stable_project_key prjtDef:232487:ESB project_definition 232487 first_region_code ESB manual_source_format false project_name 154kV 고령-명곡T/L 건설사업 project_name_list 154kV 고령-명곡T/L 건설사업 purpose 고령계 계통보강을 통한 안정성 향상 project_region_detail 경상북도 고령군 대구광역시 달성군 project_period_raw 2024.05~2029.06 project_scale_raw ACSR 410*2B*2회선,신설6.8KM(증설 포함 11KM) responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_1bb102831bf8929f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_1bb102831bf8929f
Sources EV-55cb3c185389c1b797746fe5 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 7ece7c246983a1dbdabf2cc149590417e016b9857df3dbe5a108a88d49acaf0a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-75b6b6c37795fd1d40bbae75
Detailed source fields Original source field Published value or condition stable_project_id kproj_ba58f264ee960952 stable_project_key prjtDef:231529:ESB project_definition 231529 first_region_code ESB manual_source_format false project_name 154kV 고림S/S 건설사업 project_name_list 154kV 고림변전소 건설사업 purpose 용인국제물류4.0 물류단지 신규부하 공급 project_region_detail 경기도 용인시 처인구 project_period_raw 2021.07~2027.03 project_scale_raw 154/23KV 45/60MVA X 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_ba58f264ee960952
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ba58f264ee960952
Sources EV-75b6b6c37795fd1d40bbae75 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3167c383f5647547c43620d9d67487201e48e1eea1160c37077ec5872a2649d4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Previous Next