POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 15items · current page 1–15 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7734f9f23c323ff7597df78d
Detailed source fields Original source field Published value or condition stable_project_id kproj_a6baccd547488df5 stable_project_key prjtDef:233525:ESB project_definition 233525 first_region_code ESB manual_source_format false project_name 154kV 고강-강서 지중T/L 건설사업 project_name_list 154kV 고강-강서 지중송전선로 건설사업 purpose 마곡지역 전력계통 보강 project_region_detail 서울특별시 강서구 project_period_raw 2022.10~2027.12 project_scale_raw 154KV XLPE 2000/1200, 2C 6.0KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_a6baccd547488df5
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a6baccd547488df5
Sources EV-7734f9f23c323ff7597df78d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 927afe80a2b36d77ec2a6549b9428795d522e8c003dd73d6d22adaec6c6df120 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|233525|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_1b791fb6607416de stable_project_id kproj_a6baccd547488df5 source_key 202609|233525|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 고강-강서 지중송전선로 건설사업 project_name_detail 154kV 고강-강서 지중T/L 건설사업 region_summary_raw 서울특별시 강서구등 1 지역 equipment_type_raw 지중송전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV XLPE 2000/1200, 2C 6.0KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2022.05 ~ 2022.10 실시설계: 2022.11 ~ 2023.01 설계담당자: [redacted] 건설공사 개요 공사 착공: 2023.08 공사 기간: 2023.08 ~ 2026.12 감독자: [redacted], 실적): 88, 67 ○'18.09 : 장기송변전설비계획 반영 ○'24.05 : 장기송변전설비계획 가압목표 변경('26.12) future_plan_redacted □ 향후계획 ○'18.09 : 장기송변전설비계획 반영 ○'24.05 : 장기송변전설비계획 가압목표 변경('26.12) attachment_count 0 source_detail_sha256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233525|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1b791fb6607416de
Sources EV-afb87eae7072ba22aed730f8 Evidence SHA-256 cc6ebaf43c085ec199702fc448ca1fedea3e610d5fb45c23e56df28acd13cdb3 행 SHA-256 c1fa73bd1c463fb58a3f87ff3c31f4fee40f166e1d6cdd470037bebdacd04957 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a6baccd547488df5 stable_project_key prjtDef:233525:ESB project_definition 233525 first_region_code ESB manual_source_format false project_name 154kV 고강-강서 지중T/L 건설사업 project_name_list 154kV 고강-강서 지중송전선로 건설사업 purpose 마곡지역 전력계통 보강 project_region_detail 서울특별시 강서구 project_period_raw 2022.10~2027.12 project_scale_raw 154KV XLPE 2000/1200, 2C 6.0KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_a6baccd547488df5
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a6baccd547488df5
Sources EV-7734f9f23c323ff7597df78d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 927afe80a2b36d77ec2a6549b9428795d522e8c003dd73d6d22adaec6c6df120 Observations for this power asset History for this project