POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 24items · current page 1–24 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-75b6b6c37795fd1d40bbae75
Detailed source fields Original source field Published value or condition stable_project_id kproj_ba58f264ee960952 stable_project_key prjtDef:231529:ESB project_definition 231529 first_region_code ESB manual_source_format false project_name 154kV 고림S/S 건설사업 project_name_list 154kV 고림변전소 건설사업 purpose 용인국제물류4.0 물류단지 신규부하 공급 project_region_detail 경기도 용인시 처인구 project_period_raw 2021.07~2027.03 project_scale_raw 154/23KV 45/60MVA X 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_ba58f264ee960952
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ba58f264ee960952
Sources EV-75b6b6c37795fd1d40bbae75 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3167c383f5647547c43620d9d67487201e48e1eea1160c37077ec5872a2649d4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2021-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2025-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0345aec15b9881a3 stable_project_id kproj_ba58f264ee960952 source_key 202609|231529|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 고림변전소 건설사업 project_name_detail 154kV 고림S/S 건설사업 region_summary_raw 경기도 용인시 처인구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields 사업 규모 154/23KV 45/60MVA X 2BANK 계획확정 제09차 장기송변전설비계획 반영(2021.07) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2021.11 참여 위원 수 : 14 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ ’21.07 : 제 9차 장기 송변전설비계획 신규반영 □ ’21.11 : 입지선정실무위원회 구성 및 시행 □ ’22.02 : 입지확정위원회 구성 및 시행 □ ’22.04 : 입지확정위원회 결과보고 사업설계 설계용역: 2022.11 ~ 2027.02 기본설계: 2022.06 ~ 2022.08 실시설계: 2022.11 ~ 2026.11 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.06 공사 기간: 2025.05 ~ 2027.03 감독자: [redacted], 실적): 88, 44 [현시점 추진현황] □ '26.11 : 변전 주자재 반입 [향후계획] □ '27.06 : 변전소 준공 및 가압(예정) future_plan_redacted □ 향후계획 [현시점 추진현황] □ '26.11 : 변전 주자재 반입 [향후계획] □ '27.06 : 변전소 준공 및 가압(예정) attachment_count 0 source_detail_sha256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231529|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0345aec15b9881a3
Sources EV-fb03e731b5586260b6c8a582 Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada 행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_ba58f264ee960952 stable_project_key prjtDef:231529:ESB project_definition 231529 first_region_code ESB manual_source_format false project_name 154kV 고림S/S 건설사업 project_name_list 154kV 고림변전소 건설사업 purpose 용인국제물류4.0 물류단지 신규부하 공급 project_region_detail 경기도 용인시 처인구 project_period_raw 2021.07~2027.03 project_scale_raw 154/23KV 45/60MVA X 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_ba58f264ee960952
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ba58f264ee960952
Sources EV-75b6b6c37795fd1d40bbae75 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3167c383f5647547c43620d9d67487201e48e1eea1160c37077ec5872a2649d4 Observations for this power asset History for this project