POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 24items · current page 1–24 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고림S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-75b6b6c37795fd1d40bbae75
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ba58f264ee960952
stable_project_keyprjtDef:231529:ESB
project_definition231529
first_region_codeESB
manual_source_formatfalse
project_name154kV 고림S/S 건설사업
project_name_list154kV 고림변전소 건설사업
purpose용인국제물류4.0 물류단지 신규부하 공급
project_region_detail경기도 용인시 처인구
project_period_raw2021.07~2027.03
project_scale_raw154/23KV 45/60MVA X 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0345aec15b9881a3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_ba58f264ee960952

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ba58f264ee960952

Sources EV-75b6b6c37795fd1d40bbae75
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3167c383f5647547c43620d9d67487201e48e1eea1160c37077ec5872a2649d4
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2021-11
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source schedule candidates · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source snapshots by date · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_0345aec15b9881a3
stable_project_idkproj_ba58f264ee960952
source_key202609|231529|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 고림변전소 건설사업
project_name_detail154kV 고림S/S 건설사업
region_summary_raw경기도 용인시 처인구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 용인국제물류4.0 물류단지 신규부하 공급
Project region
  • 경기도 용인시 처인구
Project period
  • 2021.07~2027.03
사업 규모
  • 154/23KV 45/60MVA X 2BANK
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
  • 제09차 장기송변전설비계획 반영(2021.07)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2021.11 참여 위원 수 : 14 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ ’21.07 : 제 9차 장기 송변전설비계획 신규반영 □ ’21.11 : 입지선정실무위원회 구성 및 시행 □ ’22.02 : 입지확정위원회 구성 및 시행 □ ’22.04 : 입지확정위원회 결과보고
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2022.11 ~ 2027.02 기본설계: 2022.06 ~ 2022.08 실시설계: 2022.11 ~ 2026.11 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.06 공사 기간: 2025.05 ~ 2027.03 감독자: [redacted], 실적): 88, 44
[현시점 추진현황] □ '26.11 : 변전 주자재 반입 [향후계획] □ '27.06 : 변전소 준공 및 가압(예정)
future_plan_redacted□ 향후계획 [현시점 추진현황] □ '26.11 : 변전 주자재 반입 [향후계획] □ '27.06 : 변전소 준공 및 가압(예정)
attachment_count0
source_detail_sha25615bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231529|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0345aec15b9881a3

Sources EV-fb03e731b5586260b6c8a582
Evidence SHA-256 15bb27a0f4ba1cd8009b879b15bb7349efa1369ef63c915e1fc308fe01a54ada
행 SHA-256 4d490a2b9984f90a3aeb420d180d8a9227ee64ff234fc01e772f4d57959c2f53
Source snapshots by date · KOR · kepco_planned

154kV 고림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ba58f264ee960952
stable_project_keyprjtDef:231529:ESB
project_definition231529
first_region_codeESB
manual_source_formatfalse
project_name154kV 고림S/S 건설사업
project_name_list154kV 고림변전소 건설사업
purpose용인국제물류4.0 물류단지 신규부하 공급
project_region_detail경기도 용인시 처인구
project_period_raw2021.07~2027.03
project_scale_raw154/23KV 45/60MVA X 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0345aec15b9881a3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_ba58f264ee960952

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ba58f264ee960952

Sources EV-75b6b6c37795fd1d40bbae75
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3167c383f5647547c43620d9d67487201e48e1eea1160c37077ec5872a2649d4

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel