POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 14items · current page 1–14 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-e5159f9985d0f09f553adcf1
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8913f7ca8072b281
stable_project_keyprjtDef:234585:ESB
project_definition234585
first_region_codeESB
manual_source_formatfalse
project_name154kV 계림-일곡 2차 전력구 건설사업
project_name_list광주지역 전기공급시설 전력구공사(계림-일곡2차)
purpose계림S/S-일곡S/S 계통보강
project_region_detail전남광주통합특별시 북구
project_period_raw2019.10~2024.12
project_scale_raw관로 1,464M, 메사쉴드 59M, 세미쉴드 119M
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type전력구
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7d0fb75611b6f544
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_8913f7ca8072b281

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8913f7ca8072b281

Sources EV-e5159f9985d0f09f553adcf1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 523e1b06946f8d613b2d3caa377f21a8e56afacdb24065a6ef26b848d3278b4f
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02-28
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2019-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2022-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-03-31
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2022-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2024-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2021-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2021-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source schedule candidates · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234585|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source snapshots by date · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_7d0fb75611b6f544
stable_project_idkproj_8913f7ca8072b281
source_key202609|234585|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list광주지역 전기공급시설 전력구공사(계림-일곡2차)
project_name_detail154kV 계림-일곡 2차 전력구 건설사업
region_summary_raw전남광주통합특별시 북구등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 계림S/S-일곡S/S 계통보강
Project region
  • 전남광주통합특별시 북구
Project period
  • 2019.10~2024.12
사업 규모
  • 관로 1,464M, 메사쉴드 59M, 세미쉴드 119M
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2021.07 공사 기간: 2021.07 ~ 2026.02 감독자: [redacted], 실적): 100, 0
1. 진행경과 □ ‘21.07 : 공사 착공 □ ‘21.12 : 발진수직구 조성중 집단민원 발생으로 인한 공사중지 □ ‘22.02 : 집단민원 해결을 위한 경과지 변경설계 착수 □ ‘22.11 : 경과지 변경설계 완료 및 설계변경 시행, 공사 재개 □ ‘24. 05 : 메사쉴드 구간 지장물(옹벽 강관말뚝) 간섭에 따른 설계변경 추진 □ ‘24. 07 현재 : 터널(메사쉴드) 구간 공법변경 관계자회의 시행 및 실시설계 시행 □ ’24. 08 : 수직구#2 굴착 및 세미쉴드 장비 반입 준비 □ ’24. 09 : 터널(메사쉴드) 구간 관통을 위한 강관압입 시공 완료(L=12m, 2EA) □ ’24. 11 : 터널(메사쉴드) 굴착완료(L=47m) 및 세미쉴드 굴진 중 □ ’24. 12 : 터널(세미쉴드) 굴진완료(L=119m) □ ’25. 02 : 메사쉴드 터널 2차라이닝 및 수직구 구조물공 작업 중 □ ’25. 03 : 수직구#2 인근 주택가 집단민원 발생 및 대응 □ ’25. 05 : 집단민원 대응을 위한 안전진단 용역 시행 □ ’25. 06 현재 : 민원발생 구간 안전진단 결과 초안 도출 □ ’25. 08 피해범위(주민측 요구사항 포함) 관련된 피해보상금액 산출 완료 □ ’25. 08 피해보상금액 산출서 주민측에 발송 □ ’25. 09 피해보상을 위한 주민측과 지속적인 협의 중 □ ’25. 12 : 공사기간 변경(∼26.2.28) □ ’25. 12 : 민원 관련 공사기간 변경(∼26.3.31) □ ’26. 03 : 공사 중지(사유 : 민원 미해소로 준공 인수 여건 미확보) 2. 향후계획 □ 민원해소 완료 후 준공 시
future_plan_redacted□ 향후계획 1. 진행경과 □ ‘21.07 : 공사 착공 □ ‘21.12 : 발진수직구 조성중 집단민원 발생으로 인한 공사중지 □ ‘22.02 : 집단민원 해결을 위한 경과지 변경설계 착수 □ ‘22.11 : 경과지 변경설계 완료 및 설계변경 시행, 공사 재개 □ ‘24. 05 : 메사쉴드 구간 지장물(옹벽 강관말뚝) 간섭에 따른 설계변경 추진 □ ‘24. 07 현재 : 터널(메사쉴드) 구간 공법변경 관계자회의 시행 및 실시설계 시행 □ ’24. 08 : 수직구#2 굴착 및 세미쉴드 장비 반입 준비 □ ’24. 09 : 터널(메사쉴드) 구간 관통을 위한 강관압입 시공 완료(L=12m, 2EA) □ ’24. 11 : 터널(메사쉴드) 굴착완료(L=47m) 및 세미쉴드 굴진 중 □ ’24. 12 : 터널(세미쉴드) 굴진완료(L=119m) □ ’25. 02 : 메사쉴드 터널 2차라이닝 및 수직구 구조물공 작업 중 □ ’25. 03 : 수직구#2 인근 주택가 집단민원 발생 및 대응 □ ’25. 05 : 집단민원 대응을 위한 안전진단 용역 시행 □ ’25. 06 현재 : 민원발생 구간 안전진단 결과 초안 도출 □ ’25. 08 피해범위(주민측 요구사항 포함) 관련된 피해보상금액 산출 완료 □ ’25. 08 피해보상금액 산출서 주민측에 발송 □ ’25. 09 피해보상을 위한 주민측과 지속적인 협의 중 □ ’25. 12 : 공사기간 변경(∼26.2.28) □ ’25. 12 : 민원 관련 공사기간 변경(∼26.3.31) □ ’26. 03 : 공사 중지(사유 : 민원 미해소로 준공 인수 여건 미확보) 2. 향후계획 □ 민원해소 완료 후 준공 시
attachment_count0
source_detail_sha2569efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234585|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d0fb75611b6f544

Sources EV-41ddd7b13f8d1f2c9824663d
Evidence SHA-256 9efe4fa348a459a1e39296589d11cf5877e2da4f415ba43861b0464279bd45a5
행 SHA-256 01ed48120f0bb5dedcbac04c92d24d8459b142e4f8835487b18d10c291e0cf5a
Source snapshots by date · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8913f7ca8072b281
stable_project_keyprjtDef:234585:ESB
project_definition234585
first_region_codeESB
manual_source_formatfalse
project_name154kV 계림-일곡 2차 전력구 건설사업
project_name_list광주지역 전기공급시설 전력구공사(계림-일곡2차)
purpose계림S/S-일곡S/S 계통보강
project_region_detail전남광주통합특별시 북구
project_period_raw2019.10~2024.12
project_scale_raw관로 1,464M, 메사쉴드 59M, 세미쉴드 119M
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type전력구
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7d0fb75611b6f544
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_8913f7ca8072b281

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8913f7ca8072b281

Sources EV-e5159f9985d0f09f553adcf1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 523e1b06946f8d613b2d3caa377f21a8e56afacdb24065a6ef26b848d3278b4f

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel