POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 14items · current page 1–14 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b5ac17f14af1f9d9de405b93
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_aa84f01c9a19c122
stable_project_keyprjtDef:232570:ESB
project_definition232570
first_region_codeESB
manual_source_formatfalse
project_name154kV 고경분기T/L 건설사업
project_name_list154kV 고경분기 송전선로 건설사업
purpose영천 고경일반산업단지 전력공급을 위함.
project_region_detailYeongcheon City, North Gyeongsang Province
project_period_raw2021.09~2026.10
project_scale_raw154KV ACSR 330㎟ × S × 2C, 0.453KM
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0adfe6ca8a27b59e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_aa84f01c9a19c122

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_aa84f01c9a19c122

Sources EV-b5ac17f14af1f9d9de405b93
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8169f1bb377e0e70b11ef1b1ef1ab4277f0674d691f4f4f093c39f4c7b4d9e71
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-09
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source schedule candidates · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232570|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source snapshots by date · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_0adfe6ca8a27b59e
stable_project_idkproj_aa84f01c9a19c122
source_key202609|232570|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 고경분기 송전선로 건설사업
project_name_detail154kV 고경분기T/L 건설사업
region_summary_raw경상북도 영천시등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 영천 고경일반산업단지 전력공급을 위함.
Project region
  • Yeongcheon City, North Gyeongsang Province
Project period
  • 2021.09~2026.10
사업 규모
  • 154KV ACSR 330㎟ × S × 2C, 0.453KM
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.08
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ '24.08 : 입지확정
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2024.10 ~ 2025.10 기본설계: 2024.11 ~ 2024.12 실시설계: 2025.03 ~ 2025.04 설계담당자: [redacted]
□ '26.10 : 공사준공
future_plan_redacted□ 향후계획 □ '26.10 : 공사준공
attachment_count0
source_detail_sha256d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232570|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0adfe6ca8a27b59e

Sources EV-ed6f32ad06119d7d1b22b2b3
Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab
행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45
Source snapshots by date · KOR · kepco_planned

154kV 고경분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_aa84f01c9a19c122
stable_project_keyprjtDef:232570:ESB
project_definition232570
first_region_codeESB
manual_source_formatfalse
project_name154kV 고경분기T/L 건설사업
project_name_list154kV 고경분기 송전선로 건설사업
purpose영천 고경일반산업단지 전력공급을 위함.
project_region_detailYeongcheon City, North Gyeongsang Province
project_period_raw2021.09~2026.10
project_scale_raw154KV ACSR 330㎟ × S × 2C, 0.453KM
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0adfe6ca8a27b59e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_aa84f01c9a19c122

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_aa84f01c9a19c122

Sources EV-b5ac17f14af1f9d9de405b93
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8169f1bb377e0e70b11ef1b1ef1ab4277f0674d691f4f4f093c39f4c7b4d9e71

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel