POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 14items · current page 1–14 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b5ac17f14af1f9d9de405b93
Detailed source fields Original source field Published value or condition stable_project_id kproj_aa84f01c9a19c122 stable_project_key prjtDef:232570:ESB project_definition 232570 first_region_code ESB manual_source_format false project_name 154kV 고경분기T/L 건설사업 project_name_list 154kV 고경분기 송전선로 건설사업 purpose 영천 고경일반산업단지 전력공급을 위함. project_region_detail Yeongcheon City, North Gyeongsang Province project_period_raw 2021.09~2026.10 project_scale_raw 154KV ACSR 330㎟ × S × 2C, 0.453KM responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_aa84f01c9a19c122
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_aa84f01c9a19c122
Sources EV-b5ac17f14af1f9d9de405b93 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8169f1bb377e0e70b11ef1b1ef1ab4277f0674d691f4f4f093c39f4c7b4d9e71 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232570|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0adfe6ca8a27b59e stable_project_id kproj_aa84f01c9a19c122 source_key 202609|232570|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 고경분기 송전선로 건설사업 project_name_detail 154kV 고경분기T/L 건설사업 region_summary_raw 경상북도 영천시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields Project region Yeongcheon City, North Gyeongsang Province 사업 규모 154KV ACSR 330㎟ × S × 2C, 0.453KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.08 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2024.10 ~ 2025.10 기본설계: 2024.11 ~ 2024.12 실시설계: 2025.03 ~ 2025.04 설계담당자: [redacted] future_plan_redacted □ 향후계획 □ '26.10 : 공사준공 attachment_count 0 source_detail_sha256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232570|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0adfe6ca8a27b59e
Sources EV-ed6f32ad06119d7d1b22b2b3 Evidence SHA-256 d262250ee7385f56defca13b464745f38d6eca241c8fbeb49f17d55e82caf2ab 행 SHA-256 669d47a7aad69ad4469d5f46e2eae5bc398bcec928908b3431713d26c9af6a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_aa84f01c9a19c122 stable_project_key prjtDef:232570:ESB project_definition 232570 first_region_code ESB manual_source_format false project_name 154kV 고경분기T/L 건설사업 project_name_list 154kV 고경분기 송전선로 건설사업 purpose 영천 고경일반산업단지 전력공급을 위함. project_region_detail Yeongcheon City, North Gyeongsang Province project_period_raw 2021.09~2026.10 project_scale_raw 154KV ACSR 330㎟ × S × 2C, 0.453KM responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_aa84f01c9a19c122
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_aa84f01c9a19c122
Sources EV-b5ac17f14af1f9d9de405b93 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8169f1bb377e0e70b11ef1b1ef1ab4277f0674d691f4f4f093c39f4c7b4d9e71 Observations for this power asset History for this project