Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 21items · current page 1–21 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고경S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-5fe61056c0c177e31f39a9c1
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_25548a4c9686344b
stable_project_keyprjtDef:231524:ESB
project_definition231524
first_region_codeESB
manual_source_formatfalse
project_name154kV 고경S/S 건설사업
project_name_list154kV 고경S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detailYeongcheon City, North Gyeongsang Province
project_period_raw2021.10~2026.10
project_scale_raw154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d7e6811f5804484d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_25548a4c9686344b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_25548a4c9686344b

Sources EV-5fe61056c0c177e31f39a9c1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 53c3dfdc1f8e661d9ee1bcbbf7a5c1336ff3a507741179e9606fe76bb7764b2d
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source schedule candidates · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231524|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source snapshots by date · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d7e6811f5804484d
stable_project_idkproj_25548a4c9686344b
source_key202609|231524|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 고경S/S 건설사업
project_name_detail154kV 고경S/S 건설사업
region_summary_raw경상북도 영천시등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • Yeongcheon City, North Gyeongsang Province
Project period
  • 2021.10~2026.10
사업 규모
  • 154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2023.03 참여 위원 수 : 11 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2024.08 ~ 2024.09 실시설계: 설계담당자: [redacted]
[진행경과] □ '21.10 : 제9차 장기 송변전설비계획 신규사업 반영 □ '23.10 : 부지확정 보고(영천 고경일반산업단지 내) □ '24.09 : 기본설계 완료 및 용지매수 의뢰 □ '24.11 : 변전주자재 발주 및 계약 □ '25.08 : 산단시행사 부지조성 관련 업무회의 시행 □ '25.12 : 25년 4분기 PMO 회의 시행(준공목표조정 검토('26.10 → '27.10)) [향후계획] □ '25.06 : 실시설계 완료 □ '26.10 : 변전공사 착공 □ '27.10 : 변전소 가압 및 준공
future_plan_redacted□ 향후계획 [진행경과] □ '21.10 : 제9차 장기 송변전설비계획 신규사업 반영 □ '23.10 : 부지확정 보고(영천 고경일반산업단지 내) □ '24.09 : 기본설계 완료 및 용지매수 의뢰 □ '24.11 : 변전주자재 발주 및 계약 □ '25.08 : 산단시행사 부지조성 관련 업무회의 시행 □ '25.12 : 25년 4분기 PMO 회의 시행(준공목표조정 검토('26.10 → '27.10)) [향후계획] □ '25.06 : 실시설계 완료 □ '26.10 : 변전공사 착공 □ '27.10 : 변전소 가압 및 준공
attachment_count0
source_detail_sha256f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231524|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7e6811f5804484d

Sources EV-df3cd4980dc3d6ee6c10b73f
Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258
행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089
Source snapshots by date · KOR · kepco_planned

154kV 고경S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_25548a4c9686344b
stable_project_keyprjtDef:231524:ESB
project_definition231524
first_region_codeESB
manual_source_formatfalse
project_name154kV 고경S/S 건설사업
project_name_list154kV 고경S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detailYeongcheon City, North Gyeongsang Province
project_period_raw2021.10~2026.10
project_scale_raw154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d7e6811f5804484d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_25548a4c9686344b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_25548a4c9686344b

Sources EV-5fe61056c0c177e31f39a9c1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 53c3dfdc1f8e661d9ee1bcbbf7a5c1336ff3a507741179e9606fe76bb7764b2d

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel