POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 21items · current page 1–21 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-5fe61056c0c177e31f39a9c1
Detailed source fields Original source field Published value or condition stable_project_id kproj_25548a4c9686344b stable_project_key prjtDef:231524:ESB project_definition 231524 first_region_code ESB manual_source_format false project_name 154kV 고경S/S 건설사업 project_name_list 154kV 고경S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail Yeongcheon City, North Gyeongsang Province project_period_raw 2021.10~2026.10 project_scale_raw 154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_25548a4c9686344b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_25548a4c9686344b
Sources EV-5fe61056c0c177e31f39a9c1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 53c3dfdc1f8e661d9ee1bcbbf7a5c1336ff3a507741179e9606fe76bb7764b2d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231524|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_d7e6811f5804484d stable_project_id kproj_25548a4c9686344b source_key 202609|231524|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 고경S/S 건설사업 project_name_detail 154kV 고경S/S 건설사업 region_summary_raw 경상북도 영천시등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project region Yeongcheon City, North Gyeongsang Province 사업 규모 154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2023.03 참여 위원 수 : 11 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2024.08 ~ 2024.09 실시설계: 설계담당자: [redacted] [진행경과] □ '21.10 : 제9차 장기 송변전설비계획 신규사업 반영 □ '23.10 : 부지확정 보고(영천 고경일반산업단지 내) □ '24.09 : 기본설계 완료 및 용지매수 의뢰 □ '24.11 : 변전주자재 발주 및 계약 □ '25.08 : 산단시행사 부지조성 관련 업무회의 시행 □ '25.12 : 25년 4분기 PMO 회의 시행(준공목표조정 검토('26.10 → '27.10)) [향후계획] □ '25.06 : 실시설계 완료 □ '26.10 : 변전공사 착공 □ '27.10 : 변전소 가압 및 준공 future_plan_redacted □ 향후계획 [진행경과] □ '21.10 : 제9차 장기 송변전설비계획 신규사업 반영 □ '23.10 : 부지확정 보고(영천 고경일반산업단지 내) □ '24.09 : 기본설계 완료 및 용지매수 의뢰 □ '24.11 : 변전주자재 발주 및 계약 □ '25.08 : 산단시행사 부지조성 관련 업무회의 시행 □ '25.12 : 25년 4분기 PMO 회의 시행(준공목표조정 검토('26.10 → '27.10)) [향후계획] □ '25.06 : 실시설계 완료 □ '26.10 : 변전공사 착공 □ '27.10 : 변전소 가압 및 준공 attachment_count 0 source_detail_sha256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231524|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7e6811f5804484d
Sources EV-df3cd4980dc3d6ee6c10b73f Evidence SHA-256 f26dc4c1ef089425ed20c8f6aab265e4dd8a56c4803fb32e332ec4bd35718258 행 SHA-256 59399f2e1f046d146a20ae11479b19a4d055d44a8616a47eac017e1d3a8cd089 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_25548a4c9686344b stable_project_key prjtDef:231524:ESB project_definition 231524 first_region_code ESB manual_source_format false project_name 154kV 고경S/S 건설사업 project_name_list 154kV 고경S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail Yeongcheon City, North Gyeongsang Province project_period_raw 2021.10~2026.10 project_scale_raw 154KV 10MVA*3대 2BANK, 154KV 10CCT, 23KV 10CCT responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_25548a4c9686344b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_25548a4c9686344b
Sources EV-5fe61056c0c177e31f39a9c1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 53c3dfdc1f8e661d9ee1bcbbf7a5c1336ff3a507741179e9606fe76bb7764b2d Observations for this power asset History for this project