Power assets and projects · KOR · kepco_planned

154kV 강일#2S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-ab978c9d5b102f1074194618
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_6d2e8f78d9fb56e8
stable_project_keyprjtDef:231521:ESB
project_definition231521
first_region_codeESB
manual_source_formatfalse
project_name154kV 강일#2S/S 건설사업
project_name_list154kV 강일#2(가칭)S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail서울특별시 강동구
project_period_raw
project_scale_rawM.TR 60MVAX2BANK(최종 4BANK)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_1cd7684ed622cb34
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_6d2e8f78d9fb56e8

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_6d2e8f78d9fb56e8

Sources EV-ab978c9d5b102f1074194618
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 78f8075a5d25c3ff9e1d82babf9205ee821fe6a8d5bb681e865a3cd0c9a7df1f
Source snapshots by date · KOR · kepco_planned

154kV 강일#2S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_1cd7684ed622cb34
stable_project_idkproj_6d2e8f78d9fb56e8
source_key202609|231521|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 강일#2(가칭)S/S 건설사업
project_name_detail154kV 강일#2S/S 건설사업
region_summary_raw서울특별시 강동구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 서울특별시 강동구
Project period
사업 규모
  • M.TR 60MVAX2BANK(최종 4BANK)
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
□ 추진 계획 ○ ‘26.08 : 부지확정 완료(대체부지 이전 검토중) ○ ‘28.05 : 용지매수 완료 ○ ‘29.05 : 착공(토건/변전) ○ ‘31.04 : 변전소 가압
future_plan_redacted□ 향후계획 □ 추진 계획 ○ ‘26.08 : 부지확정 완료(대체부지 이전 검토중) ○ ‘28.05 : 용지매수 완료 ○ ‘29.05 : 착공(토건/변전) ○ ‘31.04 : 변전소 가압
attachment_count0
source_detail_sha2565badbcc8d4ebd14ef2f8d1a38b6b14ce00c8d2aa94dfc23ab0256dcf3aaad2ea
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231521|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1cd7684ed622cb34

Sources EV-7e7dd392d637e250191a283d
Evidence SHA-256 5badbcc8d4ebd14ef2f8d1a38b6b14ce00c8d2aa94dfc23ab0256dcf3aaad2ea
행 SHA-256 6811c3b98ee6dfed019689204897ccfe61cf19c613fddf995a6dd7a996d21611
Source snapshots by date · KOR · kepco_planned

154kV 강일#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_6d2e8f78d9fb56e8
stable_project_keyprjtDef:231521:ESB
project_definition231521
first_region_codeESB
manual_source_formatfalse
project_name154kV 강일#2S/S 건설사업
project_name_list154kV 강일#2(가칭)S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail서울특별시 강동구
project_period_raw
project_scale_rawM.TR 60MVAX2BANK(최종 4BANK)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_1cd7684ed622cb34
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_6d2e8f78d9fb56e8

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_6d2e8f78d9fb56e8

Sources EV-ab978c9d5b102f1074194618
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 78f8075a5d25c3ff9e1d82babf9205ee821fe6a8d5bb681e865a3cd0c9a7df1f

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel