POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 17items · current page 1–17 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-5ed5a320791bcd6cc7cb6ca2
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_89d819f8d107ace9
stable_project_keyprjtDef:234623:ESB
project_definition234623
first_region_codeESB
manual_source_formatfalse
project_name154kV 걸포(고천)분기 전력구 건설사업
project_name_list154kV 걸포(고천)분기 전력구 건설사업
purpose김포 동남부지역 전력공급능력확보
project_region_detail경기도 김포시
project_period_raw2024.07~2030.06
project_scale_rawSHIELD TBM 1,025M, 관로 3,029M
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_180d258a8e99367f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_89d819f8d107ace9

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_89d819f8d107ace9

Sources EV-5ed5a320791bcd6cc7cb6ca2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f09bc16243ae5597e65398923f74315519fa0c198899d7ee35525cb8ad6a4338
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2024-11-13
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12-18
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03-25
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source schedule candidates · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06-09
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234623|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source snapshots by date · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_180d258a8e99367f
stable_project_idkproj_89d819f8d107ace9
source_key202609|234623|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 걸포(고천)분기 전력구 건설사업
project_name_detail154kV 걸포(고천)분기 전력구 건설사업
region_summary_raw경기도 김포시등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 김포 동남부지역 전력공급능력확보
Project region
  • 경기도 김포시
Project period
  • 2024.07~2030.06
사업 규모
  • SHIELD TBM 1,025M, 관로 3,029M
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2024.11 ~ 2026.05 기본설계: 2024.11 ~ 2025.10 실시설계: 2025.10 ~ 2026.03 설계담당자: [redacted]
- ‘21. 5.12 : 현장 답사분석 및 결과보고(→송변전건설처) - ‘21. 6. 3 : 기본계획 수립 및 본 선로 관련 내용 알림 계통계획처 주관 T/F에서 최종 선로 시행방안 결정 시까지 설계용역 발주 보류(고객사인 스마일게이트의 직접시공 여부 결정) - ‘22. 5. : (고객) "고객 先시공, 한전 後인수" 방식 건설협업 요청 - `23. 5.31 : (김포시) 전자파 등 민원사유로 데이터센터사업 산단 제외 - `23. 8. : (한전) 지자체 미협조에 따른 협약 취소 공문 송부(→스마일) - `23.12. : (고객) 국회의원 선거 이후로 건설협약취소 결정 연기 요청 - `24. 4.17 : (고객) 건설협약 결정 여부 24년 2분기로 연기 요청 - ‘24. 4.23 : (계통계획처) 고객-한전 건설협업 관련 회의 시행 내용 : 김포시의 데이터센터 부정적의견 + 산단 전력공급 필요 - ‘24. 5. 9 : 계통(정책)-412 「고객-한전 건설협업 추진 검토결과 알림」 내용 : 걸포분기 전력구공사 설계용역 발주 등 사업 착수 - ’24. 7.25 : 걸포분기 전력구공사 설계용역 시행 - ‘24.11.13 : 걸포분기 전력구공사 설계용역 착수 - ‘25. 7.16 : 걸포분기 전력구공사 기본설계심의 시행 - ’25.12.18 : 걸포분기 전력구공사 실시설계심의 시행 - ‘26.03.25 : 걸포분기 전력구공사 시행품의 - ’26.06.09 : 걸포분기 전력구공사 입찰공고 시행('26.10 착공예정)
future_plan_redacted□ 향후계획 - ‘21. 5.12 : 현장 답사분석 및 결과보고(→송변전건설처) - ‘21. 6. 3 : 기본계획 수립 및 본 선로 관련 내용 알림 계통계획처 주관 T/F에서 최종 선로 시행방안 결정 시까지 설계용역 발주 보류(고객사인 스마일게이트의 직접시공 여부 결정) - ‘22. 5. : (고객) "고객 先시공, 한전 後인수" 방식 건설협업 요청 - `23. 5.31 : (김포시) 전자파 등 민원사유로 데이터센터사업 산단 제외 - `23. 8. : (한전) 지자체 미협조에 따른 협약 취소 공문 송부(→스마일) - `23.12. : (고객) 국회의원 선거 이후로 건설협약취소 결정 연기 요청 - `24. 4.17 : (고객) 건설협약 결정 여부 24년 2분기로 연기 요청 - ‘24. 4.23 : (계통계획처) 고객-한전 건설협업 관련 회의 시행 내용 : 김포시의 데이터센터 부정적의견 + 산단 전력공급 필요 - ‘24. 5. 9 : 계통(정책)-412 「고객-한전 건설협업 추진 검토결과 알림」 내용 : 걸포분기 전력구공사 설계용역 발주 등 사업 착수 - ’24. 7.25 : 걸포분기 전력구공사 설계용역 시행 - ‘24.11.13 : 걸포분기 전력구공사 설계용역 착수 - ‘25. 7.16 : 걸포분기 전력구공사 기본설계심의 시행 - ’25.12.18 : 걸포분기 전력구공사 실시설계심의 시행 - ‘26.03.25 : 걸포분기 전력구공사 시행품의 - ’26.06.09 : 걸포분기 전력구공사 입찰공고 시행('26.10 착공예정)
attachment_count0
source_detail_sha25634ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234623|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_180d258a8e99367f

Sources EV-80ede9275a5a16a35074d372
Evidence SHA-256 34ae3d950610c8d9fa35f3c8413850707142696a41891cb75ead29ccec7cfb67
행 SHA-256 10d57e7c7f8b55cf61b3ee9027f608fb877af578442dd9dbbf905816d6e02c09
Source snapshots by date · KOR · kepco_planned

154kV 걸포(고천)분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_89d819f8d107ace9
stable_project_keyprjtDef:234623:ESB
project_definition234623
first_region_codeESB
manual_source_formatfalse
project_name154kV 걸포(고천)분기 전력구 건설사업
project_name_list154kV 걸포(고천)분기 전력구 건설사업
purpose김포 동남부지역 전력공급능력확보
project_region_detail경기도 김포시
project_period_raw2024.07~2030.06
project_scale_rawSHIELD TBM 1,025M, 관로 3,029M
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_180d258a8e99367f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_89d819f8d107ace9

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_89d819f8d107ace9

Sources EV-5ed5a320791bcd6cc7cb6ca2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f09bc16243ae5597e65398923f74315519fa0c198899d7ee35525cb8ad6a4338

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel