POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 가능S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-7b15b2bcf129ab26701cc517
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_70291f3ae8537aef
stable_project_keyprjtDef:231726:ESB
project_definition231726
first_region_codeESB
manual_source_formatfalse
project_name154kV 가능S/S 건설사업
project_name_list154kV 가능변전소 건설사업
purpose인근 변전소 공급능력 포화 및 부하분담
project_region_detailUijeongbu, Gyeonggi Province
project_period_raw2025.05~2031.04
project_scale_raw154KV M.TR 60MVA X 2BANK
responsible_office_raw경인건설본부/직할
equipment_type변전
headquarters경인건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_21ece8c8b0273752
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_70291f3ae8537aef

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_70291f3ae8537aef

Sources EV-7b15b2bcf129ab26701cc517
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9c6e852e33d64c29ef6c279d6e4d30232344ac949c53e4887271874b1189861c
Source schedule candidates · KOR · kepco_planned

154kV 가능S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231726|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_21ece8c8b0273752

Sources EV-f8ebeda8f64c4b6a46e981aa
Evidence SHA-256 f8514f682fd2d79081522f51cce4c8ea7af5335f2de6adf5c1735c487fbd68e1
행 SHA-256 ee1e8a164b97563af59b235ebbc3f7fc82fc657f5b8fb39009e55bbe97d0bece
Source schedule candidates · KOR · kepco_planned

154kV 가능S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231726|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_21ece8c8b0273752

Sources EV-f8ebeda8f64c4b6a46e981aa
Evidence SHA-256 f8514f682fd2d79081522f51cce4c8ea7af5335f2de6adf5c1735c487fbd68e1
행 SHA-256 ee1e8a164b97563af59b235ebbc3f7fc82fc657f5b8fb39009e55bbe97d0bece
Source snapshots by date · KOR · kepco_planned

154kV 가능S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_21ece8c8b0273752
stable_project_idkproj_70291f3ae8537aef
source_key202609|231726|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 가능변전소 건설사업
project_name_detail154kV 가능S/S 건설사업
region_summary_raw경기도 의정부시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 인근 변전소 공급능력 포화 및 부하분담
Project region
  • Uijeongbu, Gyeonggi Province
Project period
  • 2025.05~2031.04
사업 규모
  • 154KV M.TR 60MVA X 2BANK
담당 사업소
  • 경인건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ 없음
□ '25.05 : 제11차 장기송변전설비계획 반영 □ '29.05 : 토건공사 착공(예정) □ '31.04 : 변전소 최초 가압(예정) (※ 상기 일정은 변동될 수 있음)
future_plan_redacted□ 향후계획 □ '25.05 : 제11차 장기송변전설비계획 반영 □ '29.05 : 토건공사 착공(예정) □ '31.04 : 변전소 최초 가압(예정) (※ 상기 일정은 변동될 수 있음)
attachment_count0
source_detail_sha256f8514f682fd2d79081522f51cce4c8ea7af5335f2de6adf5c1735c487fbd68e1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231726|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_21ece8c8b0273752

Sources EV-f8ebeda8f64c4b6a46e981aa
Evidence SHA-256 f8514f682fd2d79081522f51cce4c8ea7af5335f2de6adf5c1735c487fbd68e1
행 SHA-256 ee1e8a164b97563af59b235ebbc3f7fc82fc657f5b8fb39009e55bbe97d0bece
Source snapshots by date · KOR · kepco_planned

154kV 가능S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_70291f3ae8537aef
stable_project_keyprjtDef:231726:ESB
project_definition231726
first_region_codeESB
manual_source_formatfalse
project_name154kV 가능S/S 건설사업
project_name_list154kV 가능변전소 건설사업
purpose인근 변전소 공급능력 포화 및 부하분담
project_region_detailUijeongbu, Gyeonggi Province
project_period_raw2025.05~2031.04
project_scale_raw154KV M.TR 60MVA X 2BANK
responsible_office_raw경인건설본부/직할
equipment_type변전
headquarters경인건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_21ece8c8b0273752
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_70291f3ae8537aef

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_70291f3ae8537aef

Sources EV-7b15b2bcf129ab26701cc517
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9c6e852e33d64c29ef6c279d6e4d30232344ac949c53e4887271874b1189861c

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel