Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 가능S/S 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7b15b2bcf129ab26701cc517
Sources EV-f8ebeda8f64c4b6a46e981aa Evidence SHA-256 f8514f682fd2d79081522f51cce4c8ea7af5335f2de6adf5c1735c487fbd68e1 행 SHA-256 ee1e8a164b97563af59b235ebbc3f7fc82fc657f5b8fb39009e55bbe97d0beceSource snapshots by date · KOR · kepco_planned
154kV 가능S/S 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_21ece8c8b0273752
stable_project_id
kproj_70291f3ae8537aef
source_key
202609|231726|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 가능변전소 건설사업
project_name_detail
154kV 가능S/S 건설사업
region_summary_raw
경기도 의정부시등 1 지역
equipment_type_raw
변전
headquarters_raw
경인건설본부
office_raw
직할
section_fields
Project purpose
인근 변전소 공급능력 포화 및 부하분담
Project region
Uijeongbu, Gyeonggi Province
Project period
2025.05~2031.04
사업 규모
154KV M.TR 60MVA X 2BANK
담당 사업소
경인건설본부/직할
계획확정
제11차 장기송변전설비계획 반영(2025.05)
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-f8ebeda8f64c4b6a46e981aa Evidence SHA-256 f8514f682fd2d79081522f51cce4c8ea7af5335f2de6adf5c1735c487fbd68e1 행 SHA-256 ee1e8a164b97563af59b235ebbc3f7fc82fc657f5b8fb39009e55bbe97d0beceSource snapshots by date · KOR · kepco_planned