POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 34items · current page 1–34 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-71f26849ce89934bbda75437
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_01b051ea42cc6707
stable_project_keyprjtDef:232621:ESB
project_definition232621
first_region_codeESB
manual_source_formatfalse
project_name154kV 거창#2분기T/L 건설사업
project_name_list154kV 거창#2분기송전선로 건설사업
purpose거창 신재생E 연계용량 초과 해소를 위한 계통연계
project_region_detail경상남도 거창군
project_period_raw2024.08~2031.12
project_scale_rawACSR 330×S×4C×5.8KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b9b8663eeccc8bb9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_01b051ea42cc6707

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_01b051ea42cc6707

Sources EV-71f26849ce89934bbda75437
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 818880e05ac91a71ddb7cf3c66ce20d3a4e04bbbbe69223555a070c96d46714a
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-08
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source schedule candidates · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source snapshots by date · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b9b8663eeccc8bb9
stable_project_idkproj_01b051ea42cc6707
source_key202609|232621|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 거창#2분기송전선로 건설사업
project_name_detail154kV 거창#2분기T/L 건설사업
region_summary_raw경상남도 거창군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 거창 신재생E 연계용량 초과 해소를 위한 계통연계
Project region
  • 경상남도 거창군
Project period
  • 2024.08~2031.12
사업 규모
  • ACSR 330×S×4C×5.8KM
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2024.09 입지선정위원회 구성시기: 2025.07 참여 위원 수 : 15 지장유무 조회: 2026.01~2026.02 경과지(부지) 확정: 2026.04
환경/재해 영향평가
  • 환경영향평가: 2026.04 ~ 재해영향평가: 2026.04 ~
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • line ㅇ '25.07 : 입지선정위원 구성 완료 ㅇ '25.07 : 입지선정위원회 1차 회의 시행 ㅇ '25.09 : 입지선정위원회 2차 회의 시행 ㅇ '25.11 : 입지선정위원회 3차 회의 시행 ㅇ '25.12 : 입지선정위원회 4차 회의 시행 ㅇ '26.03 : 입지선정위원회 5차 회의 시행(최적 경과지 선정) ㅇ '26.04 : 입지확정위원회 시
□ 진행경과 ㅇ '23.05 : 제10차 장기송변전 설비계획 반영 ㅇ '24.07 : 전력영향평가 용역 계약 의뢰(거창#2S/S 포함) ㅇ '24.09 : 전력영향평가 용역 착수 ㅇ '25.04 : 입지선정위원회 위원 추천 요청(→ 거창군) ㅇ '25.07 : 입지선정위원 구성 완료 ㅇ '25.07 : 입지선정위원회 1차 회의 시행 ㅇ '25.09 : 입지선정위원회 2차 회의 시행 ㅇ '25.11 : 입지선정위원회 3차 회의 시행 ㅇ '25.12 : 입지선정위원회 4차 회의 시행 ㅇ '26.03 : 입지선정위원회 5차 회의 시행(최적 경과지 선정) ㅇ '26.04 : 입지확정위원회 시행 ㅇ '26.06 : 변전소 부지 및 송전선로 경과지 설계 측량 ㅇ '26.06 : 환경영향평가 및 재해영향평가 용역 중지 사유: 용역(설계 및 측량) 미완료 □ 향후계획 ㅇ '27.05 : 실시계획 승인신청
future_plan_redacted□ 향후계획 □ 진행경과 ㅇ '23.05 : 제10차 장기송변전 설비계획 반영 ㅇ '24.07 : 전력영향평가 용역 계약 의뢰(거창#2S/S 포함) ㅇ '24.09 : 전력영향평가 용역 착수 ㅇ '25.04 : 입지선정위원회 위원 추천 요청(→ 거창군) ㅇ '25.07 : 입지선정위원 구성 완료 ㅇ '25.07 : 입지선정위원회 1차 회의 시행 ㅇ '25.09 : 입지선정위원회 2차 회의 시행 ㅇ '25.11 : 입지선정위원회 3차 회의 시행 ㅇ '25.12 : 입지선정위원회 4차 회의 시행 ㅇ '26.03 : 입지선정위원회 5차 회의 시행(최적 경과지 선정) ㅇ '26.04 : 입지확정위원회 시행 ㅇ '26.06 : 변전소 부지 및 송전선로 경과지 설계 측량 ㅇ '26.06 : 환경영향평가 및 재해영향평가 용역 중지 사유: 용역(설계 및 측량) 미완료 □ 향후계획 ㅇ '27.05 : 실시계획 승인신청
attachment_count0
source_detail_sha25657626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232621|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b9b8663eeccc8bb9

Sources EV-fd989400dee9d817b03a3528
Evidence SHA-256 57626d1d50bc31ae5bdb613061f082edd7e98b1882d541815ac1618e89f29e84
행 SHA-256 e0224bdad3e6d311544c545dbef631554996586dc7a1180f5c2bf1bdc3378c62
Source snapshots by date · KOR · kepco_planned

154kV 거창#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_01b051ea42cc6707
stable_project_keyprjtDef:232621:ESB
project_definition232621
first_region_codeESB
manual_source_formatfalse
project_name154kV 거창#2분기T/L 건설사업
project_name_list154kV 거창#2분기송전선로 건설사업
purpose거창 신재생E 연계용량 초과 해소를 위한 계통연계
project_region_detail경상남도 거창군
project_period_raw2024.08~2031.12
project_scale_rawACSR 330×S×4C×5.8KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b9b8663eeccc8bb9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_01b051ea42cc6707

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_01b051ea42cc6707

Sources EV-71f26849ce89934bbda75437
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 818880e05ac91a71ddb7cf3c66ce20d3a4e04bbbbe69223555a070c96d46714a

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel