POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV (남양주-왕숙) 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-5886498ac5769491354d5e7b
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8238322dc43783b4
stable_project_keyprjtDef:234771:ESB
project_definition234771
first_region_codeESB
manual_source_formatfalse
project_name154kV (남양주-왕숙) 전력구 건설사업
project_name_list154kV (남양주-왕숙) 전력구 건설사업
purpose남양주-왕숙 부하 해소
project_region_detailNamyangju City, Gyeonggi Province
project_period_raw2024.02~2028.06
project_scale_raw전력구 1,336M
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_4d58200ac1de4f07
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_8238322dc43783b4

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8238322dc43783b4

Sources EV-5886498ac5769491354d5e7b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 bf5579c879aa6c47b076ffe03734f27fb99f14e798f14a9297521fe1e0f1d8e1
Source schedule candidates · KOR · kepco_planned

154kV (남양주-왕숙) 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234771|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4d58200ac1de4f07

Sources EV-d80799ae32896c8ffc86fc47
Evidence SHA-256 3c337554bc1f42855585d2c226126a34374f722d51a29584d9fccb39a1baf9f1
행 SHA-256 ae21feac192cc5889403f9e9562292663e88a19ca56d97459625c735517c03bb
Source schedule candidates · KOR · kepco_planned

154kV (남양주-왕숙) 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234771|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4d58200ac1de4f07

Sources EV-d80799ae32896c8ffc86fc47
Evidence SHA-256 3c337554bc1f42855585d2c226126a34374f722d51a29584d9fccb39a1baf9f1
행 SHA-256 ae21feac192cc5889403f9e9562292663e88a19ca56d97459625c735517c03bb
Source snapshots by date · KOR · kepco_planned

154kV (남양주-왕숙) 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_4d58200ac1de4f07
stable_project_idkproj_8238322dc43783b4
source_key202609|234771|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV (남양주-왕숙) 전력구 건설사업
project_name_detail154kV (남양주-왕숙) 전력구 건설사업
region_summary_raw경기도 남양주시등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 남양주-왕숙 부하 해소
Project region
  • Namyangju City, Gyeonggi Province
Project period
  • 2024.02~2028.06
사업 규모
  • 전력구 1,336M
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
line 기본설계 진
future_plan_redactedline □ 향후계획 기본설계 진
attachment_count0
source_detail_sha2563c337554bc1f42855585d2c226126a34374f722d51a29584d9fccb39a1baf9f1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234771|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4d58200ac1de4f07

Sources EV-d80799ae32896c8ffc86fc47
Evidence SHA-256 3c337554bc1f42855585d2c226126a34374f722d51a29584d9fccb39a1baf9f1
행 SHA-256 ae21feac192cc5889403f9e9562292663e88a19ca56d97459625c735517c03bb
Source snapshots by date · KOR · kepco_planned

154kV (남양주-왕숙) 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8238322dc43783b4
stable_project_keyprjtDef:234771:ESB
project_definition234771
first_region_codeESB
manual_source_formatfalse
project_name154kV (남양주-왕숙) 전력구 건설사업
project_name_list154kV (남양주-왕숙) 전력구 건설사업
purpose남양주-왕숙 부하 해소
project_region_detailNamyangju City, Gyeonggi Province
project_period_raw2024.02~2028.06
project_scale_raw전력구 1,336M
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_4d58200ac1de4f07
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_8238322dc43783b4

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8238322dc43783b4

Sources EV-5886498ac5769491354d5e7b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 bf5579c879aa6c47b076ffe03734f27fb99f14e798f14a9297521fe1e0f1d8e1

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel