POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 7items · current page 1–7 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 검암S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-d642fe2af23372106fdf669c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f7772b1f3e05c7df
stable_project_keyprjtDef:231523:ESB
project_definition231523
first_region_codeESB
manual_source_formatfalse
project_name154kV 검암S/S 건설사업
project_name_list154kV 검암S/S 건설사업
purpose검암역세권 개발 및 인천서구지역 부하부담
project_region_detail인천광역시 서해구
project_period_raw
project_scale_raw154KV M.TR(60MVA) × 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_ce76778eed64e0a3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_f7772b1f3e05c7df

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f7772b1f3e05c7df

Sources EV-d642fe2af23372106fdf669c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b839b1abbd4ba2e76e5147dae0614ef4f4b4d3c600ae87f737257883c652d715
Source schedule candidates · KOR · kepco_planned

154kV 검암S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2029-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231523|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ce76778eed64e0a3

Sources EV-da5b45299c558670ceedc321
Evidence SHA-256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0
행 SHA-256 425d8210d5bfe290a332b713fbc1251e8979031e7d98184583f4845569bf417a
Source schedule candidates · KOR · kepco_planned

154kV 검암S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231523|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ce76778eed64e0a3

Sources EV-da5b45299c558670ceedc321
Evidence SHA-256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0
행 SHA-256 425d8210d5bfe290a332b713fbc1251e8979031e7d98184583f4845569bf417a
Source schedule candidates · KOR · kepco_planned

154kV 검암S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231523|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ce76778eed64e0a3

Sources EV-da5b45299c558670ceedc321
Evidence SHA-256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0
행 SHA-256 425d8210d5bfe290a332b713fbc1251e8979031e7d98184583f4845569bf417a
Source schedule candidates · KOR · kepco_planned

154kV 검암S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231523|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ce76778eed64e0a3

Sources EV-da5b45299c558670ceedc321
Evidence SHA-256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0
행 SHA-256 425d8210d5bfe290a332b713fbc1251e8979031e7d98184583f4845569bf417a
Source snapshots by date · KOR · kepco_planned

154kV 검암S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_ce76778eed64e0a3
stable_project_idkproj_f7772b1f3e05c7df
source_key202609|231523|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 검암S/S 건설사업
project_name_detail154kV 검암S/S 건설사업
region_summary_raw인천광역시 서해구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 검암역세권 개발 및 인천서구지역 부하부담
Project region
  • 인천광역시 서해구
Project period
사업 규모
  • 154KV M.TR(60MVA) × 2BANK
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
□ 추진 계획 ○ ‘26.01 : 부지확정 완료 ○ ‘26.07 : 용지매수 완료 ○ ‘27.05 : 착공(토건/변전) ○ ‘29.04 : 변전소 가압
future_plan_redacted□ 향후계획 □ 추진 계획 ○ ‘26.01 : 부지확정 완료 ○ ‘26.07 : 용지매수 완료 ○ ‘27.05 : 착공(토건/변전) ○ ‘29.04 : 변전소 가압
attachment_count0
source_detail_sha2568b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231523|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ce76778eed64e0a3

Sources EV-da5b45299c558670ceedc321
Evidence SHA-256 8b73634ddad20888274c485cb2c79017dd5ab19077feb96e225273d973fb68d0
행 SHA-256 425d8210d5bfe290a332b713fbc1251e8979031e7d98184583f4845569bf417a
Source snapshots by date · KOR · kepco_planned

154kV 검암S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f7772b1f3e05c7df
stable_project_keyprjtDef:231523:ESB
project_definition231523
first_region_codeESB
manual_source_formatfalse
project_name154kV 검암S/S 건설사업
project_name_list154kV 검암S/S 건설사업
purpose검암역세권 개발 및 인천서구지역 부하부담
project_region_detail인천광역시 서해구
project_period_raw
project_scale_raw154KV M.TR(60MVA) × 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_ce76778eed64e0a3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_f7772b1f3e05c7df

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f7772b1f3e05c7df

Sources EV-d642fe2af23372106fdf669c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b839b1abbd4ba2e76e5147dae0614ef4f4b4d3c600ae87f737257883c652d715

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel