POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 2001–2100 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2027-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233886|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a9b87f4a1d3953a4
Sources EV-ae7bc87dd297465c7b76993a Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9 행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233886|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a9b87f4a1d3953a4
Sources EV-ae7bc87dd297465c7b76993a Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9 행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2028-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233886|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a9b87f4a1d3953a4
Sources EV-ae7bc87dd297465c7b76993a Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9 행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2027-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233886|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a9b87f4a1d3953a4
Sources EV-ae7bc87dd297465c7b76993a Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9 행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2020-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233886|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a9b87f4a1d3953a4
Sources EV-ae7bc87dd297465c7b76993a Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9 행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233886|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a9b87f4a1d3953a4
Sources EV-ae7bc87dd297465c7b76993a Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9 행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_a9b87f4a1d3953a4 stable_project_id kproj_0b8a2339212a4fa1 source_key 202609|233886|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 득량분기 지중송전선로 건설사업 project_name_detail 154kV 득량분기 지중T/L 건설사업 region_summary_raw 전남광주통합특별시 보성군등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: ○ '27.01 기본설계 완료 ○ '27.07 실시설계 완료 ○ '27.10 착공 ○ '28.04 가압 future_plan_redacted □ 향후계획 ○ '27.01 기본설계 완료 ○ '27.07 실시설계 완료 ○ '27.10 착공 ○ '28.04 가압 attachment_count 0 source_detail_sha256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233886|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a9b87f4a1d3953a4
Sources EV-ae7bc87dd297465c7b76993a Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9 행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_0b8a2339212a4fa1 stable_project_key prjtDef:233886:ESB project_definition 233886 first_region_code ESB manual_source_format false project_name 154kV 득량분기 지중T/L 건설사업 project_name_list 154kV 득량분기 지중송전선로 건설사업 purpose 용량 증가에 따른 계통보강 project_region_detail 전남광주통합특별시 보성군 project_period_raw 2020.03~2026.12 project_scale_raw 154KV XLPE X2500 4C 1KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_0b8a2339212a4fa1
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0b8a2339212a4fa1
Sources EV-8a666008670b7ab70a54436e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 11c3d11a2fbe702dc4315112db467492c4bf9bdda2525039dc5211c93d6140a6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-2b356c64cff8dfd76b58d018
Detailed source fields Original source field Published value or condition stable_project_id kproj_0f2f2af5c4c45967 stable_project_key prjtDef:232409:ESB project_definition 232409 first_region_code ESB manual_source_format false project_name 154kV 명곡분기T/L 건설사업 project_name_list 154kV 명곡분기 송전선로 건설사업 purpose 신설 154KV 명곡S/S 신규부하 공급 project_region_detail 대구광역시 달성군 project_period_raw 2020.06~2026.04 project_scale_raw ACSR 410*2B*4회선, 0.15KM(각 2C) responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_0f2f2af5c4c45967
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0f2f2af5c4c45967
Sources EV-2b356c64cff8dfd76b58d018 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4a41f2ce3fbd9cc74d6edfb0d01dfb496ed22985248b201e0ed8170679e7fad6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2020-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2022-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2020-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232409|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_d7b696207ae69f77 stable_project_id kproj_0f2f2af5c4c45967 source_key 202609|232409|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 명곡분기 송전선로 건설사업 project_name_detail 154kV 명곡분기T/L 건설사업 region_summary_raw 대구광역시 달성군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 사업 규모 ACSR 410*2B*4회선, 0.15KM(각 2C) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2020.09 환경/재해 영향평가 환경영향평가: 2020.11 ~ 2022.04 재해영향평가: 2020.11 ~ 2022.04 주민의견 수렴 지자체 공고 열람: 2020.06 ~ 2020.06 설명회·공청회: 2020.06 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 2023.09 ~ 2025.01 설계담당자: [redacted] □ 진행경과 - 20.09 : 입지확정 - 22.12 : 전원개발사업 실시계획 변경승인 - 25.05 : 공사착공 □ 향후계획 - 26년 4월 준공 future_plan_redacted □ 향후계획 □ 진행경과 - 20.09 : 입지확정 - 22.12 : 전원개발사업 실시계획 변경승인 - 25.05 : 공사착공 □ 향후계획 - 26년 4월 준공 attachment_count 0 source_detail_sha256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232409|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d7b696207ae69f77
Sources EV-4f05c4844e156066ea0195ce Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d 행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_0f2f2af5c4c45967 stable_project_key prjtDef:232409:ESB project_definition 232409 first_region_code ESB manual_source_format false project_name 154kV 명곡분기T/L 건설사업 project_name_list 154kV 명곡분기 송전선로 건설사업 purpose 신설 154KV 명곡S/S 신규부하 공급 project_region_detail 대구광역시 달성군 project_period_raw 2020.06~2026.04 project_scale_raw ACSR 410*2B*4회선, 0.15KM(각 2C) responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_0f2f2af5c4c45967
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0f2f2af5c4c45967
Sources EV-2b356c64cff8dfd76b58d018 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4a41f2ce3fbd9cc74d6edfb0d01dfb496ed22985248b201e0ed8170679e7fad6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-10 Sources EV-0c1cd9c4ecc58c445a4c356d
Detailed source fields Original source field Published value or condition stable_project_id kproj_06d31cda9833cc16 stable_project_key prjtDef:232425:ESB project_definition 232425 first_region_code ESB manual_source_format false project_name 154kV 명례#2개폐소분기T/L 건설사업 project_name_list 154kV 명례#2개폐소분기T/L 건설사업 purpose 명례-장안T/L 고장대비 계통보강 project_region_detail Gijang County, Busan Metropolitan City project_period_raw 2025.06~2031.10 project_scale_raw ACSR 330㎟ X S X 6C - 0.1KM responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 2 active_snapshot_count 2 snapshot_ids ksnap_7c8f0e7eda735156 ksnap_e595f52d68e5c030 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_06d31cda9833cc16
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_06d31cda9833cc16
Sources EV-0c1cd9c4ecc58c445a4c356d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d01204e0fb770c57911eff30afe6c0e3616f415e4f9f874591aeefabc8fb1eab Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232425|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e595f52d68e5c030
Sources EV-5b3821e5d7e0e6904042d560 Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849 행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232425|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c8f0e7eda735156
Sources EV-f4f1d1b215281624f1de8d85 Evidence SHA-256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab 행 SHA-256 96a3d044585079c7441f2f924bf07736a2ea3fe39bb91bf657202a6d953c9769 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232425|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c8f0e7eda735156
Sources EV-f4f1d1b215281624f1de8d85 Evidence SHA-256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab 행 SHA-256 96a3d044585079c7441f2f924bf07736a2ea3fe39bb91bf657202a6d953c9769 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202610|232425|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e595f52d68e5c030
Sources EV-5b3821e5d7e0e6904042d560 Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849 행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232425|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e595f52d68e5c030
Sources EV-5b3821e5d7e0e6904042d560 Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849 행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202610|232425|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e595f52d68e5c030
Sources EV-5b3821e5d7e0e6904042d560 Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849 행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232425|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e595f52d68e5c030
Sources EV-5b3821e5d7e0e6904042d560 Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849 행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7c8f0e7eda735156 stable_project_id kproj_06d31cda9833cc16 source_key 202609|232425|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 명례#2개폐소분기T/L 건설사업 project_name_detail 154kV 명례#2개폐소분기T/L 건설사업 region_summary_raw 부산광역시 기장군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project region Gijang County, Busan Metropolitan City 사업 규모 ACSR 330㎟ X S X 6C - 0.1KM 계획확정 제11차 장기송변전설비계획 반영(2025.06) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진 future_plan_redacted □ 향후계획 1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진 attachment_count 0 source_detail_sha256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232425|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c8f0e7eda735156
Sources EV-f4f1d1b215281624f1de8d85 Evidence SHA-256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab 행 SHA-256 96a3d044585079c7441f2f924bf07736a2ea3fe39bb91bf657202a6d953c9769 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_e595f52d68e5c030 stable_project_id kproj_06d31cda9833cc16 source_key 202610|232425|ESB basic_ym 202610 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 명례#2개폐소분기T/L 건설사업 project_name_detail 154kV 명례#2개폐소분기T/L 건설사업 region_summary_raw 부산광역시 기장군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project region Gijang County, Busan Metropolitan City 사업 규모 ACSR 330㎟ X S X 6C - 0.1KM 계획확정 제11차 장기송변전설비계획 반영(2025.06) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진 future_plan_redacted □ 향후계획 1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진 attachment_count 0 source_detail_sha256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202610 source_record_id 202610|232425|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e595f52d68e5c030
Sources EV-5b3821e5d7e0e6904042d560 Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849 행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_06d31cda9833cc16 stable_project_key prjtDef:232425:ESB project_definition 232425 first_region_code ESB manual_source_format false project_name 154kV 명례#2개폐소분기T/L 건설사업 project_name_list 154kV 명례#2개폐소분기T/L 건설사업 purpose 명례-장안T/L 고장대비 계통보강 project_region_detail Gijang County, Busan Metropolitan City project_period_raw 2025.06~2031.10 project_scale_raw ACSR 330㎟ X S X 6C - 0.1KM responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 2 active_snapshot_count 2 snapshot_ids ksnap_7c8f0e7eda735156 ksnap_e595f52d68e5c030 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_06d31cda9833cc16
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_06d31cda9833cc16
Sources EV-0c1cd9c4ecc58c445a4c356d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d01204e0fb770c57911eff30afe6c0e3616f415e4f9f874591aeefabc8fb1eab Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-497bef838c3ffa7ee91c9efc
Detailed source fields Original source field Published value or condition stable_project_id kproj_7bf4cb9132765f1b stable_project_key prjtDef:232505:ESB project_definition 232505 first_region_code ESB manual_source_format false project_name 154kV 문경분기 건설사업 project_name_list 154kV 문경분기 송전선로 건설사업 purpose (기설) 154KV 문경S/S 계통보강 project_region_detail 경상북도 문경시 project_period_raw 2018.10~2026.10 project_scale_raw ACSR 330㎣×S×2C - 11.4KM, 28기 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_7bf4cb9132765f1b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7bf4cb9132765f1b
Sources EV-497bef838c3ffa7ee91c9efc Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1c22d7d7a386a5f3817a30d383e1a7547cdb83e9f39a185a1d1e8566256014c9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2019-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2011-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2020-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_6d2f91a380a4b636 stable_project_id kproj_7bf4cb9132765f1b source_key 202609|232505|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 문경분기 송전선로 건설사업 project_name_detail 154kV 문경분기 건설사업 region_summary_raw 경상북도 문경시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 사업 규모 ACSR 330㎣×S×2C - 11.4KM, 28기 입지선정 전력입지영향평가 용역 착수: 2018.10 입지선정위원회 구성시기: 2020.01 참여 위원 수 : 15 지장유무 조회: 2019.12~ 경과지(부지) 확정: 2020.01 환경/재해 영향평가 환경영향평가: 2020.06 ~ 2023.05 재해영향평가: 2020.06 ~ 2023.01 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 2021.03 ~ 사업설계 설계용역: 기본설계: 2022.02 ~ 실시설계: 2023.04 ~ 2023.11 설계담당자: [redacted] 건설공사 개요 공사 착공: 2024.06 공사 기간: 2024.05 ~ 2027.10 감독자: [redacted], 실적): 95, 68 2023.12 : 공사 계약의뢰 2024.06 : 공사 착공 future_plan_redacted □ 향후계획 2023.12 : 공사 계약의뢰 2024.06 : 공사 착공 attachment_count 0 source_detail_sha256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232505|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_7bf4cb9132765f1b stable_project_key prjtDef:232505:ESB project_definition 232505 first_region_code ESB manual_source_format false project_name 154kV 문경분기 건설사업 project_name_list 154kV 문경분기 송전선로 건설사업 purpose (기설) 154KV 문경S/S 계통보강 project_region_detail 경상북도 문경시 project_period_raw 2018.10~2026.10 project_scale_raw ACSR 330㎣×S×2C - 11.4KM, 28기 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_7bf4cb9132765f1b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7bf4cb9132765f1b
Sources EV-497bef838c3ffa7ee91c9efc Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1c22d7d7a386a5f3817a30d383e1a7547cdb83e9f39a185a1d1e8566256014c9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4013c2b68a864383cc9575da
Detailed source fields Original source field Published value or condition stable_project_id kproj_4ffef9cbfc3fb34d stable_project_key prjtDef:231621:ESB project_definition 231621 first_region_code ESB manual_source_format false project_name 154kV 박촌(구.임학#2) 건설사업 project_name_list 154kV 박촌(구.임학#2) 건설사업 purpose 계양 테크노밸리 신규전력 공급 project_region_detail 인천광역시 계양구 project_period_raw 2020.12~2027.04 project_scale_raw 154KV M.TR(60MVA) × 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_4ffef9cbfc3fb34d
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_4ffef9cbfc3fb34d
Sources EV-4013c2b68a864383cc9575da Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 79e028335918eb20be12ff13b5839a675369cd596db1b5b2668b0fb98e1a31f2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-12-23 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12-30 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2020-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-08-28 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-05-14 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_47628e26f1dc267d stable_project_id kproj_4ffef9cbfc3fb34d source_key 202609|231621|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 박촌(구.임학#2) 건설사업 project_name_detail 154kV 박촌(구.임학#2) 건설사업 region_summary_raw 인천광역시 계양구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV M.TR(60MVA) × 2BANK 계획확정 제10차 장기송변전설비계획 반영(2024.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.09 참여 위원 수 : 11 경과지(부지) 확정: 2026.06 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2026.01 ~ 2026.10 기본설계: 2025.05 ~ 2025.07 실시설계: 2026.01 ~ 2026.11 설계담당자: [redacted] [추진실적] □ '20.12.23 : 수도권 3기 신도시 계통 재구성 추진안(계통계획처) □ '24.05.14 : 단기 송변전설비계획 적정성 검토결과 반영 준공목표 변경 ※ `25년 11월 → `27년 4월 □ '25.08.28 : 장기 송·변전설비계획 건설여건 적정성 검토 결과 제출 중 ※ 준공목표 변경 `27년 04월 → `28년 9월 □ '25.12.30 : 국토부 고시 변경 승인 [향후계획] □ '26.10 : 변전소 토건/변전공사 착공 □ '27.04 : 준공(기기가압) - '28.09 : 준공목표변경중(LH 선행공정 미완료로 지연) future_plan_redacted □ 향후계획 [추진실적] □ '20.12.23 : 수도권 3기 신도시 계통 재구성 추진안(계통계획처) □ '24.05.14 : 단기 송변전설비계획 적정성 검토결과 반영 준공목표 변경 ※ `25년 11월 → `27년 4월 □ '25.08.28 : 장기 송·변전설비계획 건설여건 적정성 검토 결과 제출 중 ※ 준공목표 변경 `27년 04월 → `28년 9월 □ '25.12.30 : 국토부 고시 변경 승인 [향후계획] □ '26.10 : 변전소 토건/변전공사 착공 □ '27.04 : 준공(기기가압) - '28.09 : 준공목표변경중(LH 선행공정 미완료로 지연) attachment_count 0 source_detail_sha256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231621|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_4ffef9cbfc3fb34d stable_project_key prjtDef:231621:ESB project_definition 231621 first_region_code ESB manual_source_format false project_name 154kV 박촌(구.임학#2) 건설사업 project_name_list 154kV 박촌(구.임학#2) 건설사업 purpose 계양 테크노밸리 신규전력 공급 project_region_detail 인천광역시 계양구 project_period_raw 2020.12~2027.04 project_scale_raw 154KV M.TR(60MVA) × 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_4ffef9cbfc3fb34d
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_4ffef9cbfc3fb34d
Sources EV-4013c2b68a864383cc9575da Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 79e028335918eb20be12ff13b5839a675369cd596db1b5b2668b0fb98e1a31f2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-13e887feb61009265412c2d9
Detailed source fields Original source field Published value or condition stable_project_id kproj_42ee30c30393a352 stable_project_key prjtDef:233219:ESB project_definition 233219 first_region_code ESB manual_source_format false project_name 154kV 방여울분기 지중T/L 건설사업 project_name_list 154kV 방여울분기 지중T/L 건설사업 purpose 154KV 방여울S/S 건설에 따른 송전선로 건설 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2025.07~2025.10 project_scale_raw XLPE 2500㎟ 4C-0.25KM responsible_office_raw 경인건설본부/경기건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_42ee30c30393a352
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_42ee30c30393a352
Sources EV-13e887feb61009265412c2d9 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 64a258bad14de6ad0b210016c17ca7b0e983d52568e7d8e9d6d406a4d501a9db Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233219|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5703e9719cf80ecf
Sources EV-0baf4122a48636725f60d325 Evidence SHA-256 62bab91aca1e1411fd71e67ca1a0960de9cf837c3b6f5e6d73eed908fb67a0fc 행 SHA-256 924ee6ebafb0fb7acca17c202d58a71fda3156d16727afb0a83d56db8a3341f3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233219|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5703e9719cf80ecf
Sources EV-0baf4122a48636725f60d325 Evidence SHA-256 62bab91aca1e1411fd71e67ca1a0960de9cf837c3b6f5e6d73eed908fb67a0fc 행 SHA-256 924ee6ebafb0fb7acca17c202d58a71fda3156d16727afb0a83d56db8a3341f3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_5703e9719cf80ecf stable_project_id kproj_42ee30c30393a352 source_key 202609|233219|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 방여울분기 지중T/L 건설사업 project_name_detail 154kV 방여울분기 지중T/L 건설사업 region_summary_raw 경기도 평택시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project purpose 154KV 방여울S/S 건설에 따른 송전선로 건설 Project region Pyeongtaek, Gyeonggi Province 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2025.01 ~ 2025.06 기본설계: 2024.09 ~ 2024.12 실시설계: 2025.01 ~ 2025.04 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.07 공사 기간: 2025.07 ~ 2026.11 감독자: [redacted], 실적): 100, 82 [추진실적] - 24.12 : 기본설계 완료 - 25.04 : 주자재 계약 - 25.04 : 실시설계 완료 - 25.07 : 공사 및 감리용역 착공 - 25.12 : 고덕-방여울, 방여울-진위#2T/L 실부하 가압 - 26.01 : 고덕-진위#1T/L 휴전 불가로 공사중지 [향후계획] - 26.09 : 고덕-진위#1T/L 휴전작업 시행 - 26.10 : 고덕-방여울, 방여울-진위 #1T/L 실부하가압 - 26.11 : 공사 및 감리용역 준공 future_plan_redacted □ 향후계획 [추진실적] - 24.12 : 기본설계 완료 - 25.04 : 주자재 계약 - 25.04 : 실시설계 완료 - 25.07 : 공사 및 감리용역 착공 - 25.12 : 고덕-방여울, 방여울-진위#2T/L 실부하 가압 - 26.01 : 고덕-진위#1T/L 휴전 불가로 공사중지 [향후계획] - 26.09 : 고덕-진위#1T/L 휴전작업 시행 - 26.10 : 고덕-방여울, 방여울-진위 #1T/L 실부하가압 - 26.11 : 공사 및 감리용역 준공 attachment_count 0 source_detail_sha256 62bab91aca1e1411fd71e67ca1a0960de9cf837c3b6f5e6d73eed908fb67a0fc first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233219|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5703e9719cf80ecf
Sources EV-0baf4122a48636725f60d325 Evidence SHA-256 62bab91aca1e1411fd71e67ca1a0960de9cf837c3b6f5e6d73eed908fb67a0fc 행 SHA-256 924ee6ebafb0fb7acca17c202d58a71fda3156d16727afb0a83d56db8a3341f3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_42ee30c30393a352 stable_project_key prjtDef:233219:ESB project_definition 233219 first_region_code ESB manual_source_format false project_name 154kV 방여울분기 지중T/L 건설사업 project_name_list 154kV 방여울분기 지중T/L 건설사업 purpose 154KV 방여울S/S 건설에 따른 송전선로 건설 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2025.07~2025.10 project_scale_raw XLPE 2500㎟ 4C-0.25KM responsible_office_raw 경인건설본부/경기건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_42ee30c30393a352
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_42ee30c30393a352
Sources EV-13e887feb61009265412c2d9 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 64a258bad14de6ad0b210016c17ca7b0e983d52568e7d8e9d6d406a4d501a9db Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-9bc19e26d17989369ed9487e
Detailed source fields Original source field Published value or condition stable_project_id kproj_54dc075686b7f1dc stable_project_key prjtDef:231419:ESB project_definition 231419 first_region_code ESB manual_source_format false project_name 154kV 배곧(舊정왕#2)S/S 건설사업 project_name_list 154,000V 배곧변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경기도 시흥시 project_period_raw 2017.07~2028.12 project_scale_raw 154KV M.TR 60MVA X 2BANK(최종 4BANK) responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_54dc075686b7f1dc
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_54dc075686b7f1dc
Sources EV-9bc19e26d17989369ed9487e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d33394dab953a991941184db45cc959ab59f6ce02a61ae76f8de2a26aa55e355 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231419|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc41ec63134d9dbc
Sources EV-7798c72c043e8d2755e880bc Evidence SHA-256 12e4496f2a90a93082fc6445e550dc11e0268e8b66fdbf5fd8b05dff5a714996 행 SHA-256 5f3d9e07f06196d26631f5395607e1b9aef30e847267d78f282ec314f4902a7c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2017-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231419|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc41ec63134d9dbc
Sources EV-7798c72c043e8d2755e880bc Evidence SHA-256 12e4496f2a90a93082fc6445e550dc11e0268e8b66fdbf5fd8b05dff5a714996 행 SHA-256 5f3d9e07f06196d26631f5395607e1b9aef30e847267d78f282ec314f4902a7c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_bc41ec63134d9dbc stable_project_id kproj_54dc075686b7f1dc source_key 202609|231419|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154,000V 배곧변전소 건설사업 project_name_detail 154kV 배곧(舊정왕#2)S/S 건설사업 region_summary_raw 경기도 시흥시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV M.TR 60MVA X 2BANK(최종 4BANK) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2019.10 참여 위원 수 : 경과지(부지) 확정: 2020.03 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 ○ 서울대학교 시흥캠퍼스 학내 변전소 설치로, 한전 자체 입지선정위원회 구성 사업설계 설계용역: 기본설계: 2026.07 ~ 2026.07 실시설계: 설계담당자: [redacted] ○ '27.03 : 변전공사 착공 ○ '28.12 : 변전소 가압 future_plan_redacted □ 향후계획 ○ '27.03 : 변전공사 착공 ○ '28.12 : 변전소 가압 attachment_count 0 source_detail_sha256 12e4496f2a90a93082fc6445e550dc11e0268e8b66fdbf5fd8b05dff5a714996 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231419|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc41ec63134d9dbc
Sources EV-7798c72c043e8d2755e880bc Evidence SHA-256 12e4496f2a90a93082fc6445e550dc11e0268e8b66fdbf5fd8b05dff5a714996 행 SHA-256 5f3d9e07f06196d26631f5395607e1b9aef30e847267d78f282ec314f4902a7c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_54dc075686b7f1dc stable_project_key prjtDef:231419:ESB project_definition 231419 first_region_code ESB manual_source_format false project_name 154kV 배곧(舊정왕#2)S/S 건설사업 project_name_list 154,000V 배곧변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경기도 시흥시 project_period_raw 2017.07~2028.12 project_scale_raw 154KV M.TR 60MVA X 2BANK(최종 4BANK) responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_54dc075686b7f1dc
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_54dc075686b7f1dc
Sources EV-9bc19e26d17989369ed9487e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d33394dab953a991941184db45cc959ab59f6ce02a61ae76f8de2a26aa55e355 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-24de0d66b6ba44964dcc6382
Detailed source fields Original source field Published value or condition stable_project_id kproj_43e3bcc957e19f3d stable_project_key prjtDef:233439:ESB project_definition 233439 first_region_code ESB manual_source_format false project_name 154kV 배곧-서시화 지중T/L 건설사업 project_name_list 154kV 배곧-서시화 지중T/L 건설사업 purpose 배곧신도시 부하공급능력 확보 및 시흥지역 project_region_detail 경기도 시흥시 project_period_raw 2027.07~2028.12 project_scale_raw 154KV XLPE 2,000,2C - 1.0KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_43e3bcc957e19f3d
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_43e3bcc957e19f3d
Sources EV-24de0d66b6ba44964dcc6382 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 5a15ed819068de337ebc95e48a4ee3d2e67de7349302f0765b6717a71617f351 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2027-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233439|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0ad06f6383ba4b54
Sources EV-a2274fc4945c837bfab1e623 Evidence SHA-256 a273f983102aae4991411522b082f28b72415f8f5e84b13bdb1317b9d5a0abb1 행 SHA-256 c7ddbf3dc1afca6f317803b776ee70a57e514e4bc777c780efaf4baeff8b4f7f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233439|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0ad06f6383ba4b54
Sources EV-a2274fc4945c837bfab1e623 Evidence SHA-256 a273f983102aae4991411522b082f28b72415f8f5e84b13bdb1317b9d5a0abb1 행 SHA-256 c7ddbf3dc1afca6f317803b776ee70a57e514e4bc777c780efaf4baeff8b4f7f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0ad06f6383ba4b54 stable_project_id kproj_43e3bcc957e19f3d source_key 202609|233439|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 배곧-서시화 지중T/L 건설사업 project_name_detail 154kV 배곧-서시화 지중T/L 건설사업 region_summary_raw 경기도 시흥시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV XLPE 2,000,2C - 1.0KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 기본설계자료 수집 attachment_count 0 source_detail_sha256 a273f983102aae4991411522b082f28b72415f8f5e84b13bdb1317b9d5a0abb1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233439|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0ad06f6383ba4b54
Sources EV-a2274fc4945c837bfab1e623 Evidence SHA-256 a273f983102aae4991411522b082f28b72415f8f5e84b13bdb1317b9d5a0abb1 행 SHA-256 c7ddbf3dc1afca6f317803b776ee70a57e514e4bc777c780efaf4baeff8b4f7f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_43e3bcc957e19f3d stable_project_key prjtDef:233439:ESB project_definition 233439 first_region_code ESB manual_source_format false project_name 154kV 배곧-서시화 지중T/L 건설사업 project_name_list 154kV 배곧-서시화 지중T/L 건설사업 purpose 배곧신도시 부하공급능력 확보 및 시흥지역 project_region_detail 경기도 시흥시 project_period_raw 2027.07~2028.12 project_scale_raw 154KV XLPE 2,000,2C - 1.0KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_43e3bcc957e19f3d
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_43e3bcc957e19f3d
Sources EV-24de0d66b6ba44964dcc6382 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 5a15ed819068de337ebc95e48a4ee3d2e67de7349302f0765b6717a71617f351 Observations for this power asset History for this project Previous Next