POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 201,406items · current page 2001–2100 · Source records, not unique facilities.

Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2027-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2028-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2027-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2020-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2027-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source snapshots by date · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a9b87f4a1d3953a4
stable_project_idkproj_0b8a2339212a4fa1
source_key202609|233886|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 득량분기 지중송전선로 건설사업
project_name_detail154kV 득량분기 지중T/L 건설사업
region_summary_raw전남광주통합특별시 보성군등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 용량 증가에 따른 계통보강
Project region
  • 전남광주통합특별시 보성군
Project period
  • 2020.03~2026.12
사업 규모
  • 154KV XLPE X2500 4C 1KM
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○ '27.01 기본설계 완료 ○ '27.07 실시설계 완료 ○ '27.10 착공 ○ '28.04 가압
future_plan_redacted□ 향후계획 ○ '27.01 기본설계 완료 ○ '27.07 실시설계 완료 ○ '27.10 착공 ○ '28.04 가압
attachment_count0
source_detail_sha25637b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233886|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source snapshots by date · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0b8a2339212a4fa1
stable_project_keyprjtDef:233886:ESB
project_definition233886
first_region_codeESB
manual_source_formatfalse
project_name154kV 득량분기 지중T/L 건설사업
project_name_list154kV 득량분기 지중송전선로 건설사업
purpose용량 증가에 따른 계통보강
project_region_detail전남광주통합특별시 보성군
project_period_raw2020.03~2026.12
project_scale_raw154KV XLPE X2500 4C 1KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a9b87f4a1d3953a4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_0b8a2339212a4fa1

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0b8a2339212a4fa1

Sources EV-8a666008670b7ab70a54436e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 11c3d11a2fbe702dc4315112db467492c4bf9bdda2525039dc5211c93d6140a6
Power assets and projects · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-2b356c64cff8dfd76b58d018
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0f2f2af5c4c45967
stable_project_keyprjtDef:232409:ESB
project_definition232409
first_region_codeESB
manual_source_formatfalse
project_name154kV 명곡분기T/L 건설사업
project_name_list154kV 명곡분기 송전선로 건설사업
purpose신설 154KV 명곡S/S 신규부하 공급
project_region_detail대구광역시 달성군
project_period_raw2020.06~2026.04
project_scale_rawACSR 410*2B*4회선, 0.15KM(각 2C)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d7b696207ae69f77
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_0f2f2af5c4c45967

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0f2f2af5c4c45967

Sources EV-2b356c64cff8dfd76b58d018
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4a41f2ce3fbd9cc74d6edfb0d01dfb496ed22985248b201e0ed8170679e7fad6
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2020-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2022-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2020-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source snapshots by date · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d7b696207ae69f77
stable_project_idkproj_0f2f2af5c4c45967
source_key202609|232409|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 명곡분기 송전선로 건설사업
project_name_detail154kV 명곡분기T/L 건설사업
region_summary_raw대구광역시 달성군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 신설 154KV 명곡S/S 신규부하 공급
Project region
  • 대구광역시 달성군
Project period
  • 2020.06~2026.04
사업 규모
  • ACSR 410*2B*4회선, 0.15KM(각 2C)
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2020.09
환경/재해 영향평가
  • 환경영향평가: 2020.11 ~ 2022.04 재해영향평가: 2020.11 ~ 2022.04
주민의견 수렴
  • 지자체 공고 열람: 2020.06 ~ 2020.06 설명회·공청회: 2020.06 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 2023.09 ~ 2025.01 설계담당자: [redacted]
□ 진행경과 - 20.09 : 입지확정 - 22.12 : 전원개발사업 실시계획 변경승인 - 25.05 : 공사착공 □ 향후계획 - 26년 4월 준공
future_plan_redacted□ 향후계획 □ 진행경과 - 20.09 : 입지확정 - 22.12 : 전원개발사업 실시계획 변경승인 - 25.05 : 공사착공 □ 향후계획 - 26년 4월 준공
attachment_count0
source_detail_sha25677f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232409|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source snapshots by date · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0f2f2af5c4c45967
stable_project_keyprjtDef:232409:ESB
project_definition232409
first_region_codeESB
manual_source_formatfalse
project_name154kV 명곡분기T/L 건설사업
project_name_list154kV 명곡분기 송전선로 건설사업
purpose신설 154KV 명곡S/S 신규부하 공급
project_region_detail대구광역시 달성군
project_period_raw2020.06~2026.04
project_scale_rawACSR 410*2B*4회선, 0.15KM(각 2C)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d7b696207ae69f77
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_0f2f2af5c4c45967

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0f2f2af5c4c45967

Sources EV-2b356c64cff8dfd76b58d018
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4a41f2ce3fbd9cc74d6edfb0d01dfb496ed22985248b201e0ed8170679e7fad6
Power assets and projects · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-10
Sources EV-0c1cd9c4ecc58c445a4c356d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_06d31cda9833cc16
stable_project_keyprjtDef:232425:ESB
project_definition232425
first_region_codeESB
manual_source_formatfalse
project_name154kV 명례#2개폐소분기T/L 건설사업
project_name_list154kV 명례#2개폐소분기T/L 건설사업
purpose명례-장안T/L 고장대비 계통보강
project_region_detailGijang County, Busan Metropolitan City
project_period_raw2025.06~2031.10
project_scale_rawACSR 330㎟ X S X 6C - 0.1KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_7c8f0e7eda735156
  • ksnap_e595f52d68e5c030
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_06d31cda9833cc16

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_06d31cda9833cc16

Sources EV-0c1cd9c4ecc58c445a4c356d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d01204e0fb770c57911eff30afe6c0e3616f415e4f9f874591aeefabc8fb1eab
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232425|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232425|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c8f0e7eda735156

Sources EV-f4f1d1b215281624f1de8d85
Evidence SHA-256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab
행 SHA-256 96a3d044585079c7441f2f924bf07736a2ea3fe39bb91bf657202a6d953c9769
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232425|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c8f0e7eda735156

Sources EV-f4f1d1b215281624f1de8d85
Evidence SHA-256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab
행 SHA-256 96a3d044585079c7441f2f924bf07736a2ea3fe39bb91bf657202a6d953c9769
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232425|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232425|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232425|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232425|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source snapshots by date · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_7c8f0e7eda735156
stable_project_idkproj_06d31cda9833cc16
source_key202609|232425|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 명례#2개폐소분기T/L 건설사업
project_name_detail154kV 명례#2개폐소분기T/L 건설사업
region_summary_raw부산광역시 기장군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 명례-장안T/L 고장대비 계통보강
Project region
  • Gijang County, Busan Metropolitan City
Project period
  • 2025.06~2031.10
사업 규모
  • ACSR 330㎟ X S X 6C - 0.1KM
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.06)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
future_plan_redacted□ 향후계획 1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
attachment_count0
source_detail_sha256f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232425|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c8f0e7eda735156

Sources EV-f4f1d1b215281624f1de8d85
Evidence SHA-256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab
행 SHA-256 96a3d044585079c7441f2f924bf07736a2ea3fe39bb91bf657202a6d953c9769
Source snapshots by date · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e595f52d68e5c030
stable_project_idkproj_06d31cda9833cc16
source_key202610|232425|ESB
basic_ym202610
source_stage_raw계획확정-사업승인전
project_name_list154kV 명례#2개폐소분기T/L 건설사업
project_name_detail154kV 명례#2개폐소분기T/L 건설사업
region_summary_raw부산광역시 기장군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 명례-장안T/L 고장대비 계통보강
Project region
  • Gijang County, Busan Metropolitan City
Project period
  • 2025.06~2031.10
사업 규모
  • ACSR 330㎟ X S X 6C - 0.1KM
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.06)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • 입지선정 미실시
1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
future_plan_redacted□ 향후계획 1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
attachment_count0
source_detail_sha256a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202610
source_record_id202610|232425|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source snapshots by date · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_06d31cda9833cc16
stable_project_keyprjtDef:232425:ESB
project_definition232425
first_region_codeESB
manual_source_formatfalse
project_name154kV 명례#2개폐소분기T/L 건설사업
project_name_list154kV 명례#2개폐소분기T/L 건설사업
purpose명례-장안T/L 고장대비 계통보강
project_region_detailGijang County, Busan Metropolitan City
project_period_raw2025.06~2031.10
project_scale_rawACSR 330㎟ X S X 6C - 0.1KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_7c8f0e7eda735156
  • ksnap_e595f52d68e5c030
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_06d31cda9833cc16

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_06d31cda9833cc16

Sources EV-0c1cd9c4ecc58c445a4c356d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d01204e0fb770c57911eff30afe6c0e3616f415e4f9f874591aeefabc8fb1eab
Power assets and projects · KOR · kepco_planned

154kV 문경분기 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-497bef838c3ffa7ee91c9efc
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7bf4cb9132765f1b
stable_project_keyprjtDef:232505:ESB
project_definition232505
first_region_codeESB
manual_source_formatfalse
project_name154kV 문경분기 건설사업
project_name_list154kV 문경분기 송전선로 건설사업
purpose(기설) 154KV 문경S/S 계통보강
project_region_detail경상북도 문경시
project_period_raw2018.10~2026.10
project_scale_rawACSR 330㎣×S×2C - 11.4KM, 28기
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6d2f91a380a4b636
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_7bf4cb9132765f1b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7bf4cb9132765f1b

Sources EV-497bef838c3ffa7ee91c9efc
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1c22d7d7a386a5f3817a30d383e1a7547cdb83e9f39a185a1d1e8566256014c9
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2019-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2011-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2020-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source schedule candidates · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232505|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source snapshots by date · KOR · kepco_planned

154kV 문경분기 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_6d2f91a380a4b636
stable_project_idkproj_7bf4cb9132765f1b
source_key202609|232505|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 문경분기 송전선로 건설사업
project_name_detail154kV 문경분기 건설사업
region_summary_raw경상북도 문경시등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • (기설) 154KV 문경S/S 계통보강
Project region
  • 경상북도 문경시
Project period
  • 2018.10~2026.10
사업 규모
  • ACSR 330㎣×S×2C - 11.4KM, 28기
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2018.10 입지선정위원회 구성시기: 2020.01 참여 위원 수 : 15 지장유무 조회: 2019.12~ 경과지(부지) 확정: 2020.01
환경/재해 영향평가
  • 환경영향평가: 2020.06 ~ 2023.05 재해영향평가: 2020.06 ~ 2023.01
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회: 2021.03 ~
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.02 ~ 실시설계: 2023.04 ~ 2023.11 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2024.06 공사 기간: 2024.05 ~ 2027.10 감독자: [redacted], 실적): 95, 68
2023.12 : 공사 계약의뢰 2024.06 : 공사 착공
future_plan_redacted□ 향후계획 2023.12 : 공사 계약의뢰 2024.06 : 공사 착공
attachment_count0
source_detail_sha25687103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232505|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6d2f91a380a4b636

Sources EV-620834514a01c411c3c4cfe5
Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1
행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942
Source snapshots by date · KOR · kepco_planned

154kV 문경분기 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7bf4cb9132765f1b
stable_project_keyprjtDef:232505:ESB
project_definition232505
first_region_codeESB
manual_source_formatfalse
project_name154kV 문경분기 건설사업
project_name_list154kV 문경분기 송전선로 건설사업
purpose(기설) 154KV 문경S/S 계통보강
project_region_detail경상북도 문경시
project_period_raw2018.10~2026.10
project_scale_rawACSR 330㎣×S×2C - 11.4KM, 28기
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6d2f91a380a4b636
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_7bf4cb9132765f1b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7bf4cb9132765f1b

Sources EV-497bef838c3ffa7ee91c9efc
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1c22d7d7a386a5f3817a30d383e1a7547cdb83e9f39a185a1d1e8566256014c9
Power assets and projects · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-4013c2b68a864383cc9575da
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4ffef9cbfc3fb34d
stable_project_keyprjtDef:231621:ESB
project_definition231621
first_region_codeESB
manual_source_formatfalse
project_name154kV 박촌(구.임학#2) 건설사업
project_name_list154kV 박촌(구.임학#2) 건설사업
purpose계양 테크노밸리 신규전력 공급
project_region_detail인천광역시 계양구
project_period_raw2020.12~2027.04
project_scale_raw154KV M.TR(60MVA) × 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_47628e26f1dc267d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_4ffef9cbfc3fb34d

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4ffef9cbfc3fb34d

Sources EV-4013c2b68a864383cc9575da
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 79e028335918eb20be12ff13b5839a675369cd596db1b5b2668b0fb98e1a31f2
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-12-23
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2025-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12-30
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2028-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2020-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-08-28
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-05-14
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source snapshots by date · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_47628e26f1dc267d
stable_project_idkproj_4ffef9cbfc3fb34d
source_key202609|231621|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 박촌(구.임학#2) 건설사업
project_name_detail154kV 박촌(구.임학#2) 건설사업
region_summary_raw인천광역시 계양구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 계양 테크노밸리 신규전력 공급
Project region
  • 인천광역시 계양구
Project period
  • 2020.12~2027.04
사업 규모
  • 154KV M.TR(60MVA) × 2BANK
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
  • 제10차 장기송변전설비계획 반영(2024.05)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.09 참여 위원 수 : 11 경과지(부지) 확정: 2026.06
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
  • 2025.12
사업설계
  • 설계용역: 2026.01 ~ 2026.10 기본설계: 2025.05 ~ 2025.07 실시설계: 2026.01 ~ 2026.11 설계담당자: [redacted]
[추진실적] □ '20.12.23 : 수도권 3기 신도시 계통 재구성 추진안(계통계획처) □ '24.05.14 : 단기 송변전설비계획 적정성 검토결과 반영 준공목표 변경 ※ `25년 11월 → `27년 4월 □ '25.08.28 : 장기 송·변전설비계획 건설여건 적정성 검토 결과 제출 중 ※ 준공목표 변경 `27년 04월 → `28년 9월 □ '25.12.30 : 국토부 고시 변경 승인 [향후계획] □ '26.10 : 변전소 토건/변전공사 착공 □ '27.04 : 준공(기기가압) - '28.09 : 준공목표변경중(LH 선행공정 미완료로 지연)
future_plan_redacted□ 향후계획 [추진실적] □ '20.12.23 : 수도권 3기 신도시 계통 재구성 추진안(계통계획처) □ '24.05.14 : 단기 송변전설비계획 적정성 검토결과 반영 준공목표 변경 ※ `25년 11월 → `27년 4월 □ '25.08.28 : 장기 송·변전설비계획 건설여건 적정성 검토 결과 제출 중 ※ 준공목표 변경 `27년 04월 → `28년 9월 □ '25.12.30 : 국토부 고시 변경 승인 [향후계획] □ '26.10 : 변전소 토건/변전공사 착공 □ '27.04 : 준공(기기가압) - '28.09 : 준공목표변경중(LH 선행공정 미완료로 지연)
attachment_count0
source_detail_sha2569e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231621|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source snapshots by date · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4ffef9cbfc3fb34d
stable_project_keyprjtDef:231621:ESB
project_definition231621
first_region_codeESB
manual_source_formatfalse
project_name154kV 박촌(구.임학#2) 건설사업
project_name_list154kV 박촌(구.임학#2) 건설사업
purpose계양 테크노밸리 신규전력 공급
project_region_detail인천광역시 계양구
project_period_raw2020.12~2027.04
project_scale_raw154KV M.TR(60MVA) × 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_47628e26f1dc267d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_4ffef9cbfc3fb34d

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4ffef9cbfc3fb34d

Sources EV-4013c2b68a864383cc9575da
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 79e028335918eb20be12ff13b5839a675369cd596db1b5b2668b0fb98e1a31f2
Power assets and projects · KOR · kepco_planned

154kV 방여울분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-13e887feb61009265412c2d9
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_42ee30c30393a352
stable_project_keyprjtDef:233219:ESB
project_definition233219
first_region_codeESB
manual_source_formatfalse
project_name154kV 방여울분기 지중T/L 건설사업
project_name_list154kV 방여울분기 지중T/L 건설사업
purpose154KV 방여울S/S 건설에 따른 송전선로 건설
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2025.07~2025.10
project_scale_rawXLPE 2500㎟ 4C-0.25KM
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_5703e9719cf80ecf
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_42ee30c30393a352

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_42ee30c30393a352

Sources EV-13e887feb61009265412c2d9
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 64a258bad14de6ad0b210016c17ca7b0e983d52568e7d8e9d6d406a4d501a9db
Source schedule candidates · KOR · kepco_planned

154kV 방여울분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233219|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5703e9719cf80ecf

Sources EV-0baf4122a48636725f60d325
Evidence SHA-256 62bab91aca1e1411fd71e67ca1a0960de9cf837c3b6f5e6d73eed908fb67a0fc
행 SHA-256 924ee6ebafb0fb7acca17c202d58a71fda3156d16727afb0a83d56db8a3341f3
Source schedule candidates · KOR · kepco_planned

154kV 방여울분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233219|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5703e9719cf80ecf

Sources EV-0baf4122a48636725f60d325
Evidence SHA-256 62bab91aca1e1411fd71e67ca1a0960de9cf837c3b6f5e6d73eed908fb67a0fc
행 SHA-256 924ee6ebafb0fb7acca17c202d58a71fda3156d16727afb0a83d56db8a3341f3
Source snapshots by date · KOR · kepco_planned

154kV 방여울분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_5703e9719cf80ecf
stable_project_idkproj_42ee30c30393a352
source_key202609|233219|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 방여울분기 지중T/L 건설사업
project_name_detail154kV 방여울분기 지중T/L 건설사업
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw지중송전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 154KV 방여울S/S 건설에 따른 송전선로 건설
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2025.07~2025.10
사업 규모
  • XLPE 2500㎟ 4C-0.25KM
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2025.01 ~ 2025.06 기본설계: 2024.09 ~ 2024.12 실시설계: 2025.01 ~ 2025.04 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.07 공사 기간: 2025.07 ~ 2026.11 감독자: [redacted], 실적): 100, 82
[추진실적] - 24.12 : 기본설계 완료 - 25.04 : 주자재 계약 - 25.04 : 실시설계 완료 - 25.07 : 공사 및 감리용역 착공 - 25.12 : 고덕-방여울, 방여울-진위#2T/L 실부하 가압 - 26.01 : 고덕-진위#1T/L 휴전 불가로 공사중지 [향후계획] - 26.09 : 고덕-진위#1T/L 휴전작업 시행 - 26.10 : 고덕-방여울, 방여울-진위 #1T/L 실부하가압 - 26.11 : 공사 및 감리용역 준공
future_plan_redacted□ 향후계획 [추진실적] - 24.12 : 기본설계 완료 - 25.04 : 주자재 계약 - 25.04 : 실시설계 완료 - 25.07 : 공사 및 감리용역 착공 - 25.12 : 고덕-방여울, 방여울-진위#2T/L 실부하 가압 - 26.01 : 고덕-진위#1T/L 휴전 불가로 공사중지 [향후계획] - 26.09 : 고덕-진위#1T/L 휴전작업 시행 - 26.10 : 고덕-방여울, 방여울-진위 #1T/L 실부하가압 - 26.11 : 공사 및 감리용역 준공
attachment_count0
source_detail_sha25662bab91aca1e1411fd71e67ca1a0960de9cf837c3b6f5e6d73eed908fb67a0fc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233219|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5703e9719cf80ecf

Sources EV-0baf4122a48636725f60d325
Evidence SHA-256 62bab91aca1e1411fd71e67ca1a0960de9cf837c3b6f5e6d73eed908fb67a0fc
행 SHA-256 924ee6ebafb0fb7acca17c202d58a71fda3156d16727afb0a83d56db8a3341f3
Source snapshots by date · KOR · kepco_planned

154kV 방여울분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_42ee30c30393a352
stable_project_keyprjtDef:233219:ESB
project_definition233219
first_region_codeESB
manual_source_formatfalse
project_name154kV 방여울분기 지중T/L 건설사업
project_name_list154kV 방여울분기 지중T/L 건설사업
purpose154KV 방여울S/S 건설에 따른 송전선로 건설
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2025.07~2025.10
project_scale_rawXLPE 2500㎟ 4C-0.25KM
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_5703e9719cf80ecf
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_42ee30c30393a352

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_42ee30c30393a352

Sources EV-13e887feb61009265412c2d9
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 64a258bad14de6ad0b210016c17ca7b0e983d52568e7d8e9d6d406a4d501a9db
Power assets and projects · KOR · kepco_planned

154kV 배곧(舊정왕#2)S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-9bc19e26d17989369ed9487e
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_54dc075686b7f1dc
stable_project_keyprjtDef:231419:ESB
project_definition231419
first_region_codeESB
manual_source_formatfalse
project_name154kV 배곧(舊정왕#2)S/S 건설사업
project_name_list154,000V 배곧변전소 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail경기도 시흥시
project_period_raw2017.07~2028.12
project_scale_raw154KV M.TR 60MVA X 2BANK(최종 4BANK)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bc41ec63134d9dbc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_54dc075686b7f1dc

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_54dc075686b7f1dc

Sources EV-9bc19e26d17989369ed9487e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d33394dab953a991941184db45cc959ab59f6ce02a61ae76f8de2a26aa55e355
Source schedule candidates · KOR · kepco_planned

154kV 배곧(舊정왕#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231419|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bc41ec63134d9dbc

Sources EV-7798c72c043e8d2755e880bc
Evidence SHA-256 12e4496f2a90a93082fc6445e550dc11e0268e8b66fdbf5fd8b05dff5a714996
행 SHA-256 5f3d9e07f06196d26631f5395607e1b9aef30e847267d78f282ec314f4902a7c
Source schedule candidates · KOR · kepco_planned

154kV 배곧(舊정왕#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2017-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231419|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bc41ec63134d9dbc

Sources EV-7798c72c043e8d2755e880bc
Evidence SHA-256 12e4496f2a90a93082fc6445e550dc11e0268e8b66fdbf5fd8b05dff5a714996
행 SHA-256 5f3d9e07f06196d26631f5395607e1b9aef30e847267d78f282ec314f4902a7c
Source snapshots by date · KOR · kepco_planned

154kV 배곧(舊정왕#2)S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_bc41ec63134d9dbc
stable_project_idkproj_54dc075686b7f1dc
source_key202609|231419|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154,000V 배곧변전소 건설사업
project_name_detail154kV 배곧(舊정왕#2)S/S 건설사업
region_summary_raw경기도 시흥시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 경기도 시흥시
Project period
  • 2017.07~2028.12
사업 규모
  • 154KV M.TR 60MVA X 2BANK(최종 4BANK)
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2019.10 참여 위원 수 : 경과지(부지) 확정: 2020.03
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • ○ 서울대학교 시흥캠퍼스 학내 변전소 설치로, 한전 자체 입지선정위원회 구성
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2026.07 ~ 2026.07 실시설계: 설계담당자: [redacted]
○ '27.03 : 변전공사 착공 ○ '28.12 : 변전소 가압
future_plan_redacted□ 향후계획 ○ '27.03 : 변전공사 착공 ○ '28.12 : 변전소 가압
attachment_count0
source_detail_sha25612e4496f2a90a93082fc6445e550dc11e0268e8b66fdbf5fd8b05dff5a714996
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231419|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bc41ec63134d9dbc

Sources EV-7798c72c043e8d2755e880bc
Evidence SHA-256 12e4496f2a90a93082fc6445e550dc11e0268e8b66fdbf5fd8b05dff5a714996
행 SHA-256 5f3d9e07f06196d26631f5395607e1b9aef30e847267d78f282ec314f4902a7c
Source snapshots by date · KOR · kepco_planned

154kV 배곧(舊정왕#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_54dc075686b7f1dc
stable_project_keyprjtDef:231419:ESB
project_definition231419
first_region_codeESB
manual_source_formatfalse
project_name154kV 배곧(舊정왕#2)S/S 건설사업
project_name_list154,000V 배곧변전소 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail경기도 시흥시
project_period_raw2017.07~2028.12
project_scale_raw154KV M.TR 60MVA X 2BANK(최종 4BANK)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bc41ec63134d9dbc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_54dc075686b7f1dc

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_54dc075686b7f1dc

Sources EV-9bc19e26d17989369ed9487e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d33394dab953a991941184db45cc959ab59f6ce02a61ae76f8de2a26aa55e355
Power assets and projects · KOR · kepco_planned

154kV 배곧-서시화 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-24de0d66b6ba44964dcc6382
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_43e3bcc957e19f3d
stable_project_keyprjtDef:233439:ESB
project_definition233439
first_region_codeESB
manual_source_formatfalse
project_name154kV 배곧-서시화 지중T/L 건설사업
project_name_list154kV 배곧-서시화 지중T/L 건설사업
purpose배곧신도시 부하공급능력 확보 및 시흥지역
project_region_detail경기도 시흥시
project_period_raw2027.07~2028.12
project_scale_raw154KV XLPE 2,000,2C - 1.0KM
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type지중송전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0ad06f6383ba4b54
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_43e3bcc957e19f3d

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_43e3bcc957e19f3d

Sources EV-24de0d66b6ba44964dcc6382
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 5a15ed819068de337ebc95e48a4ee3d2e67de7349302f0765b6717a71617f351
Source schedule candidates · KOR · kepco_planned

154kV 배곧-서시화 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2027-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233439|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0ad06f6383ba4b54

Sources EV-a2274fc4945c837bfab1e623
Evidence SHA-256 a273f983102aae4991411522b082f28b72415f8f5e84b13bdb1317b9d5a0abb1
행 SHA-256 c7ddbf3dc1afca6f317803b776ee70a57e514e4bc777c780efaf4baeff8b4f7f
Source schedule candidates · KOR · kepco_planned

154kV 배곧-서시화 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233439|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0ad06f6383ba4b54

Sources EV-a2274fc4945c837bfab1e623
Evidence SHA-256 a273f983102aae4991411522b082f28b72415f8f5e84b13bdb1317b9d5a0abb1
행 SHA-256 c7ddbf3dc1afca6f317803b776ee70a57e514e4bc777c780efaf4baeff8b4f7f
Source snapshots by date · KOR · kepco_planned

154kV 배곧-서시화 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_0ad06f6383ba4b54
stable_project_idkproj_43e3bcc957e19f3d
source_key202609|233439|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 배곧-서시화 지중T/L 건설사업
project_name_detail154kV 배곧-서시화 지중T/L 건설사업
region_summary_raw경기도 시흥시등 1 지역
equipment_type_raw지중송전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 배곧신도시 부하공급능력 확보 및 시흥지역
Project region
  • 경기도 시흥시
Project period
  • 2027.07~2028.12
사업 규모
  • 154KV XLPE 2,000,2C - 1.0KM
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
기본설계자료 수집
future_plan_redacted□ 향후계획 기본설계자료 수집
attachment_count0
source_detail_sha256a273f983102aae4991411522b082f28b72415f8f5e84b13bdb1317b9d5a0abb1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233439|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0ad06f6383ba4b54

Sources EV-a2274fc4945c837bfab1e623
Evidence SHA-256 a273f983102aae4991411522b082f28b72415f8f5e84b13bdb1317b9d5a0abb1
행 SHA-256 c7ddbf3dc1afca6f317803b776ee70a57e514e4bc777c780efaf4baeff8b4f7f
Source snapshots by date · KOR · kepco_planned

154kV 배곧-서시화 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_43e3bcc957e19f3d
stable_project_keyprjtDef:233439:ESB
project_definition233439
first_region_codeESB
manual_source_formatfalse
project_name154kV 배곧-서시화 지중T/L 건설사업
project_name_list154kV 배곧-서시화 지중T/L 건설사업
purpose배곧신도시 부하공급능력 확보 및 시흥지역
project_region_detail경기도 시흥시
project_period_raw2027.07~2028.12
project_scale_raw154KV XLPE 2,000,2C - 1.0KM
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type지중송전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0ad06f6383ba4b54
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_43e3bcc957e19f3d

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_43e3bcc957e19f3d

Sources EV-24de0d66b6ba44964dcc6382
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 5a15ed819068de337ebc95e48a4ee3d2e67de7349302f0765b6717a71617f351

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel