POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 18items · current page 1–18 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-2b356c64cff8dfd76b58d018
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0f2f2af5c4c45967
stable_project_keyprjtDef:232409:ESB
project_definition232409
first_region_codeESB
manual_source_formatfalse
project_name154kV 명곡분기T/L 건설사업
project_name_list154kV 명곡분기 송전선로 건설사업
purpose신설 154KV 명곡S/S 신규부하 공급
project_region_detail대구광역시 달성군
project_period_raw2020.06~2026.04
project_scale_rawACSR 410*2B*4회선, 0.15KM(각 2C)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d7b696207ae69f77
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_0f2f2af5c4c45967

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0f2f2af5c4c45967

Sources EV-2b356c64cff8dfd76b58d018
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4a41f2ce3fbd9cc74d6edfb0d01dfb496ed22985248b201e0ed8170679e7fad6
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2020-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2022-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2020-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source schedule candidates · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232409|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source snapshots by date · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d7b696207ae69f77
stable_project_idkproj_0f2f2af5c4c45967
source_key202609|232409|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 명곡분기 송전선로 건설사업
project_name_detail154kV 명곡분기T/L 건설사업
region_summary_raw대구광역시 달성군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 신설 154KV 명곡S/S 신규부하 공급
Project region
  • 대구광역시 달성군
Project period
  • 2020.06~2026.04
사업 규모
  • ACSR 410*2B*4회선, 0.15KM(각 2C)
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2020.09
환경/재해 영향평가
  • 환경영향평가: 2020.11 ~ 2022.04 재해영향평가: 2020.11 ~ 2022.04
주민의견 수렴
  • 지자체 공고 열람: 2020.06 ~ 2020.06 설명회·공청회: 2020.06 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 2023.09 ~ 2025.01 설계담당자: [redacted]
□ 진행경과 - 20.09 : 입지확정 - 22.12 : 전원개발사업 실시계획 변경승인 - 25.05 : 공사착공 □ 향후계획 - 26년 4월 준공
future_plan_redacted□ 향후계획 □ 진행경과 - 20.09 : 입지확정 - 22.12 : 전원개발사업 실시계획 변경승인 - 25.05 : 공사착공 □ 향후계획 - 26년 4월 준공
attachment_count0
source_detail_sha25677f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232409|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d7b696207ae69f77

Sources EV-4f05c4844e156066ea0195ce
Evidence SHA-256 77f9bc9b38500df06a9c34a5aabd139b7dfa15adbe35595e9bd04977a9d0fc3d
행 SHA-256 49fd77c5bfc61f241c82053ca2959902d850f610bbf156ebf993cee2859f3832
Source snapshots by date · KOR · kepco_planned

154kV 명곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0f2f2af5c4c45967
stable_project_keyprjtDef:232409:ESB
project_definition232409
first_region_codeESB
manual_source_formatfalse
project_name154kV 명곡분기T/L 건설사업
project_name_list154kV 명곡분기 송전선로 건설사업
purpose신설 154KV 명곡S/S 신규부하 공급
project_region_detail대구광역시 달성군
project_period_raw2020.06~2026.04
project_scale_rawACSR 410*2B*4회선, 0.15KM(각 2C)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d7b696207ae69f77
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_0f2f2af5c4c45967

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0f2f2af5c4c45967

Sources EV-2b356c64cff8dfd76b58d018
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4a41f2ce3fbd9cc74d6edfb0d01dfb496ed22985248b201e0ed8170679e7fad6

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel