Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 배곧-서시화 지중T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-24de0d66b6ba44964dcc6382
Sources EV-a2274fc4945c837bfab1e623 Evidence SHA-256 a273f983102aae4991411522b082f28b72415f8f5e84b13bdb1317b9d5a0abb1 행 SHA-256 c7ddbf3dc1afca6f317803b776ee70a57e514e4bc777c780efaf4baeff8b4f7fSource snapshots by date · KOR · kepco_planned
154kV 배곧-서시화 지중T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_0ad06f6383ba4b54
stable_project_id
kproj_43e3bcc957e19f3d
source_key
202609|233439|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 배곧-서시화 지중T/L 건설사업
project_name_detail
154kV 배곧-서시화 지중T/L 건설사업
region_summary_raw
경기도 시흥시등 1 지역
equipment_type_raw
지중송전
headquarters_raw
경인건설본부
office_raw
남서울인천건설지사
section_fields
Project purpose
배곧신도시 부하공급능력 확보 및 시흥지역
Project region
경기도 시흥시
Project period
2027.07~2028.12
사업 규모
154KV XLPE 2,000,2C - 1.0KM
담당 사업소
경인건설본부/남서울인천건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-a2274fc4945c837bfab1e623 Evidence SHA-256 a273f983102aae4991411522b082f28b72415f8f5e84b13bdb1317b9d5a0abb1 행 SHA-256 c7ddbf3dc1afca6f317803b776ee70a57e514e4bc777c780efaf4baeff8b4f7fSource snapshots by date · KOR · kepco_planned