POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 9items · current page 1–9 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-8a666008670b7ab70a54436e
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0b8a2339212a4fa1
stable_project_keyprjtDef:233886:ESB
project_definition233886
first_region_codeESB
manual_source_formatfalse
project_name154kV 득량분기 지중T/L 건설사업
project_name_list154kV 득량분기 지중송전선로 건설사업
purpose용량 증가에 따른 계통보강
project_region_detail전남광주통합특별시 보성군
project_period_raw2020.03~2026.12
project_scale_raw154KV XLPE X2500 4C 1KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a9b87f4a1d3953a4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_0b8a2339212a4fa1

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0b8a2339212a4fa1

Sources EV-8a666008670b7ab70a54436e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 11c3d11a2fbe702dc4315112db467492c4bf9bdda2525039dc5211c93d6140a6
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2027-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2028-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2027-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2020-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source schedule candidates · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2027-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233886|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source snapshots by date · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a9b87f4a1d3953a4
stable_project_idkproj_0b8a2339212a4fa1
source_key202609|233886|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 득량분기 지중송전선로 건설사업
project_name_detail154kV 득량분기 지중T/L 건설사업
region_summary_raw전남광주통합특별시 보성군등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 용량 증가에 따른 계통보강
Project region
  • 전남광주통합특별시 보성군
Project period
  • 2020.03~2026.12
사업 규모
  • 154KV XLPE X2500 4C 1KM
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○ '27.01 기본설계 완료 ○ '27.07 실시설계 완료 ○ '27.10 착공 ○ '28.04 가압
future_plan_redacted□ 향후계획 ○ '27.01 기본설계 완료 ○ '27.07 실시설계 완료 ○ '27.10 착공 ○ '28.04 가압
attachment_count0
source_detail_sha25637b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233886|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a9b87f4a1d3953a4

Sources EV-ae7bc87dd297465c7b76993a
Evidence SHA-256 37b03d46daa0dda7cc708352c4bcc31a6491b3b7f4d11b4920aae22f0bed65a9
행 SHA-256 5519a17ae29e723c0b347e58df2e38a19f3f4ed63c7aca0a22cf8d57992574b1
Source snapshots by date · KOR · kepco_planned

154kV 득량분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0b8a2339212a4fa1
stable_project_keyprjtDef:233886:ESB
project_definition233886
first_region_codeESB
manual_source_formatfalse
project_name154kV 득량분기 지중T/L 건설사업
project_name_list154kV 득량분기 지중송전선로 건설사업
purpose용량 증가에 따른 계통보강
project_region_detail전남광주통합특별시 보성군
project_period_raw2020.03~2026.12
project_scale_raw154KV XLPE X2500 4C 1KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a9b87f4a1d3953a4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_0b8a2339212a4fa1

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0b8a2339212a4fa1

Sources EV-8a666008670b7ab70a54436e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 11c3d11a2fbe702dc4315112db467492c4bf9bdda2525039dc5211c93d6140a6

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel