POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 24items · current page 1–24 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-497bef838c3ffa7ee91c9efc
Detailed source fields Original source field Published value or condition stable_project_id kproj_7bf4cb9132765f1b stable_project_key prjtDef:232505:ESB project_definition 232505 first_region_code ESB manual_source_format false project_name 154kV 문경분기 건설사업 project_name_list 154kV 문경분기 송전선로 건설사업 purpose (기설) 154KV 문경S/S 계통보강 project_region_detail 경상북도 문경시 project_period_raw 2018.10~2026.10 project_scale_raw ACSR 330㎣×S×2C - 11.4KM, 28기 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_7bf4cb9132765f1b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7bf4cb9132765f1b
Sources EV-497bef838c3ffa7ee91c9efc Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1c22d7d7a386a5f3817a30d383e1a7547cdb83e9f39a185a1d1e8566256014c9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2019-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2011-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2020-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232505|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_6d2f91a380a4b636 stable_project_id kproj_7bf4cb9132765f1b source_key 202609|232505|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 문경분기 송전선로 건설사업 project_name_detail 154kV 문경분기 건설사업 region_summary_raw 경상북도 문경시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 사업 규모 ACSR 330㎣×S×2C - 11.4KM, 28기 입지선정 전력입지영향평가 용역 착수: 2018.10 입지선정위원회 구성시기: 2020.01 참여 위원 수 : 15 지장유무 조회: 2019.12~ 경과지(부지) 확정: 2020.01 환경/재해 영향평가 환경영향평가: 2020.06 ~ 2023.05 재해영향평가: 2020.06 ~ 2023.01 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 2021.03 ~ 사업설계 설계용역: 기본설계: 2022.02 ~ 실시설계: 2023.04 ~ 2023.11 설계담당자: [redacted] 건설공사 개요 공사 착공: 2024.06 공사 기간: 2024.05 ~ 2027.10 감독자: [redacted], 실적): 95, 68 2023.12 : 공사 계약의뢰 2024.06 : 공사 착공 future_plan_redacted □ 향후계획 2023.12 : 공사 계약의뢰 2024.06 : 공사 착공 attachment_count 0 source_detail_sha256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232505|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6d2f91a380a4b636
Sources EV-620834514a01c411c3c4cfe5 Evidence SHA-256 87103b47d07845497f451a9155bcced8d2bd8d54f38ecc8315b101d61dd130e1 행 SHA-256 a2aee9c3c4f3490cd525c1698a1db98cb13ab77b44480da287a9887e23149942 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_7bf4cb9132765f1b stable_project_key prjtDef:232505:ESB project_definition 232505 first_region_code ESB manual_source_format false project_name 154kV 문경분기 건설사업 project_name_list 154kV 문경분기 송전선로 건설사업 purpose (기설) 154KV 문경S/S 계통보강 project_region_detail 경상북도 문경시 project_period_raw 2018.10~2026.10 project_scale_raw ACSR 330㎣×S×2C - 11.4KM, 28기 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_7bf4cb9132765f1b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7bf4cb9132765f1b
Sources EV-497bef838c3ffa7ee91c9efc Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1c22d7d7a386a5f3817a30d383e1a7547cdb83e9f39a185a1d1e8566256014c9 Observations for this power asset History for this project