POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 24items · current page 1–24 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4013c2b68a864383cc9575da
Detailed source fields Original source field Published value or condition stable_project_id kproj_4ffef9cbfc3fb34d stable_project_key prjtDef:231621:ESB project_definition 231621 first_region_code ESB manual_source_format false project_name 154kV 박촌(구.임학#2) 건설사업 project_name_list 154kV 박촌(구.임학#2) 건설사업 purpose 계양 테크노밸리 신규전력 공급 project_region_detail 인천광역시 계양구 project_period_raw 2020.12~2027.04 project_scale_raw 154KV M.TR(60MVA) × 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_4ffef9cbfc3fb34d
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_4ffef9cbfc3fb34d
Sources EV-4013c2b68a864383cc9575da Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 79e028335918eb20be12ff13b5839a675369cd596db1b5b2668b0fb98e1a31f2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-12-23 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12-30 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2020-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-08-28 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-05-14 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231621|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_47628e26f1dc267d stable_project_id kproj_4ffef9cbfc3fb34d source_key 202609|231621|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 박촌(구.임학#2) 건설사업 project_name_detail 154kV 박촌(구.임학#2) 건설사업 region_summary_raw 인천광역시 계양구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV M.TR(60MVA) × 2BANK 계획확정 제10차 장기송변전설비계획 반영(2024.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.09 참여 위원 수 : 11 경과지(부지) 확정: 2026.06 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2026.01 ~ 2026.10 기본설계: 2025.05 ~ 2025.07 실시설계: 2026.01 ~ 2026.11 설계담당자: [redacted] [추진실적] □ '20.12.23 : 수도권 3기 신도시 계통 재구성 추진안(계통계획처) □ '24.05.14 : 단기 송변전설비계획 적정성 검토결과 반영 준공목표 변경 ※ `25년 11월 → `27년 4월 □ '25.08.28 : 장기 송·변전설비계획 건설여건 적정성 검토 결과 제출 중 ※ 준공목표 변경 `27년 04월 → `28년 9월 □ '25.12.30 : 국토부 고시 변경 승인 [향후계획] □ '26.10 : 변전소 토건/변전공사 착공 □ '27.04 : 준공(기기가압) - '28.09 : 준공목표변경중(LH 선행공정 미완료로 지연) future_plan_redacted □ 향후계획 [추진실적] □ '20.12.23 : 수도권 3기 신도시 계통 재구성 추진안(계통계획처) □ '24.05.14 : 단기 송변전설비계획 적정성 검토결과 반영 준공목표 변경 ※ `25년 11월 → `27년 4월 □ '25.08.28 : 장기 송·변전설비계획 건설여건 적정성 검토 결과 제출 중 ※ 준공목표 변경 `27년 04월 → `28년 9월 □ '25.12.30 : 국토부 고시 변경 승인 [향후계획] □ '26.10 : 변전소 토건/변전공사 착공 □ '27.04 : 준공(기기가압) - '28.09 : 준공목표변경중(LH 선행공정 미완료로 지연) attachment_count 0 source_detail_sha256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231621|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_47628e26f1dc267d
Sources EV-63f6aecae2edb392f31e4bcf Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55 행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_4ffef9cbfc3fb34d stable_project_key prjtDef:231621:ESB project_definition 231621 first_region_code ESB manual_source_format false project_name 154kV 박촌(구.임학#2) 건설사업 project_name_list 154kV 박촌(구.임학#2) 건설사업 purpose 계양 테크노밸리 신규전력 공급 project_region_detail 인천광역시 계양구 project_period_raw 2020.12~2027.04 project_scale_raw 154KV M.TR(60MVA) × 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_4ffef9cbfc3fb34d
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_4ffef9cbfc3fb34d
Sources EV-4013c2b68a864383cc9575da Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 79e028335918eb20be12ff13b5839a675369cd596db1b5b2668b0fb98e1a31f2 Observations for this power asset History for this project