POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 24items · current page 1–24 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-4013c2b68a864383cc9575da
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4ffef9cbfc3fb34d
stable_project_keyprjtDef:231621:ESB
project_definition231621
first_region_codeESB
manual_source_formatfalse
project_name154kV 박촌(구.임학#2) 건설사업
project_name_list154kV 박촌(구.임학#2) 건설사업
purpose계양 테크노밸리 신규전력 공급
project_region_detail인천광역시 계양구
project_period_raw2020.12~2027.04
project_scale_raw154KV M.TR(60MVA) × 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_47628e26f1dc267d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_4ffef9cbfc3fb34d

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4ffef9cbfc3fb34d

Sources EV-4013c2b68a864383cc9575da
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 79e028335918eb20be12ff13b5839a675369cd596db1b5b2668b0fb98e1a31f2
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-12-23
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2025-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12-30
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2028-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2020-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-08-28
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-05-14
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source schedule candidates · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source snapshots by date · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_47628e26f1dc267d
stable_project_idkproj_4ffef9cbfc3fb34d
source_key202609|231621|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 박촌(구.임학#2) 건설사업
project_name_detail154kV 박촌(구.임학#2) 건설사업
region_summary_raw인천광역시 계양구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 계양 테크노밸리 신규전력 공급
Project region
  • 인천광역시 계양구
Project period
  • 2020.12~2027.04
사업 규모
  • 154KV M.TR(60MVA) × 2BANK
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
  • 제10차 장기송변전설비계획 반영(2024.05)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.09 참여 위원 수 : 11 경과지(부지) 확정: 2026.06
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
  • 2025.12
사업설계
  • 설계용역: 2026.01 ~ 2026.10 기본설계: 2025.05 ~ 2025.07 실시설계: 2026.01 ~ 2026.11 설계담당자: [redacted]
[추진실적] □ '20.12.23 : 수도권 3기 신도시 계통 재구성 추진안(계통계획처) □ '24.05.14 : 단기 송변전설비계획 적정성 검토결과 반영 준공목표 변경 ※ `25년 11월 → `27년 4월 □ '25.08.28 : 장기 송·변전설비계획 건설여건 적정성 검토 결과 제출 중 ※ 준공목표 변경 `27년 04월 → `28년 9월 □ '25.12.30 : 국토부 고시 변경 승인 [향후계획] □ '26.10 : 변전소 토건/변전공사 착공 □ '27.04 : 준공(기기가압) - '28.09 : 준공목표변경중(LH 선행공정 미완료로 지연)
future_plan_redacted□ 향후계획 [추진실적] □ '20.12.23 : 수도권 3기 신도시 계통 재구성 추진안(계통계획처) □ '24.05.14 : 단기 송변전설비계획 적정성 검토결과 반영 준공목표 변경 ※ `25년 11월 → `27년 4월 □ '25.08.28 : 장기 송·변전설비계획 건설여건 적정성 검토 결과 제출 중 ※ 준공목표 변경 `27년 04월 → `28년 9월 □ '25.12.30 : 국토부 고시 변경 승인 [향후계획] □ '26.10 : 변전소 토건/변전공사 착공 □ '27.04 : 준공(기기가압) - '28.09 : 준공목표변경중(LH 선행공정 미완료로 지연)
attachment_count0
source_detail_sha2569e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231621|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_47628e26f1dc267d

Sources EV-63f6aecae2edb392f31e4bcf
Evidence SHA-256 9e90f53a7316369f295d0abdd5b46cc279bf39f51fb325c34716cbbbf7095a55
행 SHA-256 530934a7afacdef34daf78861ab53defb8360dc3301e4911afefe49c4e619e48
Source snapshots by date · KOR · kepco_planned

154kV 박촌(구.임학#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4ffef9cbfc3fb34d
stable_project_keyprjtDef:231621:ESB
project_definition231621
first_region_codeESB
manual_source_formatfalse
project_name154kV 박촌(구.임학#2) 건설사업
project_name_list154kV 박촌(구.임학#2) 건설사업
purpose계양 테크노밸리 신규전력 공급
project_region_detail인천광역시 계양구
project_period_raw2020.12~2027.04
project_scale_raw154KV M.TR(60MVA) × 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_47628e26f1dc267d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_4ffef9cbfc3fb34d

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4ffef9cbfc3fb34d

Sources EV-4013c2b68a864383cc9575da
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 79e028335918eb20be12ff13b5839a675369cd596db1b5b2668b0fb98e1a31f2

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel