POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 11items · current page 1–11 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-10
Sources EV-0c1cd9c4ecc58c445a4c356d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_06d31cda9833cc16
stable_project_keyprjtDef:232425:ESB
project_definition232425
first_region_codeESB
manual_source_formatfalse
project_name154kV 명례#2개폐소분기T/L 건설사업
project_name_list154kV 명례#2개폐소분기T/L 건설사업
purpose명례-장안T/L 고장대비 계통보강
project_region_detailGijang County, Busan Metropolitan City
project_period_raw2025.06~2031.10
project_scale_rawACSR 330㎟ X S X 6C - 0.1KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_7c8f0e7eda735156
  • ksnap_e595f52d68e5c030
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_06d31cda9833cc16

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_06d31cda9833cc16

Sources EV-0c1cd9c4ecc58c445a4c356d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d01204e0fb770c57911eff30afe6c0e3616f415e4f9f874591aeefabc8fb1eab
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232425|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232425|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c8f0e7eda735156

Sources EV-f4f1d1b215281624f1de8d85
Evidence SHA-256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab
행 SHA-256 96a3d044585079c7441f2f924bf07736a2ea3fe39bb91bf657202a6d953c9769
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232425|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c8f0e7eda735156

Sources EV-f4f1d1b215281624f1de8d85
Evidence SHA-256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab
행 SHA-256 96a3d044585079c7441f2f924bf07736a2ea3fe39bb91bf657202a6d953c9769
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232425|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232425|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232425|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source schedule candidates · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232425|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source snapshots by date · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_7c8f0e7eda735156
stable_project_idkproj_06d31cda9833cc16
source_key202609|232425|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 명례#2개폐소분기T/L 건설사업
project_name_detail154kV 명례#2개폐소분기T/L 건설사업
region_summary_raw부산광역시 기장군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 명례-장안T/L 고장대비 계통보강
Project region
  • Gijang County, Busan Metropolitan City
Project period
  • 2025.06~2031.10
사업 규모
  • ACSR 330㎟ X S X 6C - 0.1KM
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.06)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
future_plan_redacted□ 향후계획 1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
attachment_count0
source_detail_sha256f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232425|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c8f0e7eda735156

Sources EV-f4f1d1b215281624f1de8d85
Evidence SHA-256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab
행 SHA-256 96a3d044585079c7441f2f924bf07736a2ea3fe39bb91bf657202a6d953c9769
Source snapshots by date · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e595f52d68e5c030
stable_project_idkproj_06d31cda9833cc16
source_key202610|232425|ESB
basic_ym202610
source_stage_raw계획확정-사업승인전
project_name_list154kV 명례#2개폐소분기T/L 건설사업
project_name_detail154kV 명례#2개폐소분기T/L 건설사업
region_summary_raw부산광역시 기장군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 명례-장안T/L 고장대비 계통보강
Project region
  • Gijang County, Busan Metropolitan City
Project period
  • 2025.06~2031.10
사업 규모
  • ACSR 330㎟ X S X 6C - 0.1KM
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.06)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • 입지선정 미실시
1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
future_plan_redacted□ 향후계획 1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
attachment_count0
source_detail_sha256a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202610
source_record_id202610|232425|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e595f52d68e5c030

Sources EV-5b3821e5d7e0e6904042d560
Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849
행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbe
Source snapshots by date · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_06d31cda9833cc16
stable_project_keyprjtDef:232425:ESB
project_definition232425
first_region_codeESB
manual_source_formatfalse
project_name154kV 명례#2개폐소분기T/L 건설사업
project_name_list154kV 명례#2개폐소분기T/L 건설사업
purpose명례-장안T/L 고장대비 계통보강
project_region_detailGijang County, Busan Metropolitan City
project_period_raw2025.06~2031.10
project_scale_rawACSR 330㎟ X S X 6C - 0.1KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_7c8f0e7eda735156
  • ksnap_e595f52d68e5c030
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_06d31cda9833cc16

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_06d31cda9833cc16

Sources EV-0c1cd9c4ecc58c445a4c356d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d01204e0fb770c57911eff30afe6c0e3616f415e4f9f874591aeefabc8fb1eab

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel