Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 11items · current page 1–11 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 명례#2개폐소분기T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-10 Sources EV-0c1cd9c4ecc58c445a4c356d
Sources EV-5b3821e5d7e0e6904042d560 Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849 행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbeSource snapshots by date · KOR · kepco_planned
154kV 명례#2개폐소분기T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_7c8f0e7eda735156
stable_project_id
kproj_06d31cda9833cc16
source_key
202609|232425|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 명례#2개폐소분기T/L 건설사업
project_name_detail
154kV 명례#2개폐소분기T/L 건설사업
region_summary_raw
부산광역시 기장군등 1 지역
equipment_type_raw
가공송전
headquarters_raw
남부건설본부
office_raw
직할
section_fields
Project purpose
명례-장안T/L 고장대비 계통보강
Project region
Gijang County, Busan Metropolitan City
Project period
2025.06~2031.10
사업 규모
ACSR 330㎟ X S X 6C - 0.1KM
담당 사업소
남부건설본부/직할
계획확정
제11차 장기송변전설비계획 반영(2025.06)
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
환경영향평가: 재해영향평가:
주민의견 수렴
지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
future_plan_redacted
□ 향후계획 1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
Sources EV-f4f1d1b215281624f1de8d85 Evidence SHA-256 f3d683d597f71b015fb6ead26b2f5c0d003ebe2136ed003b0edab7ea8a42cdab 행 SHA-256 96a3d044585079c7441f2f924bf07736a2ea3fe39bb91bf657202a6d953c9769Source snapshots by date · KOR · kepco_planned
154kV 명례#2개폐소분기T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_e595f52d68e5c030
stable_project_id
kproj_06d31cda9833cc16
source_key
202610|232425|ESB
basic_ym
202610
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 명례#2개폐소분기T/L 건설사업
project_name_detail
154kV 명례#2개폐소분기T/L 건설사업
region_summary_raw
부산광역시 기장군등 1 지역
equipment_type_raw
가공송전
headquarters_raw
남부건설본부
office_raw
직할
section_fields
Project purpose
명례-장안T/L 고장대비 계통보강
Project region
Gijang County, Busan Metropolitan City
Project period
2025.06~2031.10
사업 규모
ACSR 330㎟ X S X 6C - 0.1KM
담당 사업소
남부건설본부/직할
계획확정
제11차 장기송변전설비계획 반영(2025.06)
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
환경영향평가: 재해영향평가:
주민의견 수렴
지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
입지선정 미실시
1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
future_plan_redacted
□ 향후계획 1. 추진현황 ’25.06 : 제11차 장기 송변전설비계획 반영 ’25.09 : 기장 E-PARK일반산단 내 변전소 및 송전선로 구성 추진
Sources EV-5b3821e5d7e0e6904042d560 Evidence SHA-256 a496becb0d2c60a0eb71b6d0f3064799b041f9d2354cc39a9dfc8741b3021849 행 SHA-256 55c84b7d45f0fae8b07b34731f539705fd0f6dbeb6f8ae943b5d03bbb3bc5fbeSource snapshots by date · KOR · kepco_planned