POWER APPLICATION · 07 · Construction and Power Connection

The final stage, from electrical construction through the pre-operation inspection to the actual power connection

Distinguish between electrical design, construction, and supervision; inspections by the Korea Electrical Safety Corporation; and the commencement of power supply by KEPCO, and prepare the completion documentation.

Permit and supply conditions are incorporated into the detailed design and procurement process.

The final power supply conditions are reflected in the drawings, equipment specifications, and construction details. We review the obligations related to the approval and notification of the electrical construction plan, as well as supervision and commencement of work, and coordinate the interfaces between service connection work, on-site electrical work, and building construction. When awarding contracts for electrical work, design, and supervision, verify the principles and exceptions regarding separate contracting as stipulated in relevant laws and regulations.

Inspection preparations begin during construction, not just before the project is completed.

We maintain a record of as-built drawings, test reports, supervision and construction completion documentation, and safety management evidence. The Korea Electrical Safety Corporation’s pre-operation inspection is a procedure to verify that the facility complies with the construction plan and technical standards. The required documents vary depending on the voltage, facility type, and status of the construction plan notification.

Check the facility type and required documents in the pre-service inspection guide on the “Electrical Safety Here” website, then submit your application. The inspection schedule, on-site preparations, re-inspections following corrections, and the KEPCO service activation schedule are managed in coordination with one another. Building occupancy permits and relevant inspections—such as fire safety and telecommunications—must also be completed separately.

After power connection, integrated commissioning and operational handover remain.

Even after power is restored, the integrated operation of the UPS, generators, cooling systems, and controls—as well as the switchover to backup systems—is tested in accordance with approved safety procedures. Any outstanding issues from the commissioning results, operational training materials, emergency response procedures, and documentation regarding evaluations and consultations are handed over to the operator. The actual date of power supply and the date of commencement of commercial operation are recorded separately.

Materials to Prepare at This Stage

  • As-built drawings, test data, and documentation verifying supervision and project completion
  • Documents related to the processing of the construction plan and the appointment of a safety manager
  • Inspection Application Form, Relevant Supporting Documents, and On-Site Test Plan
  • Matters to Be Discussed Regarding the Commencement of KEPCO Supply and the Integrated Commissioning and Operational Handover Plan

Actual Application and Processing Procedures

  1. Personnel responsible for design, construction, and supervision will conduct a joint inspection of the items to be inspected and their readiness.
  2. Visit the "Electrical Safety Here" website to check the types of pre-use inspections and required documents, and then submit your application.
  3. After completing inspections and necessary corrections, we will discuss KEPCO’s procedures for commencing power supply.
  4. Operational conditions are verified following a safe test power-up, integrated commissioning, and handover to the operator.
Deliverables to be passed on to the next phase

Inspection results, basis for commencement of supply, trial operation reports, and operational handover documents. Safety management and compliance obligations during operation are also continuously monitored.

Which company should I contract with, and for what services?

Electrical Contractors and Construction Companies by Sector

Selection Date
Prior to formal application submission and related construction work
Contract Documents
Construction Contract + Authorization for Acting as an Agent in Electricity Service Applications
Deliverables
Breakdown and Schedule, Construction, Testing, and Completion Documentation, Pre-Operation Inspection and Power Connection Support Materials
Verify Scope
KEPCO/customer property boundaries, scope of service lines and power receiving equipment, whether fees and agency charges are separate, and responsibility for inspection corrections, delays, and defects
Selection Criteria
Distinguish between registered and actual construction personnel, and between the roles of design and supervision. The selection of an electrical contractor is not considered a uniform, statutory prerequisite for the technical review by the Korea Electric Power Corporation (KEPCO).

Companies Responsible for Statutory Supervision, Commissioning, and Operation

Selection Date
Supervision must begin before construction starts, and requirements for commissioning and operation must be addressed from the design phase onward.
Contract Documents
Supervision Service Contract, Integrated Commissioning Contract, Operation and Maintenance Contract
Deliverables
Inspection and Supervision Reports, Integrated Test Plans and Results, Operation Manuals, Training, and Handover
Verify Scope
Electrical, mechanical, fire protection, and telecommunications interfaces; responsibility for power outage testing and safety approvals; resolution of outstanding issues; and acceptance criteria
Selection Criteria
Supervisory qualifications and independence; distinction between statutory inspections and private trial operations; responsibilities for appointing operational staff and safety managers

Application Forms and Official Submission Channels

Korea Electrical Safety CorporationApplication for Pre-Operation Inspection and Required Documents ↗

Check the documents required for your facility type, verify your identity, and then submit your application.

Collection of Official FormsElectrical Safety Form Library ↗

Select the appropriate form for construction plans, inspections, or other related inquiries.

Opens the original text from the official agency. The attached Power System Impact Assessment form is from the November 28, 2025, announcement; please verify the applicable form and submission destination at the time of actual submission. Submitting an inquiry on this site does not constitute an application to the agency.

Do you have the data, but are you stuck on the next step?

Please let us know your current stage of the application process and the information you have on hand, and we will review the additional tasks, the role of specialized firms, and the procedure tailored to your project site.

Request for Review of Electricity and Permitting Matters

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel