POWER APPLICATION · 04 · Power System Impact Assessment

Power System Impact Assessment: What Is Submitted to and Reviewed by the Ministry of Climate

This is the process of submitting an evaluation report—which includes evidence of business viability, financial viability, and efficiency improvements, in addition to KEPCO’s response—and incorporating the review conditions into the design.

The assessment report is not limited to a single page of technical review feedback.

This single evaluation report consolidates KEPCO’s grid review results with the project, financial, and site-related data prepared by the project owner. Investment costs, financing, employment, and contributions to local finances are explained using actual supporting documentation and calculation bases. Policy items assessed by the evaluating agency are distinguished from the company’s projected scores.

Whether simplified or preferential procedures apply is determined based on relevant criteria such as the project’s location and supply conditions. Drafts of administrative notices should not be used as if they were already-enforced ordinances or finalized scoring criteria.

Planned facilities are linked from completion to implementation.

When presenting plans for ESS, on-site power generation, energy management systems, and the like, specify the layout space, capacity, costs, operating methods, installation schedule, and the personnel responsible for implementation. Plans that exist only as conceptual statements and have not been incorporated into the design or budget must be revised during the project implementation phase.

As of November 28, 2025, emergency generators and PPA power demand are excluded from the calculation of on-site generation capacity. The roles of renewable energy procurement plans and grid impact mitigation facilities are reviewed separately. Not all data centers receive the same score based on the same combination of facilities.

We work backward from the licensing schedule to determine the submission date.

Article 28 of the Enforcement Decree stipulates that an assessment report must be submitted at least three months prior to applying for approval, authorization, a permit, or designation for a project subject to this regulation. First, coordinate with the architecture and development division to determine which project approval serves as the basis. Distinguish between the assessment submission date, the period for revisions, and the date the results are reflected; do not treat “received” and “approved” as the same status.

Materials to Prepare at This Stage

  • KEPCO Technical Review Response and Power System Impact Assessment Report
  • Basis for business plans, investment costs, financing, employment, and fiscal contributions
  • Data verifying plans and implementation regarding efficiency improvements, energy storage systems (ESS), and on-site power generation
  • History of existing business approvals; legal basis and supporting documentation when applying for an exemption

Actual Application and Processing Procedures

  1. Assign a person in charge and supporting documents for each item in the official guidelines.
  2. The project owner approves the submitted version and distinguishes between the HWP evaluation report and the supporting PDF documents.
  3. The submission address for the Ministry of Climate Change’s Grid Operation Innovation Division, as stated in the November 28, 2025, notice, is powergrid01@korea.kr입니다. Please double-check the current submission address in the original text before sending.
  4. We respond to requests for corrections and incorporate the results of our review into the design, budget, and schedule. Even when requesting an exclusion, we follow the appropriate verification procedures and use the required forms.
Deliverables to be passed on to the next phase

Results of the power system impact assessment review and related implementation measures. Building permits, KEPCO contracts, and energy usage plan consultations are managed separately.

Which company should I contract with, and for what services?

Companies that prepare or act as agents for power system impact assessments

Selection Date
Target Identification and Technical Review Preparation Phase
Contract Documents
Contract for a Power System Impact Assessment. Distinguish between technical review support and the Ministry of Climate’s assessment report tasks.
Deliverables
Scope and Exclusion Review, Technical and Non-Technical Evaluation Reports, List of Supporting Documents, Submitted Documents, Supplementary Documents, and Table of Results Incorporated
Verify Scope
Includes support for KEPCO applications, accounting and tax reviews, the number of times explanations and revisions were provided during deliberations, and whether compliance with conditions and changes were evaluated.
Selection Criteria
November 28, 2025: It was announced that the designation of an agent for the pilot operation would be postponed. At the time of contracting, verify whether the designation system is in effect, as well as the qualifications and responsible personnel; do not rely on the unconfirmed term “officially designated company.”

Accounting, Tax, and Legal Experts

Selection Date
Before preparing feasibility studies and investment documentation, and prior to major contracts
Contract Documents
Contract for business plan review, tax estimates, and legal/contract advisory services
Deliverables
Basis for calculating funding, investment, and financial contributions; opinions on the review of contract terms
Verify Scope
The verification format, signatures and seals, level of data verification, and responses to additional inquiries required by the applicable evaluation guidelines
Selection Criteria
Professional qualifications and scope of responsibility. Not all projects require the same advisory agreement to be attached as a statutory attachment.

Development PM, CM, Finance, Tenants

Selection Date
When determining business strategies and investment and operational conditions,
Contract Documents
Development management contracts, financial agreements, lease and service contracts, etc.
Deliverables
Overall schedule, cost, and data management; investment prerequisites; tenant requirements and acceptance criteria
Verify Scope
Selection of specialized contractors, coordination of consultations with agencies, and the boundaries of the project owner’s decision-making, as well as responsibilities, compensation, termination, and handover of data
Selection Criteria
The difference between statutory design and evaluation tasks and coordination tasks. Letters of intent to lease and financial agreements are not listed as common mandatory attachments for KEPCO.

Application Forms and Official Submission Channels

Official HWPX FormApplication for Exemption from Power System Impact Assessment ↗

This form is used to submit the grounds for exclusion along with supporting documentation.

Official HWPX Guidelines and AppendicesGuidelines for Preparing Power System Impact Assessment Reports ↗

Review the guidelines for completing each section and the forms related to verification of compliance.

Official HWP GuideGuidance on Procedures and Submission Points for the Pilot Operation of the Power System Impact Assessment ↗

This section provides information on where to submit technical reviews and evaluation reports, as well as the required file formats and associated costs.

Opens the original text from the official agency. The attached Power System Impact Assessment form is from the November 28, 2025, announcement; please verify the applicable form and submission destination at the time of actual submission. Submitting an inquiry on this site does not constitute an application to the agency.

Do you have the data, but are you stuck on the next step?

Please let us know your current stage of the application process and the information you have on hand, and we will review the additional tasks, the role of specialized firms, and the procedure tailored to your project site.

Request for Review of Electricity and Permitting Matters
Start a consultation · Choose a channel