Alcemi Ridham Docks BESF
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-88bca07774994ef5692bbeb7 |
| MW Increase / Decrease | 280 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-88bca07774994ef5692bbeb7 |
| Cumulative Total Capacity (MW) | 280 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-88bca07774994ef5692bbeb7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Alcemi Ridham Docks BESF |
| Customer Name | Alcemi Storage Developments 23 Ltd |
| Connection Site | North Kent Connection Node A 400kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 280.00 |
| Cumulative Total Capacity (MW) | 280.00 |
| MW Effective From | 2033-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000000TPEFAA4 |
| Project Number | PRO-003211 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:43 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:43
Sources EV-88bca07774994ef5692bbeb7Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b278580f94150cb30bcca080628b4aa46393b3fe3fbc9a894df91fba1bc62638
Usage terms NESO Open Data Licence
