Alcemi Ridham Docks BESF
接続登録 · scoping
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| MW Connected | 0 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-88bca07774994ef5692bbeb7 |
| MW Increase / Decrease | 280 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-88bca07774994ef5692bbeb7 |
| Cumulative Total Capacity (MW) | 280 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-88bca07774994ef5692bbeb7 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Project Name | Alcemi Ridham Docks BESF |
| Customer Name | Alcemi Storage Developments 23 Ltd |
| Connection Site | North Kent Connection Node A 400kV Substation |
| Stage | 未取得 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 280.00 |
| Cumulative Total Capacity (MW) | 280.00 |
| MW Effective From | 2033-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000000TPEFAA4 |
| Project Number | PRO-003211 |
| Gate | 1 |
| 原文の状態 | Scoping |
| source_record_id | csv:row:43 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2026-10-01 ・取得確認 2026-10-05
Supported by National Energy SO Open Data
原文内の位置 csv:row:43
根拠 EV-88bca07774994ef5692bbeb7資料SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480