Alcemi Ridham Docks BESF
接入登记 · scoping
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| MW Connected | 0 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-88bca07774994ef5692bbeb7 |
| MW Increase / Decrease | 280 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-88bca07774994ef5692bbeb7 |
| Cumulative Total Capacity (MW) | 280 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-88bca07774994ef5692bbeb7 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Project Name | Alcemi Ridham Docks BESF |
| Customer Name | Alcemi Storage Developments 23 Ltd |
| Connection Site | North Kent Connection Node A 400kV Substation |
| Stage | 未获取 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 280.00 |
| Cumulative Total Capacity (MW) | 280.00 |
| MW Effective From | 2033-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000000TPEFAA4 |
| Project Number | PRO-003211 |
| Gate | 1 |
| 原文状态 | Scoping |
| source_record_id | csv:row:43 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 1条
数据来源 2026-10-01 · 收集核实 2026-10-05
Supported by National Energy SO Open Data
原文位置 csv:row:43
依据 EV-88bca07774994ef5692bbeb7资料SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b278580f94150cb30bcca080628b4aa46393b3fe3fbc9a894df91fba1bc62638