South Korea · Power project

154kV 델타분기 전력구 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 델타분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-431475b5a5fd0b8a85411d50
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5f4da17fccc1f832
stable_project_keyprjtDef:234572:ESB
project_definition234572
first_region_codeESB
manual_source_formatfalse
project_name154kV 델타분기 전력구 건설사업
project_name_list부산 강서지역 전기공급시설 전력구공사(델타분기)
purpose에코델타시티 개발에 따른 전력공급 위한 전력구공사
project_region_detail부산광역시 강서구
project_period_raw2020.03~2030.04
project_scale_rawSHIELD-TBM 2,026M, 전력구 1,970M, 수직구 1개소
responsible_office_raw남부건설본부/직할
equipment_type전력구
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b27669106d385753
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_5f4da17fccc1f832

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5f4da17fccc1f832

Sources EV-431475b5a5fd0b8a85411d50
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 997531832b542ff549be4eb0bf04c526b9a58228681a71e05db06e9aa20e2a4f

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel