Au Gres Solar Park / AUGSP
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 175 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-b4cf876d529ce0ee4050cdd7 |
| Net Summer Capacity (MW) | 175 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-b4cf876d529ce0ee4050cdd7 |
| Net Winter Capacity (MW) | 175 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-b4cf876d529ce0ee4050cdd7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5109 |
| Entity Name | DTE Electric Company |
| Plant ID | 69462 |
| Plant Name | Au Gres Solar Park |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Arenac |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | AUGSP |
| Nameplate Capacity (MW) | 175 |
| Net Summer Capacity (MW) | 175 |
| Net Winter Capacity (MW) | 175 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 8 |
| Planned Operation Year | 2028 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 44.118 |
| Longitude | -83.794 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1643 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1876
Sources EV-46d1d32849c7cbe092ced697Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6605732a820e6a5b38ad213762767f7ddf29119b562c5d77a624f24207abb985
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1643
Sources EV-b4cf876d529ce0ee4050cdd7Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d829c6fee07d751d7d273b59f39f24b61f6e7d6df10270456c8b1baccec57275