United States of America · Generator · plant location

Belle River / 12-2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
DTE Electric Company
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.7756, -82.495

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Belle River / 12-2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)85.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-9254c4a158c08b2949a9ebd2
Net Summer Capacity (MW)75 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-9254c4a158c08b2949a9ebd2
Net Winter Capacity (MW)93 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-9254c4a158c08b2949a9ebd2
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID6034
Plant NameBelle River
Google MapMap
Bing MapMap
Plant StateMI
CountySt Clair
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID12-2
Nameplate Capacity (MW)85.3
Net Summer Capacity (MW)75
Net Winter Capacity (MW)93
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month9
Operating Year1999
Status(OP) Operating
Latitude42.7756
Longitude-82.495
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:5893

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5887

Sources EV-ff71844c3fee438db350a183
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 80c3a6514ab04a0e1a1ae52d138ae3da20dc910345c24a82dc19be16c88e174f

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5893

Sources EV-9254c4a158c08b2949a9ebd2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 bcac2986b666b9ab19b6160034f08c14eb00d5679b2b58d79a9465ef9ae7dcea

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel