Au Gres Solar Park / AUGSP

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)175 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-b4cf876d529ce0ee4050cdd7
Net Summer Capacity (MW)175 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-b4cf876d529ce0ee4050cdd7
Net Winter Capacity (MW)175 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-b4cf876d529ce0ee4050cdd7
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID69462
Plant NameAu Gres Solar Park
Google MapMap
Bing MapMap
Plant StateMI
CountyArenac
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDAUGSP
Nameplate Capacity (MW)175
Net Summer Capacity (MW)175
Net Winter Capacity (MW)175
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month8
Planned Operation Year2028
Status(U) Under construction, less than or equal to 50 percent complete
Latitude44.118
Longitude-83.794
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1643

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1876

Sources EV-46d1d32849c7cbe092ced697
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6605732a820e6a5b38ad213762767f7ddf29119b562c5d77a624f24207abb985

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1643

Sources EV-b4cf876d529ce0ee4050cdd7
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d829c6fee07d751d7d273b59f39f24b61f6e7d6df10270456c8b1baccec57275

Usage terms US government public domain

Source snapshots by date · USA · eia860

Au Gres Solar Park / AUGSP

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5109
Utility NameDTE Electric Company
Plant Code69462
Plant NameAu Gres Solar Park
StateMI
CountyArenac
Generator IDAUGSP
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)175
Summer Capacity (MW)175
Winter Capacity (MW)175
StatusU
Effective Month8
Effective Year2028
Current Month8
Current Year2028
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1SUN
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1876

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1876

Sources EV-46d1d32849c7cbe092ced697
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6605732a820e6a5b38ad213762767f7ddf29119b562c5d77a624f24207abb985

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Au Gres Solar Park / AUGSP

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID69462
Plant NameAu Gres Solar Park
Google MapMap
Bing MapMap
Plant StateMI
CountyArenac
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDAUGSP
Nameplate Capacity (MW)175
Net Summer Capacity (MW)175
Net Winter Capacity (MW)175
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month8
Planned Operation Year2028
Status(U) Under construction, less than or equal to 50 percent complete
Latitude44.118
Longitude-83.794
Original text(U) Under construction, less than or equal to 50 percent complete
source_record_idPlanned:1643

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1643

Sources EV-b4cf876d529ce0ee4050cdd7
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d829c6fee07d751d7d273b59f39f24b61f6e7d6df10270456c8b1baccec57275

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel